Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.9 LAdmitted-Fee/PreQual/Technical/Finance AT KAITHADA GOSANI PO GURANDI DIST GAJAPATI ODISHA PIN 761210 | GURANDI | GAJAPATI | ODISHA | 761210 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹9.1 L+₹18,396.96 (2.07%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹9.1 L+₹21,643.49 (2.44%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹9.4 L+₹48,697.84 (5.49%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹9.4 L+₹54,216.93 (6.11%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.8 L
EMD Value
₹10,822
Closing Date
21 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DFO, Paralakhemundi
Near Forest Gate, Paralakhemundi
CONSTRUCTION OF MINISTERIAL STAFF QUARTERS No. 02
2026_DFOPA_146183_1
DFO-PKD-04/2026-27/02
Open Tender
Civil Works - Buildings
Percentage
90 days
Forest Colony, Inside DFO Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,822
Yes
23 Nov 2026
14 Nov 2026
23 Nov 2026
14 Nov 2026
21 Nov 2026
14 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete as directed by the Engineer in charge. | 34.25 | Cum. | 282.88 | ₹9,688.64 |
| 2 | Supplying and filling in foundation trenches and plinth, ditches with sand well watered and rammed in layers not exceeding 23 cm. in depth with all lead and lift including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, sundries, T&P required for the work etc. complete in all respect as per direction by the Engineer in charge. | 27.71 | Cum. | 531.19 | ₹14,719.27 |
| 3 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard hand broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, taxes of all materials and cost of all labours, T&P etc complete as per the direction of the Engineer -in –charge. | 9.81 | Cum. | 5,326.63 | ₹52,254.24 |
| 4 | Random rubble H.G. stone Masonry in Cement mortar (1:6) in foundation and pinth including cost, convenyance royality & taxes etc. of all materials, including labour charges with all leads, lifts & delfts, watering and curring etc complete. | 18.77 | Cum. | 4,367.53 | ₹81,978.54 |
| 5R.C.C. work of M - 20 grade with 20 mm and down grade HGCB chips incl. hoisting, laying concrete in layers not exc. 15cm thick, compacting by means of vibrator, curing,finishing the exposed surface smooth, dewatering, shoring, shuttering if necessary at the time of laying concrete with cost, conveyance, royalty & taxes of all materials, cost of labour and T&p etc. all complete as per the direction of E.I.C. | |||||
| 5.01 | RCC COLUMN FOUNDATION. | 4.52 | Cum. | 6,059.88 | ₹27,390.66 |
| 5.02 | RCC PLINTH BEAM / PLINTH BAND | 2.46 | Cum. | 6,925.34 | ₹17,036.34 |
| 5.03 | RCC COLUMN SUPERSTRUCTURE | 1.25 | Cum. | 17,462.52 | ₹21,828.15 |
| 5.04 | RCC LINTEL | 1.64 | Cum. | 13,662.72 | ₹22,406.86 |
| 5.05 | R.C.C CHAJJA | 9.29 | Sqm. | 1,226.02 | ₹11,389.73 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.53 MB
MinisterialQuarterDTCN02.pdf
Tender Documents • 1.21 MB
BOQ_620845.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .