| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.2 LAccepted-AOC | ₹33.2 L | L1 | Accepted-AOC l1 |
| 2 | L2₹34.2 LRejected-Finance N A | ₹34.2 L | L2 | Rejected-Finance L2rejected |
| Sl No | Description | Qty | Unit | RATHAKRISHNAN R L1 | Rajagopal L2 |
|---|---|---|---|---|---|
| 1.00Strengthening of Karuppasamykovilpatti Burial ground road 0/0-0/620 in Muthulapuram Panchayat in Pudur Block (R - 270) | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 1,041.6 | M2 | 6.36 ₹6,624.58 | 6.55 ₹6,822.48 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out | 334.8 | M3 | 140.38 ₹46,999.22 | 144.66 ₹48,432.17 |
| 4.00 | Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | 139.5 | M3 | 701.44 ₹97,850.88 | 722.84 ₹1.0 L |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2 | 279 | M3 | 2,577.05 ₹7.2 L | 2,655.69 ₹7.4 L |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 1,860 | M2 | 86.82 ₹1.6 L | 89.47 ₹1.7 L |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all | 1,860 | M2 | 20.35 ₹37,851 | 20.97 ₹39,004.20 |
| 8.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 46.5 | M3 | 11,604.9 ₹5.4 L | 11,959.03 ₹5.6 L |
| 9.00 | Provision for HM Stone | 3 | No. | 574.36 ₹1,723.08 | 591.89 ₹1,775.67 |
| 10.00 | Sign Board | 2 | No. | 4,996.5 ₹9,993 | 5,148.97 ₹10,297.94 |
Tender Value
₹33.6 L
EMD Value
₹33,650
Closing Date
10 Feb 2026, 3:00 pmClosed
Joint Director/Project Director(FAC)
DRDA Thoothukudi
Stengthening of Muthulapuram AD Burial ground road KM 0/0 - 0/380 and Karuppasamy Kovilpatti Burial ground road 0/0 - 0/620 in Muthulapuram Panchayat at Pudur Panchayat Union at Thoothukudi District Under DMFT Mines 2025-26 Package No TN/TUT-23/2025
2026_RDTN_650536_21
RDTUT/370/2025/A13 dated 31.01.26
Open Tender
Civil Works - Roads
180 days
DRDA THOOTHUKUDI
As per Tender Document
4 documents required · 4 mandatory
₹0
₹33,650
05.02.2026
13 May 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
10 Feb 2026
4 Feb 2026
5 Feb 2026
Strengthening of Karuppasamykovilpatti Burial ground road 0/0-0/620 in Muthulapuram Panchayat in Pudur Block (R - 270)
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for HM Stone
Sign Board
Provision for 60cm Circle ( Mandatory Sign Board)
Providing and fixing reflective road studs on curves
Providing and laying of Hot applied Thermoplastive compound 2.5mm thick
Strengthening of Muthalapuram AD Burial ground road KM 0/0 - 0/380 in Muthulapuram Panchayat in Pudur Block (R - 116)
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out
Picking the existing BT Surface including all labour charges etc complete
Providing and Laying Red Gravel side berms including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for HM Stone
Sign Board
Provision for 60cm Circle ( Mandatory Sign Board)
Providing and fixing reflective road studs on curves
Providing and laying of Hot applied Thermoplastive compound 2.5mm thick
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Pudur23.pdf
Tender Documents • 0.83 MB
BOQ_780657.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid