Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
29 Sept 2026, 4:00 pm3d left
Xen RnB Div Tangdar
Xen RnB Div Tangdar
Construction of Sanitary Complex at Bhardi Mohallah ward 02 near Daruloom Amroohi. Pyt Amroohi
2026_PWDJK_325126_1
ENIt 71 RnB Div Tangdar 2026-27 RDD Teetwal
Open Tender
Civil Works
Percentage
tangdar
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Convener, purchase committee, Directorate of ISM
₹5,880
Yes
18 Sept 2026
18 Sept 2026
30 Sept 2026
18 Sept 2026
29 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge all kind of soil | 3.02 | Cum | 479.3 | ₹1,447.49 |
| 2 | p/l dry stone soling hand packed complete inclusive all leads lifts loading un loading cost and carriag eof materials form approved nearest source to site eof work complete | 4.3 | cum | 800 | ₹3,440 |
| 3 | Providing laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering all work upto plinth level with1:3:6 ( 1 cement 3 course sand 6 graded stone agg 20 mm nominal size | 4.56 | cum | 5,733.6 | ₹26,145.22 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 5.92 | cum | 7,571.55 | ₹44,823.58 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.18 | cum | 7,788.4 | ₹9,190.31 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth levelMild steel and medium tensile steel bars | 118 | Kg | 115.35 | ₹13,611.3 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platforms. | 11.69 | sqm | 718.2 | ₹8,395.76 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. | 17.1 | sqm | 286.35 | ₹4,896.59 |
| 9 | 12mm Cement plaster of mix:1 : 6 ( 1 cement : 6 fine sand) in super structure upto 10 mtr height incl all carriage etc complete job | 63.68 | sqm | 266.2 | ₹16,951.62 |
| 10 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados over 12 mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete | 16.3 | sqm | 1,229.1 | ₹20,034.33 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.10 MB
BOQ_1097737.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .