Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.3 L+₹92,551 (6.44%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹15.5 L+₹1.1 L (7.87%)Rejected-Finance 0 WARD NO 9 PIPERTAR KATHAN KHAMARIA POLICE CHOWKI SANT RAVIDAS NAGAR UTTAR PRADESH 221306 | BHADOHI | UTTAR PRADESH | 221306 | L3 | Rejected-Finance L3 | |
| 4 | L4₹15.6 L+₹1.2 L (8.68%)Rejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | L4 | Rejected-Finance L4 | |
| 5 | L5₹15.6 L+₹1.3 L (8.74%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S Harish Kumar Contractor L1 | SHRI BALAJI CONSTRUCTION L3 | M/S PRADEEP ASSOCIATES L10 | M/S A V R BUILDERS L9 | S F INFRA PROJECTS L4 | M/S NIHARIKA ENTERPRISES L11 | M/S SHREE JEE CONSTRUCTIONS L8 | Om Builders L12 | PUSHPA DEVI L7 | M/S GUNGUN ENTERPRISES L6 | SIYA INFRATECH L5 | M/s AMAN MACHINERY STORE L2 | M/s VINAY KUMAR CONTRACTOR L13 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | UPROOTTING JHUNDS AND MOONJ DISPOSAL AWAY FROM SITE | 3,080 | SQM | 23.62 ₹72,749.6 | 24.63 ₹75,860.4 | 20 ₹61,600 | 3.5 ₹10,780 Lowest | 5 ₹15,400 | 5 ₹15,400 | 15 ₹46,200 | 31 ₹95,480 | 26.25 ₹80,850 | 15 ₹46,200 | 5 ₹15,400 | 10 ₹30,800 | 30 ₹92,400 |
| 2.00 | CLEANING THIKS BUSHES AND THORNY JUNGLE WITHOUT UPROOTING | 6,160 | SQM | 3.26 ₹20,081.6 | 3.09 ₹19,034.4 | 3 ₹18,480 | 3.5 ₹21,560 | 1 ₹6,160 Lowest | 2 ₹12,320 | 2 ₹12,320 | 4.4 ₹27,104 | 3.3 ₹20,328 | 2 ₹12,320 | 2 ₹12,320 | 2.75 ₹16,940 | 4 ₹24,640 |
| 3.00 | EARTH WORK IN FOUNDATION IN DRY SOIL INCLUDING LEFT UP TO 1.50 AND LEAD UP TO 30M INCLUDING BACK FILLING WATERING AND RAMING OF EXCVATED EARTH IN TO THE STRUCTURE AND THE SIDES OF FOUNDATION TRENCHES OR INTO THE PLINGTH WITH REMOVAL AND DISPOSAL OF SURPLUS EARTH AS DIRECTED BY ENGINEER IN CHARGE UP TO 30 METER LEAD FROM THE FOUNDATION | 32.07 | CUM | 65.24 ₹2,092.25 | 70.39 ₹2,257.41 | 80 ₹2,565.6 | 50 ₹1,603.5 | 40 ₹1,282.8 Lowest | 40 ₹1,282.8 Lowest | 50 ₹1,603.5 | 88 ₹2,822.16 | 75 ₹2,405.25 | 40 ₹1,282.8 Lowest | 100 ₹3,207 | 69 ₹2,212.83 | 100 ₹3,207 |
| 4.00 | RCC PRECAST BOUNDARY COMPOUND WALL SUB PRESTRESSED PRECAST BOUNDARY WALL INDTALLATION M 25 GRADE CONCRETE COMPOND WALL PILLAR SIZE 150MM X 150MM WITH 7 NOS 3MM HTC WIRE AND M 25 GRADE CONCRETE PANEL SIZE 300mm X 45mm X 2100 mm WITH 4 Nos 3mm HTC WIRE AND 2 SIDE SAME FINISHING M 25 GRADE CONCRETE INCLUDING ALL MATERIALS LABOUR TRANSPORTATION ETC | 1,470 | SQM | 753.52 ₹11,07,674.4 Lowest | 809.48 ₹11,89,935.6 | 1,000 ₹14,70,000 | 900 ₹13,23,000 | 850 ₹12,49,500 | 1,100 ₹16,17,000 | 900 ₹13,23,000 | 1,010 ₹14,84,700 | 862.5 ₹12,67,875 | 850 ₹12,49,500 | 830 ₹12,20,100 | 863 ₹12,68,610 | 1,100 ₹16,17,000 |
| 5.00 | FINISHING WALLS TWO COATS WITH WATER PROOTING CEMENT PAINT OF APPROVED MAKE SUCH AS SUPER SNOWCEM DUROCEM ROBIANCE GUTTUCEM SUPERCEM QUALITY AND OF REQUIRED SHADE ON UNDERCORATED WALL SURFACE OVER AND INCLUDING ONE COAT WHITE CEMENT PRIMER TO GIVE AND EVEN SHADE AFTER THROUGHTLY BRUSHING THE SURFACE INCLUDING COST OF ALL AMTERIAL LABOUR AND T AND P ETC COMPLETION OF THE WORK | 2,940 | SQM | 46.97 ₹1,38,091.8 | 50.68 ₹1,48,999.2 | 55 ₹1,61,700 | 100 ₹2,94,000 | 60 ₹1,76,400 | 40 ₹1,17,600 | 50 ₹1,47,000 | 60 ₹1,76,400 | 54 ₹1,58,760 | 60 ₹1,76,400 | 57 ₹1,67,580 | 38 ₹1,11,720 Lowest | 40 ₹1,17,600 |
| 6.00 | SUPPLY AND FIXING MAIN GATE OF 4.00 X 2.00 AND SLIDE STEEL GATE OF 1.50 X 2.00 ON RECTANGULAR HOLLOW SECTION PIPE WITH ONE COAT OF RED OXIDE PRIMER AND PAINTING WITH SYNTHETIC ENAMEL PAINT OF APPROVED BRAND AND MANUFACTURE TO GIVE AN EVEN SHADE INCLUDING COST OF ALL MSTERIAL LABOUR AND T AND P ETC | 1 | NO | 61,630.6 ₹61,630.6 | 66,496 ₹66,496 | 80,000 ₹80,000 | 7,500 ₹7,500 Lowest | 60,000 ₹60,000 | 90,000 ₹90,000 | 90,000 ₹90,000 | 83,000 ₹83,000 | 70,850.25 ₹70,850.25 | 50,000 ₹50,000 | 90,000 ₹90,000 | 52,000 ₹52,000 | 90,000 ₹90,000 |
| 7.00 | PROVIDING AND LAYING R C C 1 1.5 3 INLUDING LAYING PLACIING WITH ALL LABOUR T AND P ETC COMPLETE | 2.47 | CUM | 4,953.6 ₹12,235.39 | 5,344.1 ₹13,199.93 | 6,000 ₹14,820 | 4,400 ₹10,868 Lowest | 7,000 ₹17,290 | 6,500 ₹16,055 | 4,500 ₹11,115 | 6,700 ₹16,549 | 5,694.66 ₹14,065.81 | 6,500 ₹16,055 | 5,000 ₹12,350 | 5,300 ₹13,091 | 5,800 ₹14,326 |
| 8.00 | CENTERING AND SHUTTERING FOR R C C WORK | 22.11 | SQM | 100.97 ₹2,232.45 Lowest | 566.7 ₹12,529.74 | 500 ₹11,055 | 620 ₹13,708.2 | 500 ₹11,055 | 500 ₹11,055 | 500 ₹11,055 | 710 ₹15,698.1 | 603.75 ₹13,348.91 | 350 ₹7,738.5 | 500 ₹11,055 | 563 ₹12,447.93 | 400 ₹8,844 |
| 9.00 | PROVIDING AND FIXING STEEL REINFORCEMENT FOR R C C WORK INCLUDING ALL COST OF MATERIAL BINDING BENDING AND PLACING IN POSITION AND T AND P AND LABOUR ETC | 0.39 | MT | 53,332.4 ₹20,799.64 Lowest | 57,542.42 ₹22,441.54 | 65,000 ₹25,350 | 65,000 ₹25,350 | 65,000 ₹25,350 | 75,000 ₹29,250 | 80,000 ₹31,200 | 71,000 ₹27,690 | 61,311 ₹23,911.29 | 75,000 ₹29,250 | 80,000 ₹31,200 | 57,223 ₹22,316.97 | 80,000 ₹31,200 |
Tender Value
₹22.0 L
EMD Value
₹44,060
Closing Date
10 Sept 2025, 2:00 pmClosed
EE ADGC ALIGARH
EE ADGC ALIHGARH
CONSTRUCTION OF BOUNDRY WALL THE SECURITY OF JIRAULI HIRA SINGH INPECTION HOUSE SITUATED ON MACHUA DY
2025_UPIDC_1070366_1
3542 dt 23.08.2025
Open Tender
Civil Works
Item Rate
90 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹44,060
19 Nov 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .