Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC N A | ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹3.3 L (2.60%)Rejected-Finance 4 190 RAMANATHAPURAM MAIN ROAD C K MANGALAM THIRUVADANAI TK RAMANATHAPURAM 623402 | RAMANATHAPURAM | TAMIL NADU | 623402 | ₹1.3 Cr+₹3.3 L (2.60%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Disqualified |
| 4 | Rejected-Technical 1 292 SOUTHSTREET THIYAGAVAN SERI RAMANATHAPURAM 623530 | RAMANATHAPURAM | TAMIL NADU | 623530 | - | - | Rejected-Technical Technically Disqualified |
| Sl No | Description | Qty | Unit | S ANBUNATHAN L1 | M.R AND CO L2 |
|---|---|---|---|---|---|
| 1.00Renewal of the Road from from MRL07 - ECR Thiruvadanai SP Pattinam Link Road Via Pattamangalam (Km 0/0 - 5/175 ) in Thiruvadanai Block | |||||
| 2.00 | Clearingthe Scrub jungle including all labour charges for burring and burning etc., | 4,968 | SQM | 5.9 ₹29,311.2 Lowest | 6 ₹29,808 |
| 3.00 | Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305. | 2,328.75 | CUM | 131.2 ₹3,05,532 Lowest | 135 ₹3,14,381.25 |
| 4.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | |||||
| 5.00 | Km 0/0-1/0 | 4.6 | CUM | 5,217 ₹23,998.2 Lowest | 5,375 ₹24,725 |
| 6.00 | km 1/0-2/0 | 4.2 | CUM | 5,224 ₹21,940.8 Lowest | 5,380 ₹22,596 |
| 7.00 | Km 2/0-3/0 | 4.07 | CUM | 5,230 ₹21,286.1 Lowest | 5,387 ₹21,925.09 |
| 8.00 | km 3/0-4/0 | 3.37 | CUM | 5,237 ₹17,648.69 Lowest | 5,395 ₹18,181.15 |
| 9.00 | km 4/0-5/0 | 3.32 | CUM | 5,244 ₹17,410.08 Lowest | 5,402 ₹17,934.64 |
| 10.00 | km 5/0-5/175 | 0.78 | CUM | 5,250 ₹4,095 Lowest | 5,408 ₹4,218.24 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
5 Jun 2025, 3:00 pmClosed
The Additional Collector (Dev.)
DRDA, Ramanathapuram
Ramanathapuram District - Thiruvadanai Block - TN14-72R
2025_RDTN_141448_2
DIPR/2253/Tender/2025
Open Tender
Civil Works - Roads
Item Rate
120 days
DRDA
As per Tender Document
4 documents required · 4 mandatory
₹0
₹1.3 L
29 Oct 2025
20 May 2025
5 Jun 2025
20 May 2025
5 Jun 2025
20 May 2025
Amount
Renewal of the Road from from MRL07 - ECR Thiruvadanai SP Pattinam Link Road Via Pattamangalam (Km 0/0 - 5/175 ) in Thiruvadanai Block
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Earthwork excavating & depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MOST 301 - 305.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Applying tack coat over BT surface (not treated with primer) using 2.5 to 3.0 Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.km 0/0-1/0
Road Marking with Hot Applied Thermo plastic Compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone
Supply and fixing of HM stone
Provision for CIB Name Board.
Providing and fixing of Sign Board.
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M.R AND CO (BID ID -618498)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .