| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.7 LAccepted-AOC | ₹95.7 L Quoted ₹98.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.0 CrRejected-AOC | ₹1.0 Cr | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | N R M RAGHAVAN CONSTRUCTION L1 | S NAGARAJAN L2 |
|---|---|---|---|---|---|
| 1.01Item Description | |||||
| 1.02 | Picking the existing BT surface and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and incidental charges etc., complete as per standard specifications as per MORT&H Rev. V specifications No. 111, 112, 202 | 136.03 | sqm | 22.49 ₹3,059.31 | 22.93 ₹3,119.17 |
| 1.03 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 61.22 | Cum | 2,508.16 ₹1.5 L | 2,556.86 ₹1.6 L |
| 1.04 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 | 408.1 | sqm | 85.95 ₹35,076.20 | 87.62 ₹35,757.72 |
| 1.05 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 408.1 | sqm | 20.11 ₹8,206.89 | 20.5 ₹8,366.05 |
| 1.06 | Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 13,371.9 | sqm | 28.44 ₹3.8 L | 29 ₹3.9 L |
| 1.07 | Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver finisher hydrostatic (more than 5m width) to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 | 51.4 | Cum | 10,276.96 ₹5.3 L | 10,476.52 ₹5.4 L |
| 1.08 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of 19.00 9.50mm,0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mmwithmechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher hydrostatic (morethan5mwidth), Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.. complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 551.2 | Cum | 13,145.25 ₹72.5 L | 13,400.49 ₹73.9 L |
| 6.00Sub Total | |||||
| 7.00 | GST | 1 | INR | 15,03,735.54 ₹15.0 L | 15,32,952.4 ₹15.3 L |
Tender Value
Refer Docs
EMD Value
₹58,000
Closing Date
27 May 2025, 12:00 pmClosed
JC/EO Arulmigu subramaniya swamy temple,Tiruttani.
JC/EO Arulmigu subramaniya swamy temple,Tiruttani,631209
Improvements to Riding Quality at Km 0/0-1/357 of Existing Ghat Road of Arulmigu Subramaniyaswamy Thirukkoil, Tiruttani.
2025_HRCE_557198_1
RC.NO.282/2025/E3
Open Tender
Civil Works - Roads
180 days
ARULMIGU SUBRAMANYA SWAMY TEMPLE, TIRUTTANI
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹58,000
12 May 2026
12 May 2025
27 May 2025
12 May 2025
27 May 2025
16 May 2025
Amount
Item Description
Picking the existing BT surface and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for picking and all other tools and plants employed of the work and incidental charges etc., complete as per standard specifications as per MORT&H Rev. V specifications No. 111, 112, 202
Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5
Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5
Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5
Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG40 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver finisher hydrostatic (more than 5m width) to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13cum of 19.00 9.50mm,0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mmwithmechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher hydrostatic (morethan5mwidth), Vibratory/Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.. complete as per specification using CMP as per clause 507 of MORTH Rev-5
Sub Total
S NAGARAJAN (BID ID -1351659)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_665526.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Ghat_Rord.pdf
Tender Documents • 0.79 MB
BOQ_665526.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid