| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹94.8 L+₹85,997 (0.92%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹95.8 L+₹1.8 L (1.92%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹96.6 L+₹2.6 L (2.77%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹98.8 L+₹4.9 L (5.20%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SURYAA CONSTRUCTION L10 | Aakar Infra Engineers PVT Ltd L9 | Gyana Ranjan Mohanty L3 | M/S Kailash Chandra Samal L6 | M/s. Jay Jagannath Enterprises L8 | M/s. P N Construction L2 | NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED L5 | M/S RAMESH CHANDRA MOHANTY L1 | M/S BHAIRAB CHARAN SWAIN L4 | M/s.P K Industries L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation for foundation trenches of drain works in hard / cargo mixed soil, bituminous roads etc. cutting up to required depth and transporting the excavated materials by private trucks within a lead of 5KM (avg.) and disposing the same with levelling, dressing etc. including cost of all labour, T&P, hire charges of all machineries, Operator expenses, Port entry fees, excludng GST etc. complete as directed by the Engineer-in-charge. | 4,812.5 | Each Cubic Meter | 250 ₹12,03,125 | 240 ₹11,55,000 | 80 ₹3,85,000 | 60 ₹2,88,750 | 100 ₹4,81,250 | 80 ₹3,85,000 | 50 ₹2,40,625 | 48 ₹2,31,000 Lowest | 55 ₹2,64,687.5 | 60 ₹2,88,750 |
| 2.00 | Engagement of 5HP Diesel Pump sets with required length of suction and delivery pipes and placing those pumps at required locations inside prohibited area for dewatering of stagnated water with supply of all labour, T&P, hire and running charges of Pump, fuel and consumable including all transportation charges, Operator expenses etc. complete with Gate entry fee, excluding GST etc. all complete as directed by Engineer-in-charge. [(i)No idle charges will be paid. Pumps will be engaged as and when required (ii) Payment will be made on logsheet basis]. | 1,600 | Each Hour | 500 ₹8,00,000 | 300 ₹4,80,000 | 20 ₹32,000 | 30 ₹48,000 | 100 ₹1,60,000 | 12 ₹19,200 Lowest | 20 ₹32,000 | 20 ₹32,000 | 50 ₹80,000 | 50 ₹80,000 |
| 3.00 | Supplying, mixing, transporting, laying in proper level and grade Cement Concrete 1:3:6 (1 Cement : 3Coarse Sand : 6 hard granite graded chips of 20mm & below size Crusher Broken) for shear key wall, hoisting, laying in layers, by use of vibrator, finished smooth to the exposed surface to proper level & gradient, curing etc. with supply of all materials, labour, T&P, royalties, hire & running charges of all machineries, transportation charges, water charges, Port entry fees, all taxes but excluding GST, etc. all complete as directed by the Engineer-in-charge. | 220 | Each Cubic Meter | 600 ₹1,32,000 Lowest | 5,000 ₹11,00,000 | 3,200 ₹7,04,000 | 3,100 ₹6,82,000 | 4,300 ₹9,46,000 | 2,100 ₹4,62,000 | 3,501 ₹7,70,220 | 3,400 ₹7,48,000 | 3,500 ₹7,70,000 | 3,600 ₹7,92,000 |
| 4.00 | Cement Concrete of M-20 grade (using crusher broken hard granite chips of 12mm. to 20mm. size of approved quality for RCC work), mixing in a Batching Plant of required capacity, transporting the cocncrete by any approved means including admixture in recommended proportion as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength & durability with hoisting, laying, compacting by mechanical vibrator, curing etc. with supply of all materials, labour, T&P, all taxes, Port entry fees, royalties, tollage, all transportation charges, all testing, cost of design mix, engagement, hire & running charges of all machinereis etc. all complete excluding GST and as directed by the Engineer-in-charge. [N.B.: (1)The item is excluding cost of form work, cost of binding wire, cost of steel & labour charges for bending & binding of steel (2) The Agency should be conducted trial mix of M20 in the Port approved Govt. Laboratory & same will be approved by Competent Authority, (3) Nos. and different test will be conducted as per Relevant IS code, (4) Caliberation Certificate of Batching Plant to be submitted to receive the M20 concrete & (5) Computer generated slip to be submitted by the Agency in every batch of M20 concrete] | 899 | Each Cubic Meter | 7,000 ₹62,93,000 | 6,250 ₹56,18,750 | 4,300 ₹38,65,700 | 4,250 ₹38,20,750 | 4,100 ₹36,85,900 | 4,000 ₹35,96,000 | 4,190 ₹37,66,810 | 3,999 ₹35,95,101 Lowest | 4,050 ₹36,40,950 | 4,800 ₹43,15,200 |
| 5.00 | Providing, rigid, smooth, leakproof, centering & shuttering with form works made of ply/ steel shutters for R.C.C works, applying coaltar/ lubricant on the ply/steel surface after each use, dismantling the same after stripping period over including supply of all labour, materials, T&P, royalties, gate entry fees, excluding GST etc. complete as directed by the Engineer-in-charge. | 7,616 | Each Square Meter | 450 ₹34,27,200 | 380 ₹28,94,080 | 100 ₹7,61,600 | 150 ₹11,42,400 | 240 ₹18,27,840 | 98 ₹7,46,368 | 150 ₹11,42,400 | 80 ₹6,09,280 Lowest | 85 ₹6,47,360 | 100 ₹7,61,600 |
| 6.00 | Supply of reinforcement Fe-500 TMT confirming to I.S. Specifications or SAIL/ TISCON/ VIZAG brands including cutting, straightening, bending, binding & placing the grills in position for RCC works including cost of binding wire of 18 to 20 gauge with supply of all materials, labour, transportation, T&P, tollage, Port entry fees, testing charges etc. including all taxes excluding G.S.T all complete as directed by the Engineer in charge. N.B: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid. | 709.7 | Each Quintal | 7,000 ₹49,67,900 | 8,500 ₹60,32,450 | 5,000 ₹35,48,500 Lowest | 5,050 ₹35,83,985 | 5,300 ₹37,61,410 | 5,500 ₹39,03,350 | 5,000 ₹35,48,500 Lowest | 5,400 ₹38,32,380 | 5,450 ₹38,67,865 | 6,400 ₹45,42,080 |
| 7.00 | Dismantling the exisitng damaged/ unused RCC strucutres including stacking the useful material for reuse and disposing the debrises within 5.00Km. lead away from the site with supply of all materials, labour, T&P, all taxes, tollage, royalties, Port entry fees, safety arrangements for workmen, excluding G.S.T etc. all complete as directed by the Engineer in-charge. | 376 | Each Cubic Meter | 2,500 ₹9,40,000 | 800 ₹3,00,800 | 350 ₹1,31,600 | 300 ₹1,12,800 | 1,300 ₹4,88,800 | 70 ₹26,320 Lowest | 700 ₹2,63,200 | 500 ₹1,88,000 | 600 ₹2,25,600 | 900 ₹3,38,400 |
| 8.00 | Providing necessary shoring & shuttering in the excavated portion and providing necessary props to support the existing excavated pit upto the required extent including all labour, materials, transportation, gate entry fees, staging, scafolding, safety of workmen, all taxes but excluding G.S.T etc. as directed by the Engineer-in-charge. | 1,200 | Each Square Meter | 500 ₹6,00,000 | 400 ₹4,80,000 | 80 ₹96,000 | 150 ₹1,80,000 | 400 ₹4,80,000 | 220 ₹2,64,000 | 40 ₹48,000 Lowest | 100 ₹1,20,000 | 100 ₹1,20,000 | 100 ₹1,20,000 |
| 9.00 | Refilling with available excavated earth (excluding boulder, rubbish, debris, iron ore, coal and other deleterious materials etc.) in sides of foundation etc., in layers not exceeding 20cm. thickness, compacting the deposited earth in layers by watering and ramming including all labour, tools, equipments, all lead & lift, all taxes but excluding G.S.T etc. complete as directed by the Engineer-in-charge. | 992 | Each Cubic Meter | 150 ₹1,48,800 | 90 ₹89,280 | 30 ₹29,760 | 40 ₹39,680 | 70 ₹69,440 | 60 ₹59,520 | 60 ₹59,520 | 25 ₹24,800 Lowest | 25 ₹24,800 Lowest | 40 ₹39,680 |
| 10.00 | Engagment of Excavator for cleaning of over burden stock material & disposing the debrises at identified debris yards inside harbour area with supply of all labour, T&P, POL, transportation, hire & running charges of machineries, operator expenses with tollage, Port entry fees, all taxes but excluding GST etc. complete as per direction Engineer-in-charge. [(i) No idle charges will be paid (ii) Logsheet msut be maintained for this]. | 24 | Each Hour | 900 ₹21,600 | 850 ₹20,400 | 900 ₹21,600 | 800 ₹19,200 | 1,000 ₹24,000 | 800 ₹19,200 | 500 ₹12,000 Lowest | 600 ₹14,400 | 600 ₹14,400 | 800 ₹19,200 |
Tender Value
₹1.0 Cr
EMD Value
₹2.1 L
Closing Date
31 Dec 2020, 5:00 pmClosed
N Patro ,EE, HWD-II,PPT
Office of the Harbour Works Division No.II, Engineering Department, Paradip Port Trust, First Floor, Administrative Building, Tele -06722-223001 Mob-9556898061
Construction and renovation of drainage system around MCHP inside prohibited area.
2020_MoS_602512_1
CE/HW-II-W-01/19/404
Open Tender
Civil Works
Works
240 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Yes
As per eTCN and TD.
₹2.1 L
Yes
13 Jul 2021
11 Dec 2020
4 Jan 2021
11 Dec 2020
31 Dec 2020
11 Dec 2020
Amount
Earth work in excavation for foundation trenches of drain works in hard / cargo mixed soil, bituminous roads etc. cutting up to required depth and transporting the excavated materials by private trucks within a lead of 5KM (avg.) and disposing the same with levelling, dressing etc. including cost of all labour, T&P, hire charges of all machineries, Operator expenses, Port entry fees, excludng GST etc. complete as directed by the Engineer-in-charge.
Engagement of 5HP Diesel Pump sets with required length of suction and delivery pipes and placing those pumps at required locations inside prohibited area for dewatering of stagnated water with supply of all labour, T&P, hire and running charges of Pump, fuel and consumable including all transportation charges, Operator expenses etc. complete with Gate entry fee, excluding GST etc. all complete as directed by Engineer-in-charge. [(i)No idle charges will be paid. Pumps will be engaged as and when required (ii) Payment will be made on logsheet basis].
Supplying, mixing, transporting, laying in proper level and grade Cement Concrete 1:3:6 (1 Cement : 3Coarse Sand : 6 hard granite graded chips of 20mm & below size Crusher Broken) for shear key wall, hoisting, laying in layers, by use of vibrator, finished smooth to the exposed surface to proper level & gradient, curing etc. with supply of all materials, labour, T&P, royalties, hire & running charges of all machineries, transportation charges, water charges, Port entry fees, all taxes but excluding GST, etc. all complete as directed by the Engineer-in-charge.
Cement Concrete of M-20 grade (using crusher broken hard granite chips of 12mm. to 20mm. size of approved quality for RCC work), mixing in a Batching Plant of required capacity, transporting the cocncrete by any approved means including admixture in recommended proportion as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength & durability with hoisting, laying, compacting by mechanical vibrator, curing etc. with supply of all materials, labour, T&P, all taxes, Port entry fees, royalties, tollage, all transportation charges, all testing, cost of design mix, engagement, hire & running charges of all machinereis etc. all complete excluding GST and as directed by the Engineer-in-charge. [N.B.: (1)The item is excluding cost of form work, cost of binding wire, cost of steel & labour charges for bending & binding of steel (2) The Agency should be conducted trial mix of M20 in the Port approved Govt. Laboratory & same will be approved by Competent Authority, (3) Nos. and different test will be conducted as per Relevant IS code, (4) Caliberation Certificate of Batching Plant to be submitted to receive the M20 concrete & (5) Computer generated slip to be submitted by the Agency in every batch of M20 concrete]
Providing, rigid, smooth, leakproof, centering & shuttering with form works made of ply/ steel shutters for R.C.C works, applying coaltar/ lubricant on the ply/steel surface after each use, dismantling the same after stripping period over including supply of all labour, materials, T&P, royalties, gate entry fees, excluding GST etc. complete as directed by the Engineer-in-charge.
Supply of reinforcement Fe-500 TMT confirming to I.S. Specifications or SAIL/ TISCON/ VIZAG brands including cutting, straightening, bending, binding & placing the grills in position for RCC works including cost of binding wire of 18 to 20 gauge with supply of all materials, labour, transportation, T&P, tollage, Port entry fees, testing charges etc. including all taxes excluding G.S.T all complete as directed by the Engineer in charge. N.B: Payment shall be made as per the co-efficient laid down in IS-1786. No wastages shall be paid.
Dismantling the exisitng damaged/ unused RCC strucutres including stacking the useful material for reuse and disposing the debrises within 5.00Km. lead away from the site with supply of all materials, labour, T&P, all taxes, tollage, royalties, Port entry fees, safety arrangements for workmen, excluding G.S.T etc. all complete as directed by the Engineer in-charge.
Providing necessary shoring & shuttering in the excavated portion and providing necessary props to support the existing excavated pit upto the required extent including all labour, materials, transportation, gate entry fees, staging, scafolding, safety of workmen, all taxes but excluding G.S.T etc. as directed by the Engineer-in-charge.
Refilling with available excavated earth (excluding boulder, rubbish, debris, iron ore, coal and other deleterious materials etc.) in sides of foundation etc., in layers not exceeding 20cm. thickness, compacting the deposited earth in layers by watering and ramming including all labour, tools, equipments, all lead & lift, all taxes but excluding G.S.T etc. complete as directed by the Engineer-in-charge.
Engagment of Excavator for cleaning of over burden stock material & disposing the debrises at identified debris yards inside harbour area with supply of all labour, T&P, POL, transportation, hire & running charges of machineries, operator expenses with tollage, Port entry fees, all taxes but excluding GST etc. complete as per direction Engineer-in-charge. [(i) No idle charges will be paid (ii) Logsheet msut be maintained for this].
M/s. P N Construction
Gyana Ranjan Mohanty
M/S BHAIRAB CHARAN SWAIN
NNS CONSTRUCTIONS AND ENGINEERING PRIVATE LIMITED
M/S Kailash Chandra Samal
M/s.P K Industries
M/s. Jay Jagannath Enterprises
Aakar Infra Engineers PVT Ltd
SURYAA CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_633099.xls
BOQ • 0.28 MB
TD_MCHPDRAIN.pdf
Tender Documents • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .