| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.3 LAccepted-Finance 162 1 NADUTHERU VENKATESWARA NAGAR ACHARAMPATTU IRUMBAI P O 605 111 | PUDUCHERRY | PUDUCHERRY | PUDUCHERRY | 605111 | ₹63.3 L | L1 | Accepted-Finance L-1 |
| 2 | L2₹73.6 L+₹10.3 L (16.3%)Rejected-Finance | ₹73.6 L+₹10.3 L (16.3%) | L2 | Rejected-Finance L-2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Meeting NIT criteria |
| 4 | Rejected-Technical NO 10 44 GURU SARAVANA FLAT 19TH STREET NANGANALLUR CHENNAI 600 061 | CHENNAI | TAMIL NADU | 600061 | - | - | Rejected-Technical Not Meeting NIT Criteria, |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Meeting NIT Criteria |
| Sl No | Description | Qty | Unit | Hiranya Construction L2 | J.P.M. Building Construction and Interior Works L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
(a) All kinds of soil. | 2,090 | Cum | 186 ₹3,88,740 Lowest | 200 ₹4,18,000 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 2,090 | Cum | 30 ₹62,700 Lowest | 150 ₹3,13,500 |
| 3.00 | Supplying, spreading and filling of M sand in ground level including watering, ramming and dressing complete as per the direction of Engineer in Charge. | 180 | Cum | 2,210 ₹3,97,800 | 1,900 ₹3,42,000 Lowest |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -
All work up to plinth level :
(a) 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 180 | Cum | 4,380 ₹7,88,400 Lowest | 5,000 ₹9,00,000 |
| 5.00 | Construction of Subgrade with Moorum/gravel soil brought out from approved quarry out side the airport premises. The complete operation will include spreading the Moorum with dozer, dressing, levelling, providing camber, grading with motor grader and consolidating with vibratory roller 8-10 tonne capacity in layers not exceeding 20cm in depth to achieve 95% of the field density including making good the undulation etc. to meet requirement of table 300-2 of MoRTH Specifications, Technical Specifications and drawings complete and directions of Engineer-in-Charge. The embankment constructios should satisfy minimum CBR value of 15 to 20as per design requirement. (Cost includes all leads ,taxes, royalty, operations and obtaining field density from the approved lab or Govt Engineering college) | 930 | Cum | 1,014 ₹9,43,020 | 700 ₹6,51,000 Lowest |
| 6.00 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
a) With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 | 350 | Cum | 2,600 ₹9,10,000 | 1,900 ₹6,65,000 Lowest |
| 7.00 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. | 270 | Cum | 2,800 ₹7,56,000 | 2,200 ₹5,94,000 Lowest |
| 8.00 | Construction of dry lean cement concrete sub base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in-charge. | 240 | Cum | 4,650 ₹11,16,000 | 3,499 ₹8,39,760 Lowest |
| 9.00 | Providing and laying 80mm thick faciory made cement concrete interlocking paver block of M -40 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. | 1,540 | Sqm | 1,095 ₹16,86,300 | 849 ₹13,07,460 Lowest |
| 10.00 | Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of all dirt, scales, oil, grease and other foreign material etc. and lining out complete.
a) New work (Two or more coats) | 40 | Sqm | 222 ₹8,880 | 150 ₹6,000 Lowest |
Tender Value
₹82.2 L
EMD Value
₹2.5 L
Closing Date
25 Jul 2026, 6:00 pmClosed
Sr. Manager (E-C)
AAI, Puducherry Airport, Puducherry
Construction of Fire Pit at Runway 25 south side at Puducherry Airport
2026_AAI_282547_1
AAI/PDY/SM (E-C)/Fire Pit/2026-27/
Open Tender
Civil Works
Works
60 days
AAI, Puducherry Airport
As per Tender Document
8 documents required · 8 mandatory
₹1,180
₹2.5 L
18 Aug 2026
3 Jul 2026
27 Jul 2026
4 Jul 2026
25 Jul 2026
4 Jul 2026
4 Jul 2026 - 11 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
(a) All kinds of soil. | 2,090 | Cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 2,090 | Cum | - | - |
| 3 | Supplying, spreading and filling of M sand in ground level including watering, ramming and dressing complete as per the direction of Engineer in Charge. | 180 | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -
All work up to plinth level :
(a) 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 180 | Cum | - | - |
| 5 | Construction of Subgrade with Moorum/gravel soil brought out from approved quarry out side the airport premises. The complete operation will include spreading the Moorum with dozer, dressing, levelling, providing camber, grading with motor grader and consolidating with vibratory roller 8-10 tonne capacity in layers not exceeding 20cm in depth to achieve 95% of the field density including making good the undulation etc. to meet requirement of table 300-2 of MoRTH Specifications, Technical Specifications and drawings complete and directions of Engineer-in-Charge. The embankment constructios should satisfy minimum CBR value of 15 to 20as per design requirement. (Cost includes all leads ,taxes, royalty, operations and obtaining field density from the approved lab or Govt Engineering college) | 930 | Cum | - | - |
| 6 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
a) With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 | 350 | Cum | - | - |
| 7 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. | 270 | Cum | - | - |
| 8 | Construction of dry lean cement concrete sub base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineer-in-charge. | 240 | Cum | - | - |
| 9 | Providing and laying 80mm thick faciory made cement concrete interlocking paver block of M -40 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. | 1,540 | Sqm | - | - |
| 10 | Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of all dirt, scales, oil, grease and other foreign material etc. and lining out complete.
a) New work (Two or more coats) | 40 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
TD.pdf
Tender Documents • 9.37 MB
BOQ_329730.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .