| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.4 CrAdmitted-Finance | -40.11% | ₹5.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.9 Cr+₹49.8 L (9.28%)Admitted-Finance | -34.55% | ₹5.9 Cr+₹49.8 L (9.28%) | L2 | Admitted-Finance |
| 3 | L3₹5.9 Cr+₹54.8 L (10.2%)Admitted-Finance | -33.99% | ₹5.9 Cr+₹54.8 L (10.2%) | L3 | Admitted-Finance |
| 4 | L4₹5.9 Cr+₹55.0 L (10.3%)Admitted-Finance | -33.97% | ₹5.9 Cr+₹55.0 L (10.3%) | L4 | Admitted-Finance |
| 5 | L5₹5.9 Cr+₹56.8 L (10.6%)Admitted-Finance RAILWAY COLONY NOWGAM SRINAGAR JAMMU AND KASHMIR 190015 | BUDGAM | JAMMU AND KASHMIR | 190015 | -33.77% | ₹5.9 Cr+₹56.8 L (10.6%) | L5 | Admitted-Finance |
Tender Value
₹9.0 Cr
EMD Value
₹17.9 L
Closing Date
3 Apr 2026, 4:00 pmClosed
AS PER THE NIT
AS PER THE NIT/SBD
Improvement/ Upgradation of road from Zero Bridge to I.G. Road (Balance Portion) Part C.
2026_PWDJK_305455_1
NIT NO 115/RNB/RAJ OF 2025-26 DATED 06.03.2026.
Open Tender
Civil Works
Percentage
730 days
SSRINAGAR
AS PER THE NIT/SBD
8 documents required · 8 mandatory
₹8,500
AS PER THE NIT/SBD
₹17.9 L
AS PER THE NIT/SBD
22 Jul 2026
6 Mar 2026
4 Apr 2026
7 Mar 2026
3 Apr 2026
7 Mar 2026
12 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix) | 63.9 | Cum | 1,725.2 | ₹1,10,240.28 |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge | 97.45 | Cum | 1,458.45 | ₹1,42,125.95 |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 3,662.85 | Cum | 256.85 | ₹9,40,803.02 |
| 4 | P/L stone soling (Hand packed) in trenches incl. ramming, dressing watering etc. incl. all leads, lifts and carriage upto site of work complete. | 273.59 | Cum | 950 | ₹2,59,910.5 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 260.28 | Cum | 5,202.9 | ₹13,54,210.81 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering. shuttering, finishing and reinforcement-All work upto plinth level. 1.1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). The job also includes dewatering in all instances as and when required at site. | 937.26 | Cum | 7,788.4 | ₹72,99,755.78 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) All works at all levels. | 1,476.02 | Cum | 9,395.7 | ₹1,38,68,241.11 |
| 8Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. | |||||
| 8.01 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 115.7 | Cum | 8,422.45 | ₹9,74,477.47 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,58,788.6 | Kg | 123.2 | ₹4,42,02,755.52 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.84 MB
Tendernotice_2.pdf
PDF • 1.31 MB
BOQ_992160.xls
BOQ • 0.25 MB
XTENSION.pdf
PDF • 0.66 MB
CRFCorigen.pdf
PDF • 0.99 MB
zerobridge.pdf
PDF • 0.66 MB
zerobridge.pdf
PDF • 0.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .