| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-Finance 106 GREEN AVANUE NAGAR AJMER ROAD GAJSINGHPURA JAIPUR RAJASTHAN 302021 | JAIPUR | RAJASTHAN | 302021 | L1 | Accepted-Finance OK | |
| 2 | L2₹17.3 L+₹79,976.42 (4.86%)Rejected-Finance ADD B 129 NEAR PATEL PARK HARMU HOUSING COLONY DORANDA RANCHI 834002 | RANCHI | JHARKHAND | 834002 | L2 | Rejected-Finance OK | |
| 3 | L3₹17.6 L+₹1.1 L (6.79%)Rejected-Finance 53A NEW BASTI KADRU DORANDA ARGORA RANCHI | RANCHI | JHARKHAND | 829205 | L3 | Rejected-Finance OK | |
| 4 | L4₹17.6 L+₹1.1 L (6.93%)Rejected-Finance | L4 | Rejected-Finance OK | |
| 5 | L5₹18.1 L+₹1.7 L (10.2%)Rejected-Finance AT PO GIDDI C RAMGARH HAZARIBAG 829109 | RAMGARH | JHARKHAND | 829109 | L5 | Rejected-Finance OK |
Tender Value
₹22.7 L
EMD Value
₹45,441
Closing Date
1 Jul 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, RMC
RMC
Construction of RCC Drain at Harmu housing colony near St. Kuldeep School to Bye Pass road main Nala via Boundary and near St. Kuldeep School to Dr. Jitendra house under ward No-26
2024_UDD_87198_7
170/ENG
Open Tender
Civil Works
Works
120 days
As per NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹45,441
24 Jan 2025
26 Jun 2024
2 Jul 2024
26 Jun 2024
1 Jul 2024
26 Jun 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Labour for cleaning the work site before and after work etc. | |||||
| 1.01 | Dismantling pucca brick masonary or lime work including stacking serviceable material in countable stacks within 15M lead and disposal of unserviceable materials with all leads complete as per direction of E/I | 19.12 | m3 | 541.67 | ₹10,356.73 |
| 2 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15m lead and disposal of unserviceable materials with all lead, all complete as per direction of E/I.
COL. - | 5.68 | CUM | 1,993.04 | ₹11,320.47 |
| 3 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. Extra for earthwork in hard soil as per specification & direction of E/I.(vide classification of soil item-B) | 193.76 | m3 | 167.33 | ₹32,421.86 |
| 4 | Providing,supplying & spreding of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials, labour,royality and taxes all complete as per specification and direction of E/I ( Mode of measurment compacted volume.) | 18.01 | m3 | 347.85 | ₹6,264.78 |
| 5 | Supplying and laying (properly as per design and drawing ) rip-rap with good quality of boulders duty packed including the cost of materials royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I. | 30.02 | M3 | 1,756.4 | ₹52,727.13 |
| 6 | Providing RCC-M200 with nominal mix of (1:1.5:3) in foundation and plinth with approved quality of stone --do--all complete as per drawing and Technical specification. | 76.01 | M3 | 6,082.45 | ₹4,62,327.02 |
| 7 | Providing precast R.C.C. M-200 with nominal mix of (1:1.5:3) in slab of desired size with approved quality of stone chips and clean coarse sand of F.M. 2.5 to 3 including cost of curing ,shuttering ,carrying the slab manually to site and laying in position all complete (but excluding the cost of reinforcement )taxes and royalty all complete as per building specifications and direction of E/I. | 36.84 | M3 | 6,308.87 | ₹2,32,418.77 |
| 8 | Providing Tor steel reinforcement of 8 mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. | 3.49 | MT | 83,314.02 | ₹2,90,765.93 |
| 9 | Providing Tor steel reinforcement of 8mm,10mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site ,cutting bending and binding with annealed wire with cost of wire ,removal of rust ,placing the rods in position all complete as per building specification and direction of E/I. | 6.48 | MT | 82,096.54 | ₹5,31,985.58 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 1.08 MB
Tendernotice_2.pdf
Tender Document • 0.50 MB
BOQ_117500.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .