Tender Value
₹10.4 L
EMD Value
₹20,900
Closing Date
18 Jun 2026, 6:00 pm
Er Karanjeet Singh
Executive Engineer PWD RandB Division Gandhi Nagar Jammu
Please refer to BOQ
2026_PWDJK_311793_1
Short e-NIT No. DGN/29 of 2026-27 Dated 08-06-2026
Open Tender
Civil Works
30 days
Extn. 1A Trikuta Nagar Jammu
Please refer to e-NIT/SBD
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RandB Division Gandhi Nagar
₹20,900
Jammu
8 Jun 2026
8 Jun 2026
19 Jun 2026
8 Jun 2026
18 Jun 2026
8 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engaging labour as per requirement at site. | 29 | Nos. | 553 | ₹16,037 |
| 2 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. | 54 | Cum | 1,885.95 | ₹1,01,841.3 |
| 3 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge.50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | 18 | Cum | 8,734.85 | ₹1,57,227.3 |
| 4 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 25 mm compacted thickness with bitumen of grade VG- 30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | 360 | Sqm | 298.5 | ₹1,07,460 |
| 5 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.30mm compacted thickness with bitumen of grade VG- 30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity (including all leads, lifts and carriage complete). | 1,484.36 | Sqm | 358.2 | ₹5,31,697.75 |
| 6 | Providing and applying tack coat using hot straight run bitumen of grade–VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On WBM @ 0.75 Kg/sqm. | 360 | Sqm | 75.75 | ₹27,270 |
| 7 | Providing and applying tack coat using hot straight run bitumen of grade–VG-30, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications. On bitumen surface @ 0.50 Kg/sqm. | 1,844.36 | Sqm | 56.1 | ₹1,03,468.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_1009412.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid