| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.9 LAdmitted-Finance | -25.01% | ₹11.9 L | L1 | Admitted-Finance |
| 2 | L2₹13.0 L+₹1.1 L (9.07%)Admitted-Finance | -18.21% | ₹13.0 L+₹1.1 L (9.07%) | L2 | Admitted-Finance |
| 3 | L3₹13.3 L+₹1.4 L (11.8%)Admitted-Finance 33 MAHAVEER NAGAR NANDRI ROAD PO SARAN NAGAR JODHPUR 342015 | JODHPUR | JODHPUR | RAJASTHAN | 342015 | -16.19% | ₹13.3 L+₹1.4 L (11.8%) | L3 | Admitted-Finance |
| 4 | L4₹13.4 L+₹1.5 L (12.2%)Admitted-Finance H NO 547 MAHADEV CIRCLE INDIRA COLONY JAISALMER RAJASTHAN 345001 | JAISALMER | JAISALMER | RAJASTHAN | 345001 | -15.87% | ₹13.4 L+₹1.5 L (12.2%) | L4 | Admitted-Finance |
| 5 | L5₹14.6 L+₹2.7 L (22.9%)Admitted-Finance | -7.86% | ₹14.6 L+₹2.7 L (22.9%) | L5 | Admitted-Finance |
Tender Value
₹15.9 L
EMD Value
₹31,780
Closing Date
9 May 2026, 6:00 pmClosed
Commissioner,
Nagar Nigam Bikaner.
Tin shade work at sujandesar public park, Bikaner.
2026_DLB_554767_1
E-NIT No. 05/2026-27/Nirman TinShade
Open Tender
Civil Works
Percentage
60 days
Bikaner
as per tender
2 documents required · 2 mandatory
₹1,000
Commissioner, Nagar Nigam Bikaner.
₹31,780
Yes
21 May 2026
29 Apr 2026
11 May 2026
29 Apr 2026
9 May 2026
29 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. | 150 | Cum | 229.5 | ₹34,425 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 13 | Cum | 4,885 | ₹63,505 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 18 | Cum | 5,910 | ₹1,06,380 |
| 4 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. | 115 | Sqm | 236.5 | ₹27,197.5 |
| 5 | Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 75 | cum | 5,400 | ₹4,05,000 |
| 6 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 15 mm cement plaster on the rough side of single or half brick wall of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:6 (1 cement : 6 fine/ coarse sand) | 175 | Sqm | 247 | ₹43,225 |
| 7 | Providing corrugated G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete upto any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275gm/m² | 195 | Sqm | 914 | ₹1,78,230 |
| 8 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: | 3,500 | Kg. | 114.5 | ₹4,00,750 |
| 9 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 280 | Kg. | 144.5 | ₹40,460 |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 200 | Sqm | 114 | ₹22,800 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.13 MB
nit05teenshade.pdf
Tender Documents • 3.12 MB
BOQ_988047.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .