Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹4.3 L+₹10,193.25 (2.41%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹4.5 L+₹25,939.40 (6.13%)Admitted-Finance 10 8 111 GHOLA ROAD PO KAZIPARA SURYASEN PALLY BARASAT NORTH 24 PGS WEST BENGAL KOLKATA 124 | 124 | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MUDI ENTERPRISE L2 | TRIMURTI ENTERPRISE L3 | FABIAN ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 32 | M2 | 362 ₹11,584 | 358 ₹11,456 | 338 ₹10,816 Lowest |
| 2.00 | Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor. [Pakur Variety] 1:3:6 proportion | 8 | M3 | 5,038 ₹40,304 | 5,372 ₹42,976 | 5,024 ₹40,192 Lowest |
| 3.00 | Brick work with 1st class bricks in cement mortar (1:6). | - | - | - | - | - |
| 3.01 | i) In foundation and plinth. | 6 | M3 | 5,067 ₹30,402 | 5,410 ₹32,460 | 5,055 ₹30,330 Lowest |
| 3.02 | ii) In super structure ground floor. | 4 | M3 | 5,265 ₹21,060 | 5,630 ₹22,520 | 5,253 ₹21,012 Lowest |
| 4.00 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 35 | M2 | 718 ₹25,130 | 734 ₹25,690 | 692 ₹24,220 Lowest |
| 5.00 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 8 | M3 | 920 ₹7,360 | 936 ₹7,488 | 895 ₹7,160 Lowest |
| 6.00 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary 9Ground floor). [excluding cost of chipping over concrete surface] cement Morter, 15 mm. thick plaster. (1:6) | 65 | M2 | 164 ₹10,660 | 150 ₹9,750 | 142 ₹9,230 Lowest |
| 7.00 | Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. Note : Cement 0.152 cu.m. per 100 sq.m. | 15 | M2 | 56 ₹840 | 33 ₹495 Lowest | 34 ₹510 |
| 8.00 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor: One Coat. | 80 | M2 | 41 ₹3,280 | 31 ₹2,480 Lowest | 31 ₹2,480 Lowest |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
7 Sept 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Jt. MANAGING DIRECTOR
12 R N MUKHERJEE ROAD,KOLKATA-700001
Renovation of general Toilet block at Barasat Depot under WBTC -CTC
2026_CTC_1038271_1
WBTC/JMD/NIT- 590/2026-27
Open Tender
CIVIL WORKS
Item Rate
120 days
KOLKATA
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,000
₹9,000
18 Nov 2026
17 Aug 2026
9 Sept 2026
17 Aug 2026
7 Sept 2026
17 Aug 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 32 | M2 | - | - |
| 2 | Cement concrete with graded stone ballast (40 mm size excluding shuttering) In ground floor. [Pakur Variety] 1:3:6 proportion | 8 | M3 | - | - |
| 3Brick work with 1st class bricks in cement mortar (1:6). | |||||
| 3.01 | i) In foundation and plinth. | 6 | M3 | - | - |
| 3.02 | ii) In super structure ground floor. | 4 | M3 | - | - |
| 4 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. | 35 | M2 | - | - |
| 5 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 8 | M3 | - | - |
| 6 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary 9Ground floor). [excluding cost of chipping over concrete surface] cement Morter, 15 mm. thick plaster. (1:6) | 65 | M2 | - | - |
| 7 | Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. Note : Cement 0.152 cu.m. per 100 sq.m. | 15 | M2 | - | - |
| 8 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor: One Coat. | 80 | M2 | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_2550544.xls
BOQ • 0.30 MB
SIB.pdf
Additional Documents • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .