Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16,200Accepted-AOC 6 7 MECHWELL FITTINGS PVT LTD 123 RAVI IND ESTATE BILESHWAR PURA TAL KALOL PO CHATTRAL GUJARAT INDIA CHATTRAL | ₹16,200 | L1 | Accepted-AOC L1 |
| 2 | L1₹2.2 LAccepted-AOC A131 STEEL CHAMBER TOWER PLOT NO 514 KALAMBOLI RAIGAD MAHARASHTRA 410218 | RAIGAD | MAHARASHTRA | 410218 | ₹2.2 L | L1 | Accepted-AOC L1 |
| 3 | L1₹2.9 LAccepted-AOC ROYAL INDU HUB PLOT NO A 31 A UNIT NO 4 REAL FORGE AND FITTING KAMAN ROYAL INDU HUB PLOT NO A 31 A UNIT NO 4 KAMAN BHIWANDI ROAD NEXT TO KAMAN POLICE CHOWKI NEAR JAIN MANDIR KAMAN ROAD VASAI E | ₹2.9 L | L1 | Accepted-AOC L1 |
| 4 | L1₹6.2 LAccepted-AOC 25 390 392 SHANKAR MENSION GR FLOOR S V P ROAD NEAR HARKISHANDAS HOSPITAL MUMBAI MAHARASHTRA 400004 | MUMBAI | MAHARASHTRA | 400004 | ₹6.2 L | L1 | Accepted-AOC L1 |
| 5 | L1₹12.9 LAccepted-AOC OFFICE NO 608 6 TH FLOOR 89 91 DURGADEVI DARSHAN BLDG DURGADEVI STREET 4KUMBHARWADA MUMBAI | ₹12.9 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | MECH WELL FITTINGS PVT LTD | HI TECH METAL AND TUBES | STAR METAL AND TUBES | REAL FORGE AND FITTING | Scorodite Stainless India Private Limited | P K Tubes and Fittings Pvt Ltd | AMARDEEP STEEL CENTRE | CHIRANJIV STEEL CENTRE | KWALITY TUBES | CHAMPAK STEEL AND ENGG CO | RAJENDRA PIPING AND FITTINGS | SAWAN ENGINEERS PVT LTD | RAHUL FORGE AND PIPE FITTINGS |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SUPPLY OF INCONEL/ MONEL- PIPES as per Material Requisition | ||||||||||||||||
| 1.01 | PIPE,EFW,INCONEL (H2 SER.), B36.19M, BW ENDS,SCH 20, EFW, PLATE SHALL BE HOT, ROLLED ASTM B443 GR.1, ANNEALED, WELD FACTOR E = 1.00, PIPE B474 N06625 GR1 CL.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004 | 32 | Mtrs | 88,79,424 ₹1,04,77,720.32 | 1,15,10,752 ₹1,35,82,687.36 | - | - | 1,12,07,616 ₹1,32,24,986.88 | - | 56,96,000 ₹67,21,280 Lowest | - | 92,61,504 ₹1,09,28,574.72 | 93,32,416 ₹1,10,12,250.88 | 68,83,200 ₹81,22,176 | - | - |
| 1.02 | PIPE,SMLS,MONEL, B36.19M, BW ENDS,SCH 40S, SEAMLESS, PIPE B165 UNS N04400, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001 | 22 | Mtrs | 8,09,622 ₹9,55,353.96 | 6,60,462 ₹7,79,345.16 | - | - | 9,49,960 ₹11,20,952.8 | - | 4,46,600 ₹5,26,988 | - | - | 4,07,836 ₹4,81,246.48 Lowest | 5,09,960 ₹6,01,752.8 | - | - |
| 1.03 | PIPE,SMLS,INCONEL (H2 SER.), B36.19M, BW ENDS,SCH 20, SEAMLESS, ANNEALED, B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004 | 6 | Mtrs | 22,83,666 ₹26,94,725.88 | 15,96,006 ₹18,83,287.08 | - | - | 18,25,200 ₹21,53,736 | - | 8,34,000 ₹9,84,120 Lowest | - | - | - | 16,11,000 ₹19,00,980 | - | - |
| 1.04 | PIPE,SMLS,INCONEL (H2 SER.), B36.19M, BW ENDS,SCH 40S, SEAMLESS, ANNEALED, B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004 | 6 | Mtrs | 3,19,740 ₹3,77,293.2 | 2,55,246 ₹3,01,190.28 | - | - | 2,97,180 ₹3,50,672.4 | - | 1,37,400 ₹1,62,132 Lowest | - | - | 1,43,520 ₹1,69,353.6 | 2,15,400 ₹2,54,172 | - | - |
| 1.05 | PIPE,SMLS,INCONEL (H2 SER.), B36.19M, BW ENDS,SCH 40S, SEAMLESS, ANNEALED, B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004 | 6 | Mtrs | 6,63,660 ₹7,83,118.8 | 5,36,946 ₹6,33,596.28 | - | - | 6,20,100 ₹7,31,718 | - | 2,82,000 ₹3,32,760 Lowest | - | - | 2,98,080 ₹3,51,734.4 | 5,19,000 ₹6,12,420 | - | - |
| 1.06 | PIPE,SMLS,INCONEL (H2 SER.), B36.19M, PE,SCH 40S, SEAMLESS, ANNEALED, PIPE B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004 | 6 | Mtrs | 2,37,600 ₹2,80,368 | 2,35,566 ₹2,77,967.88 | - | - | 2,22,300 ₹2,62,314 | - | 1,07,400 ₹1,26,732 | - | - | 1,07,040 ₹1,26,307.2 Lowest | 1,89,000 ₹2,23,020 | - | - |
| 1.07 | PIPE,SMLS,INCONEL (H2 SER.), B36.19M, PE,SCH 80S, SEAMLESS, ANNEALED, PIPE B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004 | 6 | Mtrs | 92,124 ₹1,08,706.32 | 1,15,206 ₹1,35,943.08 | - | - | 1,20,000 ₹1,41,600 | - | 47,400 ₹55,932 | - | - | 42,720 ₹50,409.6 Lowest | 86,400 ₹1,01,952 | - | - |
| 1.08 | PIPE,SMLS,INCONEL (H2 SER.), B36.19M, PE,SCH 80S, SEAMLESS, ANNEALED, PIPE B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004 | 6 | Mtrs | 1,29,000 ₹1,52,220 | 1,54,626 ₹1,82,458.68 | - | - | 1,59,000 ₹1,87,620 | - | 59,400 ₹70,092 | - | - | 58,080 ₹68,534.4 Lowest | 1,34,400 ₹1,58,592 | - | - |
| 2.00SUPPLY OF INCONEL/ MONEL- FITTINGS as per Material Requisition | ||||||||||||||||
Tender Value
Refer Docs
Closing Date
16 Jun 2025, 3:00 pmClosed
Mr. Nilesh Sathe
tkUIPL- Mumbai
SUPPLY OF INCONEL and MONEL- PIPES/ FITTINGS/ FLANGES FOR P25 PROJECT AT IOCL PANIPAT REFINERY
2025_REFHQ_185161_1
6745-PPM-000-CA-PI109
Open Tender
Mechanical - Piping, materials, flanges, valves, seals
Supply
84 days
IOCL Panipat Refinery
Please refer Tender documents.
6 documents required · 6 mandatory
Exempted
24 Dec 2025
22 May 2025
17 Jun 2025
22 May 2025
16 Jun 2025
2 Jun 2025
SUPPLY OF INCONEL/ MONEL- PIPES as per Material Requisition
PIPE,EFW,INCONEL (H2 SER.), B36.19M, BW ENDS,SCH 20, EFW, PLATE SHALL BE HOT, ROLLED ASTM B443 GR.1, ANNEALED, WELD FACTOR E = 1.00, PIPE B474 N06625 GR1 CL.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
PIPE,SMLS,MONEL, B36.19M, BW ENDS,SCH 40S, SEAMLESS, PIPE B165 UNS N04400, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
PIPE,SMLS,INCONEL (H2 SER.), B36.19M, BW ENDS,SCH 20, SEAMLESS, ANNEALED, B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
PIPE,SMLS,INCONEL (H2 SER.), B36.19M, BW ENDS,SCH 40S, SEAMLESS, ANNEALED, B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
PIPE,SMLS,INCONEL (H2 SER.), B36.19M, BW ENDS,SCH 40S, SEAMLESS, ANNEALED, B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
PIPE,SMLS,INCONEL (H2 SER.), B36.19M, PE,SCH 40S, SEAMLESS, ANNEALED, PIPE B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
PIPE,SMLS,INCONEL (H2 SER.), B36.19M, PE,SCH 80S, SEAMLESS, ANNEALED, PIPE B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
PIPE,SMLS,INCONEL (H2 SER.), B36.19M, PE,SCH 80S, SEAMLESS, ANNEALED, PIPE B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
SUPPLY OF INCONEL/ MONEL- FITTINGS as per Material Requisition
ECC RED,INCONEL (H2 SER.), B16.9, BW ENDS,SCH NON-STD, LW,100% RADIOGRAPHY, ANNEALED, WELD FACTOR E = 1.00, B366 Gr.WPNCMC-WX, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004, 3.SCHEDULE INDICATED IS FOR HIGHER SIZE
RCPL,INCONEL (H2 SER.), 3000,0, B16.11, SW ENDS, FORGED, ANNEALED, B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
TEE,INCONEL (H2 SER.), 3000,0, B16.11, SW ENDS, FORGED, ANNEALED, B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
HCPL,INCONEL (H2 SER.), 3000,0, B16.11, SW ENDS, ANNEALED, B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
HCPL,INCONEL (H2 SER.), 3000,0, B16.11, SW ENDS, ANNEALED, B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
NIPPLE,INCONEL,100MM (H2 SER.), B36.19M, PE x NPT(M),SCH 80S, SEAMLESS, LENGTH = 100 mm, ANNEALED, NIPPLE B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
NIPPLE,INCONEL,100MM (H2 SER.), B36.19M, PE x PE,SCH 80S, SEAMLESS, LENGTH = 100 mm, ANNEALED, NIPPLE B444 UNS N06625 GR.1, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
ELB,90 DEG,LR,MONEL, B16.9, BW ENDS,SCH 40S, SEAMLESS, B366 Gr.WPNC-S, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
ELB,90 DEG,INCONEL (H2 SER.), B16.9, BW ENDS,SCH 20, LW,100% RADIOGRAPHY, LR, ANNEALED, WELD FACTOR E = 1.00, B366 GR.WPNCMC-WX, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
ELB,45 DEG,INCONEL (H2 SER.), B16.9, BW ENDS,SCH 20, LW,100% RADIOGRAPHY, LR, ANNEALED, WELD FACTOR E = 1.00, B366 Gr.WPNCMC-WX, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
SUPPLY OF INCONEL/ MONEL- FLANGES as per Material Requisition
WN FLG,MONEL, 300,0, B16.5, BW ENDS,SCH 40S,RF, FLANGE B564 UNS N04400, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001
WN FLG,INCONEL (H2 SER.), 600,0, B16.5, BW ENDS,SCH 20,RF, ANNEALED, FLANGE B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
WN FLG,INCONEL (H2 SER.), 600,0, B16.5, BW ENDS,SCH 20,RF, ANNEALED, FLANGE B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
WN FLG,INCONEL (H2 SER.), 600,0, B16.5, BW ENDS,SCH 40S,RF, ANNEALED, FLANGE B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
WN FLG,INCONEL (H2 SER.), 600,0, B16.5, BW ENDS,SCH 40S,RF, ANNEALED, FLANGE B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
WN FLG,INCONEL (H2 SER.), 600,0, B16.5, BW ENDS,SCH NON-STD,RF, ANNEALED, FLANGE B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
BF,INCONEL (H2 SER.), 600,0, B16.5, RF, ANNEALED, FLANGE B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
BF,INCONEL (H2 SER.), 600,0, B16.5, RF, ANNEALED, FLANGE B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
BF,INCONEL (H2 SER.), 600,0, B16.5, RF, ANNEALED, FLANGE B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
SW FLG,INCONEL (H2 SER.), 600,0, B16.5, SW END,SCH 40S,RF, ANNEALED, FLANGE B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
SW FLG,INCONEL (H2 SER.), 600,0, B16.5, SW END,SCH 80S,RF, ANNEALED, FLANGE B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
SW FLG,INCONEL (H2 SER.), 600,0, B16.5, SW END,SCH 80S,RF, ANNEALED, FLANGE B564 UNS N06625, ADD. INFORMATION, 1.FOR GENERAL TECHNICAL REQUIREMENTS, REFER DOC. 6745-PIP-000-EC-0001, 2.ADDITIONAL REQUIREMENTS FOR H2 SERVICE, ACC. TO DOC. 6745-PIP-000-EC-0004
STAR METAL AND TUBES
REAL FORGE AND FITTING
AMARDEEP STEEL CENTRE
CHAMPAK STEEL AND ENGG CO
RAHUL FORGE AND PIPE FITTINGS
PNB870LH+3/4"+-+26.7+3.91+-+-
EFW871FH+10"+-+273+6.35+-+-
stage.html
html • 0.10 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .