Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-AOC 6 6 ARYABARTA DURGAPUR BARDHAMAN WB 713206 | DURGAPUR | BARDHAMAN | WB | 713206 | ₹23.5 L | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹23.6 LRejected-AOC | ₹23.6 L | L2 | Rejected-AOC high rate |
| 3 | L3₹23.6 LRejected-AOC SURYAPALLY KALNA ROAD NARI P BARDHAMAN WB 713101 | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713101 | ₹23.6 L | L3 | Rejected-AOC high rate |
Tender Value
₹23.5 L
EMD Value
₹47,100
Closing Date
16 Feb 2026, 3:00 pmClosed
General Manager
23B Netaji Subhas Road 3rd Floor Kolkata 700 001
Construction of Additional Class Room
2026_WBAIC_998893_2
AIC/AED/NIeT-540/25-26
Open Tender
CIVIL WORKS
90 days
Bardhaman
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
₹47,100
Yes
West Bengal Agro Industries Corporation Limited
7 Apr 2026
4 Feb 2026
19 Feb 2026
4 Feb 2026
16 Feb 2026
4 Feb 2026
9 Feb 2026
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor. (A) [Pakur Variety] (a) 1:3:6 proportion
25mm. thick damp proof course with cement concrete with stone chips (1:1.5:3) [with graded stone aggregate 10 mm nominal size] and admixture of water proofing compound as per manufacturer's specification followed by two coat of polymer based paint, (1st coat after 4 to 5 days of concrete laying and 2 nd coat just before brick masonry work) as directed (cost of water proofing compound & polymer based paint to be paid separately).( Chequering not required over concrete or painted surface).
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth
Brick work with 1st class bricks in cement mortar (1:6) (b) In superstructure, ground floor
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
125 mm. thick brick work with 1st class bricks in cement mortar (1:3) in ground floor. Extra for using approved H.B netting in every third layer in 16 & 17 of subhead A above in any floor
Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame exluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be correted upto three decimals). (e) Sal : Malayasian
Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar, end bifurcated with necessary screws etc. by cement concrete(1:2:4) as per direction. (Cost of concrete will be paid separately) (a) 40mm X 6mm, 250mm Length
Iron butt hinges of approved quality fitted and fixed with steel screws, with ISI mark. (vii) 100mm. X 58mm. X 1.90mm.
Iron socket bolt of approved quality fitted and fixed complete. (d) 225mm long x 10mm dia bolt.
Iron socket bolt of approved quality fitted and fixed complete. (c) 150mm long x 10mm dia bolt.
i) Iron hasp bolt of approved quality fitted and fixed complete (oxidised) with 16mm dia rod with centre bolt and round fitting. (c) 300mm long
Iron catch hook of approved quality fitted and fixed to shutter and chowkat. (c) 10mm dia x 300mm long.
Anodised aliminium D-type handle of approved quality manufactured from extruded section conforming to I.S. specification (I.S. 230/72) fitted and fixed complete: (a) With continuous plate base (Hexagonal/ Round rod) (i) 125 mm grip x 12 mm dia rod.
Supplying, fitting and fixing hinge cleat in position excluding the cost hinge and other fiffitngs. b) with 75mm iron Butt-hinge ii) Sal : Malayasian
Renewing hinged cleat with old hinge and new screws. ii) Sal : Malayasian
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement (iii) 35 mm. thick
Styles and rails of wooden shutters fitted and fixed complete. (Payment to be made on area of new work only). In Ground Floor: (iv) 40mm. Thick shutter. (a) Ordinary Teak Wood.
a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (i) Grill weighing above 10 Kg./sq.mtr and up to 16 Kg./sq. mtr.
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar, (a) 10 mm thick plaster
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar, (a) 15 mm thick plaster
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:6 cement mortar, (a) 20 mm thick plaster
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:6 cement mortar, (a) 15 mm thick plaster
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m.
White washing including cleaning and smoothening surface thoroughly. All floors : (c) Three coats (on new works only).
Applying decorative cement based paint of approved quality after preparing the surface including scraping the same thoroughly (plastered or concrete surface) as per manufacturer's specification. In Ground floor: (iii) Two coats.
(b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
(a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc.
(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : With other than hi-gloss of approved quality- (iv) Two coats (with any shade except white)
(b) On steel or other metal surface : With super gloss (hi-gloss) - (iv) Two coats (with any shade except white)
Supplying, fitting & fixing UPVC pipes with all necessary clamps nails, including making holes in walls (110mm dia) single socketted 3meter length.
Cost of Ramp
Electrification
Furniture
Sub Total
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_2446176.pdf
techsummary_2446176.pdf
BOQ Comparative Chart
xlsx
finsummary_2446176.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tendernotice_2.pdf
PDF • 1.11 MB
BOQ_2446176.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid