| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2,749Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4,154+₹1,405 (51.1%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹4,306+₹1,557 (56.6%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹26,640+₹23,891 (869.1%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S CLEAR LINE ENGINEERS CONTRACTOR L4 | M/s GCS Associates L3 | M/s Wazir Agencies L2 | M/S SURYA ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|
| 1.0025 KVA Distribution Transformer (Aluminium Wound) | |||||||
| 1.01 | Unloading of transformer from vehicle, | 1 | No. | 200 ₹200 | 22 ₹22 | 20 ₹20 | 10 ₹10 Lowest |
| 1.02 | Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations. | 1 | Job | 300 ₹300 | 40 ₹40 | 40 ₹40 | 20 ₹20 Lowest |
| 1.03 | Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages. | 1 | Job | 300 ₹300 | 19 ₹19 Lowest | 20 ₹20 | 20 ₹20 |
| 1.04 | Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including | 1 | Job | 200 ₹200 | 8 ₹8 | 10 ₹10 | 5 ₹5 Lowest |
| 1.05 | Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc. | 1 | Job | 100 ₹100 | 19 ₹19 | 30 ₹30 | 10 ₹10 Lowest |
| 1.06 | Painting of Transformer Tank (inner and outer side) , radiators including supply. | 1 | Job | 200 ₹200 | 8 ₹8 | 10 ₹10 | 5 ₹5 Lowest |
| 1.07 | Impregnation and Heat tretment of Transformer/coils | 1 | Job | 200 ₹200 | 24 ₹24 | 25 ₹25 | 10 ₹10 Lowest |
| 1.08 | Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry. | 1 | Job | 300 ₹300 | 23 ₹23 | 25 ₹25 | 10 ₹10 Lowest |
| 1.09 | Fitting of LT Bushing | 1 | No. | 40 ₹40 | 23 ₹23 | 35 ₹35 | 10 ₹10 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
1 Aug 2025, 2:00 pmClosed
Executive Engineer, ED-III, (JPDCL)Jammu.
Office of Executive Engineer, ED-III, Jammu.
Fixing of Rate Contract (Labour Charges) for Reclamation/Repairs of Damaged Distribution Transformers of Various Ratings Aluminum/Copper wound falling under the jurisdiction of Electric Division-III Jammu for the Financial Year 2025-26
2025_PDD_281067_1
ED-III/Jammu/22 of 2025-26
Open Tender
Electrical Works
Item Rate
2 days
Plant sub Division janipur
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
Executive Engineer, ED-III,Jammu.
₹1 L
19 Aug 2025
11 Jul 2025
2 Aug 2025
11 Jul 2025
1 Aug 2025
11 Jul 2025
Amount
25 KVA Distribution Transformer (Aluminium Wound)
Unloading of transformer from vehicle,
Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Painting of Transformer Tank (inner and outer side) , radiators including supply.
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Fitting of LT Bushing
Fitting of LT Bush Rod
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Loading of repaired Transformer to Vehicle including dragging from stacking site in Divl. Workshop.
Testing of transformer after repairs
63 KVA Distribution Transformer (Aluminium Wound)
Unloading of transformer from vehicle,
Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Painting of Transformer Tank (inner and outer side) , radiators including supply.
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Fitting of LT Bushing
Fitting of LT Bush Rod
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Loading of repaired Transformer to Vehicle including dragging from stacking site in Divl. Workshop.
Testing of transformer after repairs
100 KVA Distribution Transformer (Aluminium Wound)
Unloading of transformer from vehicle,
Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Painting of Transformer Tank (inner and outer side) , radiators including supply.
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Fitting of LT Bushing
Fitting of LT Bush Rod
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Loading of repaired Transformer to Vehicle including dragging from stacking site in Divl. Workshop.
Testing of transformer after repairs
200/250 KVA Distribution Transformer (Aluminium Wound/ Copper Wound)
Unloading of transformer from vehicle,
Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Painting of Transformer Tank (inner and outer side) , radiators including supply.
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Fitting of LT Bushing
Fitting of LT Bush Rod
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Loading of repaired Transformer to Vehicle including dragging from stacking site in Divl. Workshop.
Testing of transformer after repairs
400/500 KVA Distribution Transformer (Copper Wound)
Unloading of transformer from vehicle,
Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Painting of Transformer Tank (inner and outer side) , radiators including supply.
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Fitting of LT Bushing
Fitting of LT Bush Rod
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Loading of repaired Transformer to Vehicle including dragging from stacking site in Divl. Workshop.
Testing of transformer after repairs
630 KVA Distribution Transformer (Copper Wound)
Unloading of transformer from vehicle,
Dragging of tranaformer from stacking site/Unloading site to worksite,Opening of Transformers, Draining of oil, Opening of HV/LV Connections, Taking out core, Opening of Side Channel Laminations.
Labour Charges for Taking out of all coils after opening of connections and inspection of coils to ascertain damages.
Labour charges for repairing ,welding of Transformer Tank , radiators , Arresting of oil leakages etc if any including
Labour charges for cleaning and washing of Transformer Tank , radiators top cover etc.
Painting of Transformer Tank (inner and outer side) , radiators including supply.
Impregnation and Heat tretment of Transformer/coils
Refixing of coils and reffitting of Transformer including providing of cork sheet,packing gutties and other sundry.
Fitting of LT Bushing
Fitting of LT Bush Rod
Heat Treatment of Transformer by short Circuit
Labour charges for dragging from work site to heat treatment site, heat treatment site to filling site , filling site to testing site , testing site to loading or stacking site during work.
Loading of repaired Transformer to Vehicle including dragging from stacking site in Divl. Workshop.
Testing of transformer after repairs
Common items for all Capacities of Transformers
Dismentling and reerection of HT jumper sets in case of repairs at site ( for all capacities)
Reconditioning of LV Coil…..(Aluminium)
Reconditioning of LV Coil…..(Cppper)
Winding of HV Leg coil…. (Aluminium)
Winding of HV Leg coil…. (Copper)
Winding of LV Leg coil…. (Aluminium)
Winding of LV Leg coil…. (Copper)
Fitting of HT Bushing (for all capacities)
Fitting of HT Bush Rod (for all capacities)
Filtration/Dehydration of Old/Used Transformer oil including filling in Transformer tank.(for all capacities)
Filling of New/ Fresh Transformer oil in Transformer Tank.(for all capacities)
Sorting/stacking/weighing of Aluminium Scrap of all ratings transformers and damaged Bush rods etc
M/s Wazir Agencies (BID ID -2429985)
M/s GCS Associates (BID ID -2421309)
M/S CLEAR LINE ENGINEERS CONTRACTOR (BID ID -2429170)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .