Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAdmitted-Finance HOLDING NO 41 C O MIR AZAM KHAN KHAN RASJID MOHALLA JAMURIA BAZAR MAIN JAMURIA PASCHIM WEST BURDWAN WEST BENGAL INDIA 713336 | JAMURIA | PASCHIM BARDHAMAN | WEST BENGAL | 713336 | ₹9.1 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical JAMURIA BAZAR PO JAMURIA HAT BARDHAMAN WEST BENGAL INDIA 713336 | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713336 | - | - | Rejected-Technical TC recommendation |
| Sl No | Description | Qty | Unit | M/S MIR AZAM KHAN L1 |
|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||
| 2.00 | Stone cleaning and making pack below RCC for smooth leveling | 30 | M3 | 540 ₹16,200 Lowest |
| 3.00 | Cutting stone at floor for RCC | 30 | M3 | 4,975 ₹1,49,250 Lowest |
| 4.00 | RCC work along drift from (1:2:4) | 30 | M3 | 7,985 ₹2,39,550 Lowest |
| 5.00 | Supply of 10mm 12mm rod for RCC including carrying to the site | 2,400 | kg | 99 ₹2,37,600 Lowest |
| 6.00 | Cetering and shuttering sides | 18 | m2 | 750 ₹13,500 Lowest |
| 7.00 | Loading and unloading materials | 75 | tubs | 904 ₹67,800 Lowest |
| 8.00 | Avg lead of materials upto 750 meter | 75 | tubs | 100 ₹7,500 Lowest |
| 9.00 | Carrying and lifting of empty tub from ug to surface | 75 | tubs | 485 ₹36,375 Lowest |
| 10.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 1,38,199.5 ₹1,38,199.5 Lowest |
Tender Value
₹9.1 L
EMD Value
₹11,400
Closing Date
27 Jul 2026, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Construction of RCC foundation along RVII to RVIIA drift for marching of LHCM and other machineries at SSpur Colliery.
2026_ECL_361981_1
ECL/GM/BA/E TENDER/26-27/Min/007 Dt 13.07.2026
Open Tender
Miscellaneous Works
Item Rate
30 days
Shyamsundarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹11,400
8 Aug 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
13 Jul 2026 - 17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item Description/ Heading | - | - | - | - |
| 2 | Stone cleaning and making pack below RCC for smooth leveling | 30 | M3 | - | - |
| 3 | Cutting stone at floor for RCC | 30 | M3 | - | - |
| 4 | RCC work along drift from (1:2:4) | 30 | M3 | - | - |
| 5 | Supply of 10mm 12mm rod for RCC including carrying to the site | 2,400 | kg | - | - |
| 6 | Cetering and shuttering sides | 18 | m2 | - | - |
| 7 | Loading and unloading materials | 75 | tubs | - | - |
| 8 | Avg lead of materials upto 750 meter | 75 | tubs | - | - |
| 9 | Carrying and lifting of empty tub from ug to surface | 75 | tubs | - | - |
| 10 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.68 MB
Tendernotice_2.pdf
PDF • 0.99 MB
BOQ_374883.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .