| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹16.7 L+₹2.6 L (18.1%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹17.4 L+₹3.3 L (23.3%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is third lowest | |
| 4 | L4₹17.6 L+₹3.5 L (24.9%)Accepted-Finance KARMULLAPUR BHAGGADWA BAZAR BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | L4 | Accepted-Finance Rate quoted is forth lowest | |
| 5 | L5₹20.3 L+₹6.1 L (43.5%)Accepted-Finance BLOCK S HOUSE 75 MOHAN GARDEN WEST DELHI DELHI 110059 | WEST DELHI | DELHI | 110059 | L5 | Accepted-Finance Rate quoted is fifth lowest |
Tender Value
₹22.6 L
EMD Value
₹23,000
Closing Date
23 Dec 2020, 4:00 pmClosed
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
MONTHLY ROUTINE/ENERGENCY PATROLLING AND PERIODIC CUTTING/LOPPING and CHOPPING OF TREES IN LINE CORRIDOR, THERMOGRAPHY AND JUMPER TIGHTENING OF 132KV TRANSMISSION LINES UNDER ETD RAEBARELI
2020_UPTCL_536055_1
T. NO. 87/ETCS/2020-21
Open Tender
Electrical Works
Item Wise
365 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
SE ETC Sultanpur
₹23,000
28 Dec 2020
7 Dec 2020
24 Dec 2020
7 Dec 2020
23 Dec 2020
7 Dec 2020
7 Dec 2020 - 23 Dec 2020
Amount
Tower to tower patrolling (quarterly 04 times in a year) of following 132 KV Transmission Lines from one end to other end and submission of patrolling report within 07 days after completion of each patrolling in triplicable in prescribed proforma mentioning stolen/missing tower parts and tower accessories such as missing Danger/Phase/number plate trees/tree branches and bamboo koy falling in a line corridor, damage to Earthwire, Conductor, Jumpers, Insulator & other line accessories damage to foundation, Coping, Chimnay, Earthing at etc will the help of patrolling team.
132 KV Bachhrawan-Bachhrawan Line (14.92kmx04 times=59.68km)
132 KV Harchandpur TSS Line (16.522kmx04 times=66.088km)
132 KV Amawan-Bachhrawan Line (28.03kmx04 times=112.12km)
132 KV Bighapur-Sareni Line (38.399 kmx04 times=153.596km)
132 KV Amawan-Salon Line (39.08kmx04 times=156.32km)
132 KV Bachhrawan-Sareni Line (65.41kmx04 times=261.64km)
Emergency Patrolling of all the above 132 KV transmission line by experience person in case of any tripping breakdown of line the emergency patrolling includes checking of tower, conductor, earthwire, insulator, clamp, fitting etc. to location the defect fault deficiency the emergency patrolling has to be start within 6 hours after receiving the call of SDO / JE
Upto 20 km
Above 20 km to 50 km
Lopping / Chopping of various species of tree branches falling under the corridor with all due care of safety and precaution to avoid any damage in near by building, crop & power/telephone lines near cicinity of the tress all the above lines along with throwing of cut branches at least 50 meter away from the line corridor as per details below:
132 KV Bachhrawan-Bachhrawan Line
132 KV Harchandpur TSS Line
132 KV Amawan-Bachhrawan Line
132 KV Bighapur-Sareni Line
132 KV Amawan-Salon Line
132 KV Bachhrawan-Sareni Line
Cutting of bamboo bushes falling under line corridor with all due care of safety and precaution to avoid any damaged in near by building, crop & power / telephone lines passing near vicinity of the tress all the above lines along with throwing of cut branches at least 50 mtr away from the line corridor as per details below:
132 KV Bachhrawan-Bachhrawan Line
132 KV Harchandpur TSS Line
132 KV Amawan-Bachhrawan Line
132 KV Bighapur-Sareni Line
132 KV Amawan-Salon Line
132 KV Bachhrawan-Sareni Line
Lopping / Chopping of spiniferous babool tree / branches falling under the corridor with all due care of safety and precaution to avoid any damage in near by building, crop & power/telephone lines near cicinity of the tress all the above lines along with throwing of cut branches at least 50 meter away from the line corridor as per details below:
132 KV Bachhrawan-Bachhrawan Line
132 KV Harchandpur TSS Line
132 KV Amawan-Bachhrawan Line
132 KV Bighapur-Sareni Line
132 KV Amawan-Salon Line
132 KV Bachhrawan-Sareni Line
Replacement of missing tower parts along with fabrication work and fixing after shifting of tower parts, nuts and bolts from UPPTCL store to work site of above mentioned lines.
Checking and tightening of jumpers of tension tower including replacement of damaged jumpers fasteners if needed and including cartage of material from store to site of work of 132 KV transmission lines under ETD, Raebareli
Re-fixing and tightening of dislocated shifted vibration damper to its place including replacement if required in 132 KV transmission lines under ETD, Raebareli
Attending breakdown due to failure of disc insulator and replacement of tension / suspension strenght along with mobilization of skilled gang including carriage of material from store to site and site to store after completion work.
Tension string (120 KN disc insulator)
Suspension string (70 KN disc insulator)
Jumper replacement
Hot Spot Scaning of section towers, mid span joints, repair sleeves & jumpers of following transmission lines one time before summers.
132 KV Bachhrawan-Bachhrawan Line (14.92km)
132 KV Harchandpur TSS Line (16.522km)
132 KV Amawan-Bachhrawan Line (28.03km)
132 KV Bighapur-Sareni Line (38.399 km)
132 KV Amawan-Salon Line (39.08km)
132 KV Bachhrawan-Sareni Line (65.41km)
DINESH GENERAL ORDER AND SUPPLIERS
M/S R.K. ERACTORS
M/S Rudra Construction
M/S KSHITIJ ENTERPRISES
M/S SHEKHAR ENGINEERING WORKS
M/S Shree Constraction
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .