Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹82,792.71Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹85,992.42+₹3,199.71 (3.86%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹93,991.72+₹11,199.01 (13.5%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
4 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
C/O CULVERT FROM H/O NASEER AHMAD GANIE S/O IRSHAD AHMAD GANIE WARD NO 9
2026_RDPR_318326_2
NIT39
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹2,000
19 Aug 2026
29 Jul 2026
5 Aug 2026
29 Jul 2026
4 Aug 2026
29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dewatering of trenches including diversion of Nallah during execution of work complete job. | 1 | JOB | 1,000 | ₹1,000 |
| 2 | Earthwork in excavation in all kinds of soil by mechanically/manually means in foundation trenches including dressing of sides and ramming of bottoms with all leads and lifts including disposal of surplus soil as per the directions of Engineer Incharge. | 3.24 | CUM | 592.9 | ₹1,921 |
| 3 | Providing and laying of stone soling, hand packed, including carriage of same from approved source upto site of work complete. | 0.54 | CUM | 1,200 | ₹648 |
| 4 | P/L in position cement concrete in 1:4:8 (1 cement : 4 coarse sand : 8 graded crushed stone aggregate,40mm nominal size) excluding the cost of centering and shuttering but including carriage of all materials from approved sources up to site of work complete. All Work up to plinth level. | 0.54 | CUM | 5,209 | ₹2,812.86 |
| 5 | P/L in position Reinforced cement concrete in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate,20mm nominal size) excluding the cost of centering and shuttering, including carriage of all materials from approved sources up to site of work complete. | 2.1 | CUM | 7,788.4 | ₹16,355.64 |
| 6 | P/L in position Reinforced cement concrete in 1:3:6 (1 cement : 3 coarse sand : 6graded crushed stone aggregate,20mm nominal size) excluding the cost of centering and shuttering, including carriage of all materials from approved sources up to site of work complete. | 4.05 | CUM | 5,733 | ₹23,218.65 |
| 7 | Centering and shuttering i/c strutting, propping etc and removal of form work for cc | 14.4 | sqm | 628 | ₹9,043.2 |
| 8 | Reinforcement of RCC work including straightening , cutting , bending , placing in postion and binding all complete cold twisted bars including all carriage of materials | 194.4 | kg | 120 | ₹23,328 |
| 9 | Carriage of material sand/ bajri | 7.1 | CUM | 337.16 | ₹2,393.84 |
| 10 | Supply ,spreading ,of water bound macadam of graded stone agg of G1 size 90 to 45 mm crushed incl, conslodation with road roller of 8-10 ton capacity , screening watering , binding material ,incl carriage from safapora 42 km average | 9.2 | CUM | 1,650 | ₹15,180 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
BOQ_1048066.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .