Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.3 LAdmitted-Finance | ₹54.3 L | L1 | Admitted-Finance |
| 2 | L2₹56.3 LAdmitted-Finance | ₹56.3 L | L2 | Admitted-Finance |
| 3 | L3₹58.3 LAdmitted-Finance | ₹58.3 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S S N ENTERPRISES L3 | THE UNIVERSAL CONSTRUCTION L1 | TECHCON ENGINEERS L2 |
|---|---|---|---|---|---|---|
| 10.00 | Part-(A) Preventive Routine Maintenance and general upkeep of C.W. Pumps, Lub. Water Pump, piping, Valves, NRVs, Tanks, etc. of unit 4 & 5. | 730 | Job | 1,080 ₹7.9 L | 1,005 ₹7.3 L | 1,043 ₹7.6 L |
| 20.00 | Part-(A) Operation up-keeping routine maintenance of of EOT Crane of C.W. Pump House in general shift. From (8.30 hrs. to 17.30 hrs) including one hour lunch time. | 600 | Shift | 612 ₹3.7 L | 570 ₹3.4 L | 591 ₹3.5 L |
| 30.00 | Part-(A) Operation of EOT cranes besides above hrs. in emergency, during holiday and Sunday on overtime basis as per site requirement. | 1,200 | hours | 52 ₹62,400 | 49 ₹58,800 | 50 ₹60,000 |
| 40.00 | Part-(B) Rectification/Replacement of Butter-fly valve sheet (Rubber Gasket) without repair/replacement of Retaining Ring as per scope of work. | 32 | Job | 3,517 ₹1.1 L | 3,274 ₹1.0 L | 3,396 ₹1.1 L |
| 50.00 | Part-(B) Rectification/Replacement of Butter-fly valve sheet (Rubber Gasket) with repair/replacement of Retaining Ring as per scope of work. | 4 | Job | 5,315 ₹21,260 | 4,948 ₹19,792 | 5,132 ₹20,528 |
| 60.00 | Part-(B) Servicing of Gearbox of Butterfly valves of C.W. Pumps. | 42 | Job | 9,152 ₹3.8 L | 8,521 ₹3.6 L | 8,837 ₹3.7 L |
| 70.00 | Part-(B) Decoupling, Alignment, Coupling of Pump with its motor in addition to O/H of pump as and when required (On request of Electrical Maintenance Division) | 16 | Job | 9,682 ₹1.5 L | 9,015 ₹1.4 L | 9,349 ₹1.5 L |
| 80.00 | Part-(C) Complete overhauling/ Breakdown maintenance (in case of failure of pump due to any reason) of C. W. Pumps by carrying out the following work as detailed in scope of work. Including following works. (a)Decoupling of motor, dismantling of coupling of the pump. (b) Dismantling of Thrust bearing and pump, after dismantling of cooling pipes. (c) Cleaning, checking & revisioning /changing of worn out parts/components. (d) Assembling of the pump. (e) Alignment of the pump with motor after clearance from motor side.(f) Coupling of motor after proper alignment. (g) Commissioning of pump set | 10 | Job | 2,16,150 ₹21.6 L | 2,01,243 ₹20.1 L | 2,08,696 ₹20.9 L |
| 90.00 | Part-© Epoxy painting on inside/outside surface of C.W. Pumps elements with all associated pipe line/valve etc. including supply of epoxy paint as per technical specification details. | 10 | Job | 31,456 ₹3.1 L | 29,286 ₹2.9 L | 30,371 ₹3.0 L |
| 100.00 | Part-© Replacement of Spherical Roller Bearing/ Maintenance work of NRR/ any type of breakdown maintenance work in which dismantling of CW Pump up to discharge elbow is required. | 4 | Job | 62,638 ₹2.5 L | 58,318 ₹2.3 L | 60,478 ₹2.4 L |
Tender Value
₹52.7 L
EMD Value
₹1.1 L
Closing Date
29 Dec 2025, 6:00 pmClosed
SE O and MC I BTPS Anpara
Office of SE O and MC I BTPS Anpara
Preventive Routine and Overhauling and Breakdown Maintenance and General Upkeep of C W Pumps and associated System of 2x500 MW BTPS Anpara
2025_RVUNL_1092020_1
03/CAD/BTPS/2025-26
Open Tender
Repair and Maintenance Works
730 days
Anpara
As per PQC
2 documents required · 2 mandatory
₹1,180
Dy CAO CFA and BO BTPS Anpara
₹1.1 L
21 Jan 2026
19 Nov 2025
31 Dec 2025
19 Nov 2025
29 Dec 2025
19 Nov 2025
Part-(A) Preventive Routine Maintenance and general upkeep of C.W. Pumps, Lub. Water Pump, piping, Valves, NRVs, Tanks, etc. of unit 4 & 5.
Part-(A) Operation up-keeping routine maintenance of of EOT Crane of C.W. Pump House in general shift. From (8.30 hrs. to 17.30 hrs) including one hour lunch time.
Part-(A) Operation of EOT cranes besides above hrs. in emergency, during holiday and Sunday on overtime basis as per site requirement.
Part-(B) Rectification/Replacement of Butter-fly valve sheet (Rubber Gasket) without repair/replacement of Retaining Ring as per scope of work.
Part-(B) Rectification/Replacement of Butter-fly valve sheet (Rubber Gasket) with repair/replacement of Retaining Ring as per scope of work.
Part-(B) Servicing of Gearbox of Butterfly valves of C.W. Pumps.
Part-(B) Decoupling, Alignment, Coupling of Pump with its motor in addition to O/H of pump as and when required (On request of Electrical Maintenance Division)
Part-(C) Complete overhauling/ Breakdown maintenance (in case of failure of pump due to any reason) of C. W. Pumps by carrying out the following work as detailed in scope of work. Including following works. (a)Decoupling of motor, dismantling of coupling of the pump. (b) Dismantling of Thrust bearing and pump, after dismantling of cooling pipes. (c) Cleaning, checking & revisioning /changing of worn out parts/components. (d) Assembling of the pump. (e) Alignment of the pump with motor after clearance from motor side.(f) Coupling of motor after proper alignment. (g) Commissioning of pump set
Part-© Epoxy painting on inside/outside surface of C.W. Pumps elements with all associated pipe line/valve etc. including supply of epoxy paint as per technical specification details.
Part-© Replacement of Spherical Roller Bearing/ Maintenance work of NRR/ any type of breakdown maintenance work in which dismantling of CW Pump up to discharge elbow is required.
Part-© Replacement of expansion bellow/Butterfly valves (Ist & IInd Isolation valve) of CW Pump discharge line as per scope of work.
Part-© Overhauling of EOT crane of CW Pump House as per scope of work
PART-D Overhauling of Air release vents/valves installed on C.W. Duct of Unit 4 & 5.
PART-D Plugging/Clamping of Air vent pipe to minimize water leakage
PART-D Replacement of Air Vent pipe/valve.
PART-D Changing of packing of manholes of CW ducts
PART-E Re-rubberisation of old and worn out cutless rubber lined bearing in bronze shell of Intermediate shaft of C.W. Pumps Material: Synthetic Nitrile Length of Bronze shell : 320 mm I.D. of Bronze shell : 184 mm ID of bearing after rubberisation: 160mm
PART-E Re-casting of old & damaged bronze shell and rubberisation of rubber lined bearing of Intermediate shaft of CW pump Material: - Bronze and synthetic Nitrile Length of Bronze shell : 320 mm O. D. of Bronze shell: 200 mm. I.D. of Bronze shell : 184 mm O.D. of flange of Bronze shell : 264 mm Thickness of flange of Bronze shell:14mm (As per drawing)
PART-E Re-rubberisation of old and worn out Hanger Roller of KONE Lift Material: -Synthetic Rubber/Teflon O.D. of Hanger Roller with rubber: -85 mm Width of Hanger Roller: -19 mm
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Document.pdf
Tender Documents • 1.56 MB
BOQ_2006384.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid