Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.2 L+₹2,000 (1.66%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.2 L+₹2,550 (2.11%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.3 L+₹9,100 (7.54%)Admitted-Finance TEHSIL TRINTHA DISTRICT REASI 182311 JAMMU AND KASHMIR | REASI | JAMMU AND KASHMIR | 182311 | L4 | Admitted-Finance | |
| 5 | L5₹1.4 L+₹16,700 (13.8%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ABHILASH BALI L1 | M/S PARAS ELECTRICAL L2 | M/S P.S ASSOCIATES L5 | M/S SURAJ PARTAP SINGH L4 | M/S Hardev Singh L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00Laying of LT Line on ST Poles 8.0 Mtr long with ACSR Squirrel (Supplying including Transportation , Carriage, Erection, Testing & Commissioning Complete Job) | ||||||||
| 1.01 | 8 Mtr long ST poles (ST-410 SP15) | 5 | Nos | 14,800 ₹74,000 Lowest | 15,500 ₹77,500 | 17,500 ₹87,500 | 19,000 ₹95,000 | 17,000 ₹85,000 |
| 1.02 | 30 mm2 ACSR conductor | 0.6 | Kms | 37,000 ₹22,200 | 35,000 ₹21,000 | 32,500 ₹19,500 | 31,500 ₹18,900 Lowest | 36,000 ₹21,600 |
| 1.03 | Mukki Clamps for ST 8 mtr poles | 10 | Kgs | 150 ₹1,500 | 100 ₹1,000 | 50 ₹500 Lowest | 240 ₹2,400 | 100 ₹1,000 |
| 1.04 | 16kN Polymer Shackle Insulators | 10 | Nos | 30 ₹300 Lowest | 70 ₹700 | 50 ₹500 | 40 ₹400 | 100 ₹1,000 |
| 1.05 | Nuts and bolts | 5 | Kgs | 120 ₹600 | 140 ₹700 | 100 ₹500 Lowest | 130 ₹650 | 120 ₹600 |
| 1.06 | Danger Plate | 5 | Nos | 150 ₹750 | 120 ₹600 | 100 ₹500 Lowest | 100 ₹500 Lowest | 120 ₹600 |
| 1.07 | Earthing complete of line poles | 5 | Nos | 800 ₹4,000 | 900 ₹4,500 | 2,500 ₹12,500 | 1,050 ₹5,250 | 500 ₹2,500 Lowest |
| 1.08 | Cement bottoming 1:2:4 mix as per REC standards .45cum/Pole | 5 | Nos | 2,500 ₹12,500 | 2,500 ₹12,500 | 2,500 ₹12,500 | 750 ₹3,750 Lowest | 1,500 ₹7,500 |
| 1.09 | Red oxide | 5 | Ltr | 100 ₹500 Lowest | 100 ₹500 Lowest | 200 ₹1,000 | 200 ₹1,000 | 150 ₹750 |
Tender Value
₹1.6 L
EMD Value
₹3,500
Closing Date
30 Oct 2025, 2:00 pmClosed
Executive Engineer Electric Division JPDCL Reasi
Executive Engineer Electric Division JPDCL Reasi
Supply, Installation, Testing and Commissioning for laying of LT line at New Treasury Office Dharmari under the jurisdiction of Electric Division JPDCL Reasi
2025_PDD_292909_1
e NIT 31 of 2025-26
Open Tender
Electrical Works
Turn-key
45 days
Dharmari
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
Executive Engineer Electric Division JPDCL Reasi
₹3,500
Yes
4 Nov 2025
24 Oct 2025
31 Oct 2025
24 Oct 2025
30 Oct 2025
24 Oct 2025
24 Oct 2025 - 27 Oct 2025
Amount
Laying of LT Line on ST Poles 8.0 Mtr long with ACSR Squirrel (Supplying including Transportation , Carriage, Erection, Testing & Commissioning Complete Job)
8 Mtr long ST poles (ST-410 SP15)
30 mm2 ACSR conductor
Mukki Clamps for ST 8 mtr poles
16kN Polymer Shackle Insulators
Nuts and bolts
Danger Plate
Earthing complete of line poles
Cement bottoming 1:2:4 mix as per REC standards .45cum/Pole
Red oxide
Aluminium Paint
Galvanised Stay Set with 50x8mm stay clamp, guy insulator, anchor plate, nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
M/S PARAS ELECTRICAL (BID ID -2622995)
M/S Hardev Singh (BID ID -2621709)
M/S SURAJ PARTAP SINGH (BID ID -2622864)
M/S P.S ASSOCIATES (BID ID -2622376)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
SBD31.pdf
Tender Documents • 1.88 MB
BOQ_945652.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .