| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.3 LAccepted-AOC | ₹13.3 L | 1 | Accepted-AOC Lowest Amount Quoted |
| 2 | 2₹13.4 LRejected-Finance | ₹13.4 L | 2 | Rejected-Finance Highest Quoted |
| Sl No | Description | Qty | Unit | RT CONSTRUCTION L1 | S.KARTHICK L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B TNDSS No 23 & 24VI(S2) VII 9,10 Coloumn Grade Beam Foundation alround Grade Beam Foundation cross wall | 79 | M3 | 263 ₹20,777 | 264 ₹20,856 |
| 2.00 | Supplying and filling in foundation and basement with Stone Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. Coloumn Grade Beam Foundation alround Grade Beam Foundation cross wall | 8 | M3 | 269 ₹2,152 | 270 ₹2,160 |
| 3.00 | Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specifications.TNDSS NO 28 V, VI(S2) V, VI(S5A) VII Coloumn Grade Beam Foundation alround Grade Beam Foundation cross wall | 9 | M3 | 5,358 ₹48,222 | 5,360 ₹48,240 |
| 4.00 | Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29mm height for plane surfaces in all floors with cross bracings using mild steel sheets of size 30cm x 55cm and 10 gauge stiffened welded with mild steel sheets of size 25mm x 25mm x 3mm for boarding and laid over silver oak (country wood). Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification TNDSS No. 30 &86 a). For Footing | 98 | M2 | 525 ₹51,450 | 526 ₹51,548 |
| 5.00 | b). For Column | 29 | M2 | 1,302 ₹37,758 | 1,310 ₹37,990 |
| 6.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - Column Mat Windrow Column Pedestal Coloumn Grade Beam Foundation alround Grade Beam Foundation cross wall | 25 | M3 | 8,361.5 ₹2.1 L | 8,365 ₹2.1 L |
| 7.00 | Supplying fabricating and placing in position of TMT steel rods including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. TNDSS No,97 V,VI (S6) VII (S6) VII-3 | 2,001 | Kg | 91.8 ₹1.8 L | 92 ₹1.8 L |
| 8.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, Two part sand and Four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. TNDSS No.24 | 18 | M3 | 6,659.5 ₹1.2 L | 6,650 ₹1.2 L |
| 9.00 | Supply and fixing of ISA equal angle for truss including cost of Material conveyance of all material, fabrication and fixing charges etc.Complete as per ISI with rust preventive primer & ready to assemble condition for easy installation at site including dismantling making necessary with power drill to the accessories such as supplying and fixing holdfasts, plastic bush inserts receiver runner bottom shock absorbers etc. Complete as Directed by the Departmental Officer. | 4,000 | Kg | 108 ₹4.3 L | 112 ₹4.5 L |
| 10.00 | Providing Galvalume sheet roofing using 6mm thick including all cost of materials at the site and necessary bolt and nots including all labour charges etc. complete as per standard specification. Roof | 200 | M2 | 1,113 ₹2.2 L | 1,115 ₹2.2 L |
Updated dates
Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
5 Mar 2026, 3:00 pmClosed
Executive Officer
Town Panchayat Office, Thirumalayampalayam
Providing SWM Vehicle Parking Shed at Ward No.02 Office Building Campus in Thirumalayampalayam Town Panchayat
2026_DTP_659309_1
92-3/2026/A1
Open Tender
Civil Works - Others
180 days
Thirumalayampalayam
As per norms
2 documents required · 2 mandatory
₹0
₹16,000
17 Apr 2026
17 Feb 2026
5 Mar 2026
17 Feb 2026
5 Mar 2026
17 Feb 2026
17 Feb 2026 - 5 Mar 2026
Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B TNDSS No 23 & 24VI(S2) VII 9,10 Coloumn Grade Beam Foundation alround Grade Beam Foundation cross wall
Supplying and filling in foundation and basement with Stone Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. Coloumn Grade Beam Foundation alround Grade Beam Foundation cross wall
Cement Concrete 1:4:8 Mix (one part cement, four part sand and Eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specifications.TNDSS NO 28 V, VI(S2) V, VI(S5A) VII Coloumn Grade Beam Foundation alround Grade Beam Foundation cross wall
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.29mm height for plane surfaces in all floors with cross bracings using mild steel sheets of size 30cm x 55cm and 10 gauge stiffened welded with mild steel sheets of size 25mm x 25mm x 3mm for boarding and laid over silver oak (country wood). Joists of size 10cm x 6.5 cm dia spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre etc complete complying with standard specification TNDSS No. 30 &86 a). For Footing
b). For Column
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - Column Mat Windrow Column Pedestal Coloumn Grade Beam Foundation alround Grade Beam Foundation cross wall
Supplying fabricating and placing in position of TMT steel rods including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. TNDSS No,97 V,VI (S6) VII (S6) VII-3
Plain Cement Concrete 1:2:4 Mix (one part cement, Two part sand and Four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. TNDSS No.24
Supply and fixing of ISA equal angle for truss including cost of Material conveyance of all material, fabrication and fixing charges etc.Complete as per ISI with rust preventive primer & ready to assemble condition for easy installation at site including dismantling making necessary with power drill to the accessories such as supplying and fixing holdfasts, plastic bush inserts receiver runner bottom shock absorbers etc. Complete as Directed by the Departmental Officer.
Providing Galvalume sheet roofing using 6mm thick including all cost of materials at the site and necessary bolt and nots including all labour charges etc. complete as per standard specification. Roof
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_791027.pdf
finsummary_791027.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.72 MB
BOQ_791027.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid