SE/Civil/MTPS-II
SE/Civil/MTPS-II
Providing Chain link fencing with gate arrangements around the Pump room and Civil/Electrical section offices and other miscellaneous works in Thermal Nagar 3 of MTPS-II.
2022_EB_229877_1
SE/Civil/MTPS-II/OT-08/2022-23
Open Tender
Civil Works - Others
Works
90 days
MTPS-II/Mettur Dam
2 documents required · 2 mandatory
₹0
₹3,800
Yes
9 May 2022
21 Apr 2022
7 May 2022
21 Apr 2022
6 May 2022
21 Apr 2022
Amount
Earth work excavation in all types of soil for leveling the site and depositing on bank with a head load of 100m over initial lead of 10m and lift of 2m as directed by the Engineer in charge including all labour charges, leads & lifts, T&Ps etc., complete.
Providing PCC1:4:8 using 40mm HBG metal for foundation as directed by the Engineer at site, including cost of all materials, labour charges, curing, leads, lifts, etc. complete.
Providing PCC 1:3:6 using 20mm HBG metal for foundation, Kerb wall as directed by the Engineer at site including cost of all materials, labour charges, curing, leads, lifts, etc.complete.
Fixing of 50x50x3.15 mm GI chainlink fencing with 3.15mm dia. GI wire, both end tightness as directed by Engineer at site including cost of all materials, labour,leads &lifts, etc., complete. (Chain link fencing will be supplied departmentally at free of cost)
Providing and placing in position of fencing posts & Gate posts using MS angles, MS flats, MS plates, MS channels, MS Square bars & single / double leaf MS gates of required size, fabricated with MS Pipes of 50mm NB alround including cost of all materials, cutting, bending, holes for bolt/unt, labour, lead, lifts etc., complete.
Painting the structural steel work with two coats of enamel paint of approved quality and colour over a coat of primer including cost of all materials, labour charges, scaffolding charges, brushes, lead, lift, etc., complete.
Plastering in CM 1:5, 12mm thick including cost of all materials, scaffolding charges, labour charges, curing, T&P, lead, lift, etc., complete.
ARP Engineering Contractor
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .