| 1 | 1₹10.2 LAccepted-AOC AURI MOR ANPARA SONEBHADRA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | 1 | Accepted-AOC WORK AWARDS TO L 1 BIDDER ONLY | |
| 2 | 2₹11.0 L+₹23,922 (2.23%)Rejected-AOC | 2 | Rejected-AOC WORK AWARDS TO L 1 BIDDER ONLY | |
| 3 | 3₹11.3 L+₹56,343 (5.25%)Rejected-AOC | 3 | Rejected-AOC WORK AWARDS TO L 1 BIDDER ONLY | |
| 4 | Rejected-Technical | - | Rejected-Technical NOT QUALIFIED AS PER PQC |
Tender Value
₹10.7 L
EMD Value
₹22,000
Closing Date
27 Apr 2021, 4:00 pmClosed
SE OMCI BTPS ANPARA
OFFICE OF THE SE OMCI BTPS ANPARA
Round the clock routine maint various pumps blowers pipe lines mixers AND others equipments of PT Plant DM Plant, WWT Plant, Aux Pump House BTPS Equipment only CPP Dosing system Plant Air Compressor of Unit 4 and 5 pit3 etc of 2x500 MW BTPS Anpara
2021_RVUNL_573494_1
04/OGD/BTPS/2021-22
Open Tender
Miscellaneous Works
Fixed-rate
365 days
BTPS ANPARA
as per PQC
3 documents required · 3 mandatory
₹1,180
DY CAO CFA AND BO BTPS ANPARA
₹22,000
26 May 2021
22 Mar 2021
29 Apr 2021
22 Mar 2021
27 Apr 2021
22 Mar 2021
Amount
PART-A : Round the clock Routine maintenance of various pumps, blowers, , pipe lines, mixers & others equipments of PT Plant, DM Plant, WWT Plant,Aux. Pump House(BTPS Equipment only) , CPP, Dosing system of Unit # 4 & 5, pit-3 etc. of 2x500 MW, BTPS, Anpara & other associated works. The break-up of job given in next column and detailed scope of work at Annexure I-A :
Routine and Preventive mechanical maintenance works round the clock in each shifts
Lubrication works to be carried out daily
Patrolling of line following pipe lines (specified in scope of work)once each day in general shift & additional as & when required & to attend the leakage by replacement of gasket & welding, if any
Cleaning of equipments & their associated lines & systems
PART-B: Round the clock Routine maintenance of two no. Plant Air Compressor of WTP of 2x500 MW, BTPS, Anpara.
Routine and Preventive mechanical maintenance works round the clock in each shifts
Lubrication works to be carried out daily
Cleaning of equipments & their associated lines & systems
PART-C:Cutting of bush / jungle along with D. M. Transfer, Service water, Waste water, Acid / Alkali Transfer pipe lines. (As and when required)
Cutting of bush / jungle along with D. M. Transfer, Service water, Waste water, Acid / Alkali Transfer pipe lines. (As and when required)
Excavation of medium soil / ash below & over along the D.M. Transfer , Service water, Waste water, Acid / Alkali Transfer pipe lines etc., accumulated due leakage from ash pipe lines / rain water to protect the lines from corrosion & for the maintenance of lines.
Transportation of soil / ash from work site to disposal site ( low level land area in the plant)including loading unloading). Lead 2 km. (Same quantity as excavated)
PART-D
Complete overhauling of Plant air compressor including Epoxy painting on it exterior parts as per detailed scope of work at Annexure I-A :
Breakdown maintenance/ repairing/Cleaning/ replacement of following component of Plant Air Compressor of WTP of 2x500 MW, BTPS, Anpara.
Inters Coolers/After coolers
Air Receiver
Drier Filters & its Resin.
Suction/ Discharge valve of LP/HP Cylinders.
Compressor Piston/ Cylinder Piston/ Packing etc.
M/S NISHA ENTERPRISES
M/s BARELI ENGG CO.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .