Reconstruction Work of the Damage Culvert at Mahua Kheda to G.T. Road Gurushikran Road in Km-1
2026_CEALG_1187904_2
5055/Cashier(C.D.-1 A.)-A.C./26-27 Date 09-09-2026
Open Tender
Civil Works - Bridges
Percentage
90 days
Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.6 L
Yes
Office of The SE, Aligarh Circle, P.W.D., Aligarh
19 Sept 2026
19 Sept 2026
30 Sept 2026
19 Sept 2026
30 Sept 2026
19 Sept 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 250 | cum | 155 | ₹38,750 |
| 2 | Supply & laying of N.P.-4 Hume Pipe 1000 mm Dia (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 22.5 | Rm | 4,700 | ₹1,05,750 |
| 3 | Brick soling with bricks laid on edge completeincluding preparation of subgrade to required camber and including supply of bricks, filling joints with local earth spreading a blind coat of 1cm(3/8") depth of local earth P.I. 5 to 7 or sand over the entire surface and including labours, T&P etc. required for proper completion of work. Ch-5, S.I. 762(b) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 220 | Sqm | 315 | ₹69,300 |
| 4 | Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. As per Morth Specification. Sr 2.04 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 22.5 | Rm | 935 | ₹21,037.5 |
| 5 | Dismantling of Granular courses and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 9 | Cum | 87 | ₹783 |
| 6 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres As per Morth Specification 2.04 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 45 | Cum | 700 | ₹31,500 |
| 7 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 160 | Sqm | 5.5 | ₹880 |
| 8 | Dewatering work of undergrounding water as well as surface water with the help of diesel engine pumping set during earth work in excavation of foundation for laying lean concrete and brick work in foudation (or as required), hire charging of pumping set, Fuel charge, labour and other T&P including cost of operation as per requirement at site & as direction by Engineer-in-Charge (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 120 | Hours | 380 | ₹45,600 |
| 9 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. As per Morth Specification No.-15.01, 304(B) (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 290 | Cum | 130 | ₹37,700 |
| 10 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification. As per MORTH Specification No. 304, S.I. 12.3 (Including cost of all Material, labour, T&P, Labour Cess and All other Taxes but Excluding G.S.T.), As per Direction by E/I. | 14.75 | Cum | 1,500 | ₹22,125 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.73 MB
BOQ_2237470.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .