| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 LAccepted-Finance | ₹12.8 L | L1 | Accepted-Finance OK |
| 2 | L2₹14.5 L+₹1.8 L (13.8%)Accepted-Finance | ₹14.5 L+₹1.8 L (13.8%) | L2 | Accepted-Finance OK |
| 3 | L3₹17.4 L+₹4.6 L (36.3%)Accepted-Finance 01 PADUMPUKHRI NEAR BUS STAND NEAR BUS STAND SONITPUR ASSAM 784001 | SONITPUR | ASSAM | 784001 | ₹17.4 L+₹4.6 L (36.3%) | L3 | Accepted-Finance OK |
| Sl No | Description | Qty | Unit | M/S SAI TRADERS L3 | Himalaya Contractor & Suppliers L2 | BK ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Replacing broken/damaged LT/HT PCC/STP poles (9/11/13 m) & erecting new PCC pole (9/11/13 m) in mid-span to raise low-hanging conductors / AB cable to safe ground clearance – loading from store (up to 100 KM distance from site), carriage to site, return back the scrap to store again, pit digging (depth & grouting as per standard line-construction practice), erection, fixing clamp/cross-arm/insulator, sagging of conductors to safe ground clearance & restoring supply. All grouting material by contractor. | 48 | Job | 2,000 ₹96,000 | 1,800 ₹86,400 Lowest | 2,200 ₹1,05,600 |
| 2.00 | Repair of rust-damaged ST poles (9/11/13 m) near ground by welding additional channel/angle/iron strip of approved section to restore strength. Channel/angle/strip by contractor. | 25 | Job | 1,700 ₹42,500 | 1,500 ₹37,500 Lowest | 2,400 ₹60,000 |
| 3.00 | Pulling & tightening of loose conductor / AB cable / new conductor (LT & HT) per span, maintaining safe ground clearance as per CEA Safety Regulations. | 45 | Span | 340 ₹15,300 | 325 ₹14,625 Lowest | 450 ₹20,250 |
| 4.00 | Straightening of tilted poles by filling gitti/boulder/packing at base & tightening stay to bring the pole vertical. Packing material by contractor. | 45 | Job | 350 ₹15,750 | 325 ₹14,625 Lowest | 1,000 ₹45,000 |
| 5.00 | Cutting/trimming of tree branches fouling 11 kV / 33 kV lines and clearing the line for safe supply, with safe disposal of cut material. | 80 | Span | 140 ₹11,200 | 120 ₹9,600 Lowest | 500 ₹40,000 |
| 6.00 | Earthing of poles by GI earth rod/pipe with earth-wire connection; earth resistance as per IE Rules / CEA Regulations. Earth rod by contractor. | 80 | Job | 680 ₹54,400 | 600 ₹48,000 Lowest | 900 ₹72,000 |
| 7.00 | Providing and fixing of cradle/cage guarding of LT/HT lines at road/route crossings over the Kanwar route to maintain safe ground clearance per CEA Safety Regulations / IS 5613. The guarding shall comprise two bearer/guard wires cross-laced into a cradle below the conductors and earthed at both ends, complete with guarding cross-arms (at supporting poles, average span ~15 m) and cross-lacing/binding at intervals not exceeding 1 m. Measurement is per running metre of the guarded span, and the rate is deemed to include the complete cradle — both bearer wires + all cross-lacing + cross-arms + supports + earthing — for that length; it is NOT the length of a single wire/cable. GI guard wire (6 SWG) issued by the Department; cross-arms, lacing wire (10/12 SWG), binding wire (14/16 SWG), fittings, earthing and all labour by the contractor. | 1,000 | Mtr. | 260 ₹2,60,000 | 240 ₹2,40,000 | 45 ₹45,000 Lowest |
| 8.00 | Providing and Insulating HT/LT poles against probable leakage current by wrapping insulating plastic sheet of thickness >=50 micron (UV-resistant, weatherproof) from ground up to 8 ft (2.4 m) height in NOT LESS THAN 2 complete layers with minimum 50% overlap, bound sufficiently TIGHT at top, middle & bottom (no slack/slippage) so that no pole surface is exposed within 8 ft | 1,300 | Pole | 190 ₹2,47,000 | 110 ₹1,43,000 Lowest | 240 ₹3,12,000 |
| 9.00 | Providing and fixing of rigid uPVC casing pipe of 225 mm nominal outer diameter (9 inch), minimum wall ~4 mm, UV-stabilised (non-pressure casing grade), as slip-casing over round ST/STP poles from ground level up to 8 ft (approx. 2.5 m per pole); the bore (~217 mm) fits all pole classes — 9 m (~140 mm), 11 m (~165 mm) and 13 m (~194 mm base, per IS 2713). The pipe shall be slipped over the pole (or longitudinally slit and closed around it) and secured with a minimum of 3 nos MS clamps (top, middle and bottom), the clamps being welded to hold the casing firmly in position. Applicable to round poles. All material to be supplied by the contractor. | 100 | Pole | 1,000 ₹1,00,000 | 900 ₹90,000 Lowest | 2,250 ₹2,25,000 |
| 10.00 | Insulate stay with >=50 micron plastic-sheet wrapping (min. 2 layers, 50% overlap) Wrapping must be tighten with tape at min 4 places. Material by contractor. | 100 | Stay | 190 ₹19,000 | 110 ₹11,000 Lowest | 200 ₹20,000 |
Tender Value
₹12.8 L
EMD Value
₹12,800
Closing Date
14 Jul 2026, 2:00 pmClosed
SUPERTINDING ENGINEER, EDC LONI
33/11 KV SUBSTATION KOYAL ENCLAVE GDA BHOPURA GZB
WORK OF KAWAD YATRA UNDER EDD-I,II,III LONI
2026_PVVNL_1164114_1
T-09/W/EDC/LONI/GZB/2026-27
Open Tender
Electrical Works
Item Wise
365 days
EDD-I, II, III LONI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
Yes
SUPERTINDING ENGINEER EDC LONI
₹12,800
Yes
15 Jul 2026
25 Jun 2026
14 Jul 2026
25 Jun 2026
14 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Replacing broken/damaged LT/HT PCC/STP poles (9/11/13 m) & erecting new PCC pole (9/11/13 m) in mid-span to raise low-hanging conductors / AB cable to safe ground clearance – loading from store (up to 100 KM distance from site), carriage to site, return back the scrap to store again, pit digging (depth & grouting as per standard line-construction practice), erection, fixing clamp/cross-arm/insulator, sagging of conductors to safe ground clearance & restoring supply. All grouting material by contractor. | 48 | Job | - | - |
| 2 | Repair of rust-damaged ST poles (9/11/13 m) near ground by welding additional channel/angle/iron strip of approved section to restore strength. Channel/angle/strip by contractor. | 25 | Job | - | - |
| 3 | Pulling & tightening of loose conductor / AB cable / new conductor (LT & HT) per span, maintaining safe ground clearance as per CEA Safety Regulations. | 45 | Span | - | - |
| 4 | Straightening of tilted poles by filling gitti/boulder/packing at base & tightening stay to bring the pole vertical. Packing material by contractor. | 45 | Job | - | - |
| 5 | Cutting/trimming of tree branches fouling 11 kV / 33 kV lines and clearing the line for safe supply, with safe disposal of cut material. | 80 | Span | - | - |
| 6 | Earthing of poles by GI earth rod/pipe with earth-wire connection; earth resistance as per IE Rules / CEA Regulations. Earth rod by contractor. | 80 | Job | - | - |
| 7 | Providing and fixing of cradle/cage guarding of LT/HT lines at road/route crossings over the Kanwar route to maintain safe ground clearance per CEA Safety Regulations / IS 5613. The guarding shall comprise two bearer/guard wires cross-laced into a cradle below the conductors and earthed at both ends, complete with guarding cross-arms (at supporting poles, average span ~15 m) and cross-lacing/binding at intervals not exceeding 1 m. Measurement is per running metre of the guarded span, and the rate is deemed to include the complete cradle — both bearer wires + all cross-lacing + cross-arms + supports + earthing — for that length; it is NOT the length of a single wire/cable. GI guard wire (6 SWG) issued by the Department; cross-arms, lacing wire (10/12 SWG), binding wire (14/16 SWG), fittings, earthing and all labour by the contractor. | 1,000 | Mtr. | - | - |
| 8 | Providing and Insulating HT/LT poles against probable leakage current by wrapping insulating plastic sheet of thickness >=50 micron (UV-resistant, weatherproof) from ground up to 8 ft (2.4 m) height in NOT LESS THAN 2 complete layers with minimum 50% overlap, bound sufficiently TIGHT at top, middle & bottom (no slack/slippage) so that no pole surface is exposed within 8 ft | 1,300 | Pole | - | - |
| 9 | Providing and fixing of rigid uPVC casing pipe of 225 mm nominal outer diameter (9 inch), minimum wall ~4 mm, UV-stabilised (non-pressure casing grade), as slip-casing over round ST/STP poles from ground level up to 8 ft (approx. 2.5 m per pole); the bore (~217 mm) fits all pole classes — 9 m (~140 mm), 11 m (~165 mm) and 13 m (~194 mm base, per IS 2713). The pipe shall be slipped over the pole (or longitudinally slit and closed around it) and secured with a minimum of 3 nos MS clamps (top, middle and bottom), the clamps being welded to hold the casing firmly in position. Applicable to round poles. All material to be supplied by the contractor. | 100 | Pole | - | - |
| 10 | Insulate stay with >=50 micron plastic-sheet wrapping (min. 2 layers, 50% overlap) Wrapping must be tighten with tape at min 4 places. Material by contractor. | 100 | Stay | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_2182603.xls
BOQ • 4.80 MB
pdf.pdf
Tender Documents • 10.00 MB
Corri.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .