Executive Engineer, ED-3rd srinagar
Office of Executive Engineer, ED-3rd srinagar
Creation of 200 KVA Sub-Station at New Colony, Palpora, Srinagar Pertaining to ESD Nawakadal, ED-3rd (Turnkey Basis)
2021_PDD_151992_1
ED-III/65 of 2021-22, Dated - 07/12/2021
Open Tender
Electrical Works
Turn-key
15 days
Office of Executive Engineer, ED-3rd srinagar
Refer SBD, Technical Specification, Drawings
6 documents required · 6 mandatory
₹1,000
Executive Engineer, ED-3rd srinagar
Exempted
3 Jan 2022
7 Dec 2021
31 Dec 2021
7 Dec 2021
30 Dec 2021
9 Dec 2021
8 Dec 2021 - 30 Dec 2021
Amount
Supply Installation, Testing & Commissioning of (SITC)
Supply, Installation, Testing & Commissioning (including integration with system) of 200 KVA,11/0.433,3 phase Distribution Transformers with Bimetallic Terminal Connectors Energy efficient Level-2, (Al. wound) ONAN, Filled with T.Oil as per IS 1180 Part-I of 2014 (including SL Clamps, Jumpers).
Supply, Installation, Testing & Commissioning of S.T. poles 9.0 Meter long swaged Type conforming to ST 410 SP-33, IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 33). Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
Supply, Installation, Testing & Commissioning of S.T. poles 8.0 Meter long swaged Type conforming to ST 410 SP-15 , IS: 2713 amended up-to date well finished and coated with black bituminous paint upto plant depth and Red-Oxide coated above ground level with earthing arrangement through bolt welded on pole of 14mm diameter, provided at height of 300mm above the planting depth which should be 1.5ms (SP 15).Top plate 3mm thick fully welded & bottom plate 35cm*35cm, 5mm thick fully welded.
Supply, Installation, Testing & Commissioning of ACSR 100 Sqmm conforming with the Indian Standard specification IS: 398 (PLI)-1976 and IS : 398 (PL II)- 1976 or the latest version thereof.
Supply, Installation, Testing & Commissioning of ACSR 50 Sqmm conforming with the Indian Standard specification IS: 398 (PLI)-1976 and IS : 398 (PL II)- 1976 or the latest version thereof.
Supply, Installation, Testing & Commissioning of Gapless Surge Arrestor 9KV, 10 KA, Lighting Arrestor Set Heavy duty, Station type conforming to IEC-99-4 Capable of withstanding Maximum continuous operating voltages (M.C.O.V)
Supply, Installation, Testing & Commissioning of 11KV 200 Amperes, Triple pole switches Gang Operated (G.O. Set) conforming: IS-2544, IS: 5340 (Part-III) and SS: 9921 (Part-I -V)
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A as per Relevant IS.
Supply, Installation, Testing & Commissioning of Channel Iron/Angle Iron / Flat of different Sizes including Clamps/collars Galvanized as per IS.
Supply, Installation, Testing & Commissioning of 11KV Disc Insulators (Polymer Type) 45KN Complete with fittings.
Supply, Installation, Testing & Commissioning of Nuts and Bolts full thread of sizes Galvanized as per IS
Supply, Installation, Testing & Commissioning of Earthing of Substation-Excavation of earth pit of dia 650mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as per IS 1239. GI strip for neutral earthing of size 75mm*10mm & 50mm*6mm for connection of transformer body, G.O Set & lightening Arrestor (Including Baby Insulators, if required) as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials & earth chamber made of brick masonry with RCC slab cover.
Pole Earthing by GI pipe 40mm or GI rod 20mm, 2.5 m long through GI strip of standard size
Supply, Installation, Testing & Commissioning of 11 KV Pin Insulator (polymer) with pins (5KN)
Supply, Installation, Testing & Commissioning of LT Distribution Box for 200 KVA DTR with MCCB for incomer & SFU's for outgoing Circuits.
Supply and Painting of ST poles with i) one coat of Red Oxide paint ii) two coats of Alum paint , well finished
Supply, Installation, Testing & Commissioning of 185 sq mm (2 CKT - included in total length) Cable (making two Circuits),1.1KV Grade,PVC Insulated stranded conductor FRLS type including Aluminum Lugs
Supply, Installation, Testing & Commissioning of Danger Plate With Clamps for Substation as per Standards.
Providing of Material and laying of Cement bottoming of poles (1:2:4 Mix as per REC Standards 0.5M3 per Pole)
Providing of Material and laying of Cement bottoming of poles (1:2:4 Mix as per REC Standards 0.45M3 per Pole)
Supply and fixing of Wedge Connectors/PG Clamps
Supply, Installation, Testing & Commissioning of Anti Climbing devices with Clamps for Substation, HT Poles.
Supply & Fixing of GI U-Clamps along with 16 KN Polymer Shackle Insulators.
Ali Mohammad Baba and Sons
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .