Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-AOC ATLANTIS A2 1501 PLOT NO 05 SECTOR 11 NEAR CLOUD 36 GHANSOLI NAVI MUMBAI 400 701 E 97 CWE SUBS BHANDUP | THANE | MAHARASHTRA | 400701 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹28.5 L+₹4.7 L (19.8%)Rejected-Finance | L2 | Rejected-Finance Higher amount quoted | |
| 3 | L3₹29.1 L+₹5.4 L (22.6%)Rejected-Finance | L3 | Rejected-Finance Higher amount quoted | |
| 4 | L4₹29.6 L+₹5.9 L (24.8%)Rejected-Finance | L4 | Rejected-Finance Higher amount quoted | |
| 5 | L5₹31.7 L+₹7.9 L (33.3%)Rejected-Finance PLOT NO 14 SHIV COLONY KATI GHATI RAJGARH ROAD ALWER RAJ | ALWAR | ALWAR | RAJASTHAN | L5 | Rejected-Finance Higher amount quoted |
Tender Value
Refer Docs
EMD Value
₹74,160
Closing Date
20 May 2021, 6:00 pmClosed
CWE (A) Jaisalmer
CWE (A) Jaisalmer
OUTSOURCING THE RESOURCES FOR MAINTENANCE AND OPERATION OF PUMP HOUSE IN CERTAIN AREAS OF MIL STN JAISALMER UNDER THE JURISDICTION OF GE (A) JAISALMER
2021_MES_437846_1
83943
Open Tender
Electrical and Maintenance Works
Works
333 days
GE (A) Jaisalmer
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
GE (A) JAISALMER
₹74,160
Yes
9 Jul 2021
22 Apr 2021
22 May 2021
22 Apr 2021
20 May 2021
6 May 2021
Amount
Outsourcing of services for maintenance and operation of ASC Pump House at Jaisalmer Mil Stn on all working days (including Sunday/Holiday) by deploying skilled operator (PHO/FGM) round the clock to operate electrically driven 3 phase, 50 Hz,AC water supply pumping system along with control of all mechanical device such as sluice valve/butter fly valve,foot valve and NRV etc including keeping the installation operational in healthy condition including carrying out all daily maintenance all as directed by Engineer-in-charge & as per Indian electricity rules/ Engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records by providing with adequate staff all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. The installation to be operated in 3 shift (8 Hours per shift) as per under mentioned or as directed by the Engr-in-charge. (a) First Shift - 0600 Hrs to 1400 Hrs. (b) Second Shift - 1400 Hrs to 2200 Hrs. (c) Third Shift - 2200Hr to 0600 Hrs.
The details of ASC Pump House are as under: - (a) Centrifugal pump set of 100 HP complete with motor and pump- 02 Nos. (b) Centrifugal pump set of 60 HP complete with motor and pump - 02 Nos. (c) Centrifugal pump set of 30 HP complete with motor and pump - 02 Nos. (d) Centrifugal pump set of 15 HP complete with motor and pump - 02 Nos. (e) Star Delta starter – 08 Nos. (f) Centrifugal pump sets 180 HP complete with motor and pump - 06 Nos (g) Electric control panel board indoor type with accessories - 08 Nos. (h) DG Set 160 KVA with panel - 01 No. (j) DG Set 40 KVA and centrifugal pump set 60 HP (02 Nos) and starter panel of MAP. (k) DG Set 600 KVA with AMF panel - 01 No. (l) Dosing pump - 03 Nos. (m) APFC panel - 01 No.
Outsourcing of services for maintenance and operation of FMA - I Pump House on all working days (including Sunday/Holiday) by deploying skilled operator (PHO/FGM) to operate electrically driven 3 phase, 50 Hz,AC water supply pumping system along with control of all mechanical device such as sluice valve/butter fly valve,footvalve and NRV etc including keeping the installation operational in healthy condition including carrying out all daily maintenance all as directed by Engineer-in-charge & as per Indian electricity rules/ Engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records by providing with adequate staff all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. The installation to be operated in 2 shift (8 Hours per shift) as mentioned below as directed by the Engr-in-charge. (a) First Shift - 0600 Hrs to 1400 Hrs. (b) Second Shift - 1400 Hrs to 2200 Hrs.
The details of FMA - I Pump House are as under: - (a) Centrifugal pump set of 70 HP complete with motor and pump- 02 Nos. (b) Star Delta starter – 02 Nos. (c) Electric control panel board indoor type with accessories - 01 Nos. (d) DG Set 75 KVA with panel - 01 No.
Outsourcing of services for maintenance and operation of valves in each shift of 8 hours for two shifts of one day for water supply distribution system at Officers and JCO's/ ORs MAP Accn, OJL/ORL shelter (Offr & JCO/ORs) & New GE (A) JSLR Office area including providing suitable conveyance to operator (Semi- Skilled) for operating the valves complete all as directed by Engineer-in-charge.
Outsourcing of services for maintenance and operation of valve in each shift of 8 hours for two shifts of one day of water supply distribution system at ASC pump house, upper & lower KLP, Ascon Nodes, Det Engr Park, Family Mayur Complex, FMA-II pump hosue/ Overhead tank, 5 M Det, ORL Shelter upper KLP including providing suitable conveyance to operator (Semi- Skilled) for operating the valves complete all as directed by Engineer-in-charge.
Outsourcing of services for maintenance and operation of valve in each shift of 8 hours for two shifts of one day of for water supply distribution system at 43 Armd Regt, Thiyat overhead tank, Div HQ, the Guards, Mech O/H tank, EME Bn, FD Hospital, Army School and Armd Regt including providing suitable conveyance to operator (Semi- Skilled) for operating the valves complete all as directed by Engineer-in-charge.
Outsourcing of services for maintenance and operation of valves in each shift of 8 hours for two shifts of one day for water supply distribution system at locations SCDBS, Arty Bde O/H tank, Armd Regt (1 & 2). DOU & Engr Unit, Armd Regt Guards, ASC Bn & Armd Regt including providing suitable conveyance to operator (Semi- Skilled) for operating the valves complete all as directed by Engineer-in-charge.
Outsourcing of services for maintenance and operation of 26 Amn Coy Pump House near Guard post No 29 on all working days (including sunday/holiday) by deploying one Skilled Operator (PHO/FGM ) in general shift ( 0800 Hrs to 1600 Hrs or as directed by EIC) to operate electrically driven 3 phase,50 Hz,AC water supply pumping system alongwith control of all mechanical device such as sluice valve/butter fly valve,foot valve and NRV etc including keeping the installation operational in healthy condition including carrying out all daily maintenance all as directed by Engineer-in-charge & as per Indian electricity rules/ Engineering practices & maintaining properly the protective instruments complete in good condition and all maintenance records, break down records by providing with adequate staff all as specified in particular specifications to the entire satisfaction of Engineer-in-charge. (a) General Shift - 0800 Hrs to 1600 Hrs.
The details of 26 Amn Coy Pump House near Guard Post No 2 are as under: - (a) Centrifugal pump set of 12.5 HP complete with motor and pump- 02 Nos. (b) Star Delta starter – 02 Nos. (c) Electric control panel board outdoor type with accessories - 01 Nos.
Notes for Srl item Nos 1 to 110: (ii) The qualification of skilled person ITI in concerned trade or three years experience in the water supply installatin. (i) Wage paid by the contractor to the persons employed shall not be less than the minimum wages fixed by State/Central Government from time to time whichever is higher. The payment shall be made to the workers through NEFT to adhaar linked bank account of M&O employees/ staff and the bank statement of fair wages as per minimum labour wages as mentioned above shall be submitted along with the RARs/FB for payments. (ii) The contractor shall be responsible for the EPF, ESI, bonus, Safety etc. and insurance of all trademen employed by him as per existing Labour Rules/Acts/Regulations (iii) Contractor special attention is invited that payment of operator / labour shall be made only through Account payee cheque/NEFT and same shall be deposited in Adhar link account of operator / labour. Documentary evidence for the same shall be submitted to Engineer -in-Charge before payment of RAR / Final bill.
(iv) Necessary weekly off will be given to manpower employed for this schedule as per existing rules and regulation of state /central govt. and necessary replacement will be provided by the contractor. Rates quoted for this schedule shall deemed to be included this provision. (v) In case absence of any operator / workmen from any shift will be penalized with a penalty of double the rate quoted by the contractor in addition to the shift not taken in to consideration for payment. Attendant / Operator wanting leave will get it sanctioned before proceeding on leave along with the name of individual who will be performing his duty/shift in his absence. No replacement of operator/workmen without the knowledge of department will be allowed. (vi) Safety equipment's, tools and first aid kit will be provided to all tradesman without any extra cost to government. (vii)Log book (Sheet), Muster roll, attendance register shall be maintained by operator and get it signed by contractor on daily basis. (viii) The contractor shall closed the installation properly with lock and key before leaving the installation. Contractor shall be held responsible for any theft or loss at the installation. Contractor shall make sure to have everything in installation under lock and key. (ix) The contractor shall provide minimum one supervisor to supervise the works of outsourcing staff .The supervisor shall report to the Engineer -in-Charge/ concerned JE E/M daily and maintain an attendance register of all the staff employed. (x) Cleaning of installations from inside and out side up to 15 Meters will be responsibility of the contractor. (xi) Police verification of the persons employed under subject CA will be provided by the contractor.
M/S SHRI HARI CONSTRUCTION COMPANY
JAI ENGINEERING COMPANY
SS SODHA ENTERPRISES
M/s Yash Electrical and Maintenance
M/s godara infratech and power industries
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .