| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.2 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹45.8 L+₹65,062.40 (1.44%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹47.6 L+₹2.4 L (5.25%)Accepted-Finance PLOT NO 2 NH 2 NEAR HOTEL ZURICH VILLAGE AGWANPUR OPP DIMOND GROUP CNG PUMP DISTRICT PALWAL HARYANA | PALWAL | PALWAL | HARYANA | L3 | Accepted-Finance L3 | |
| 4 | L4₹47.7 L+₹2.5 L (5.63%)Accepted-Finance NA | PALWAL | HARYANA | 121004 | L4 | Accepted-Finance L4 | |
| 5 | L5₹50.7 L+₹5.5 L (12.1%)Accepted-Finance BHIWANI | BHIWANI | HARYANA | 127021 | L5 | Accepted-Finance L5 |
Tender Value
₹56.1 L
EMD Value
₹1.1 L
Closing Date
9 Jan 2025, 5:00 pmClosed
RITESH
PD Palwal
Special Repair by way providing Strengthening by CCP on Hodal Hassanpur road (ID 3458) from km 8.27 to 8.54 km in Hodal constituency in Provincial Division, PWD BandR BR., Palwal under work programme 2023-24 in Palwal Distt. (Under Head 5054-Group-6)
2025_HRY_421932_1
20250A9AB4DE E794 40D2 A42E B3912674915B624BAR
Open Tender
Civil Works
Works
90 days
BHIDUKI
Special Repair by way providing Strengthening by CCP on Hodal Hassanpur road (ID 3458) from km 8.27 to 8.54 km in Hodal constituency in Provincial Division, PWD BandR BR., Palwal under work programme 2023-24 in Palwal Distt. (Under Head 5054-Group-6)
2 documents required · 2 mandatory
₹5,000
₹1.1 L
Yes
27 Jan 2025
3 Jan 2025
10 Jan 2025
3 Jan 2025
9 Jan 2025
3 Jan 2025
3 Jan 2025 - 9 Jan 2025
Amount
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[17.26.2]Tack Coat 2. Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications [Through Rate]
[17.27.4]Bituminous Macadam with batch type HMP 4. Providing and laying bituminous macadam 50-75 mm thick with Continuous type hot mix plant 40-60 TPH using crushed aggregates of specified grading premixed with bituminous binder VG - 30 @3.4% transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction complete as per technical clause 504 of MORT&H specifications. Note-If bitumen required is more than 3.4% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. [Through Rate]
[17.45]Cement Concrete Pavement Construction of un-reinforced M-40 grade concrete pavement with dowel jointed, over a prepared sub base with 43 grade OPC cement concrete coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a fully computerised batching and mixing plant as per approved mix design, transported to site in transit mixer with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing, complete as per clause 602 of MORT&H specifications. [Through Rate]
[17.6]Construction of Embankment with Material obtained from Borrow pits NA Construction of Embankment CBR 8% (for new road/ raising/ berms/ etc.) with approved material obtained from borrow pits, including compensation of earth with all lead and lift transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications. [Through Rate]
[34.8.2]Informatory sign board 800x600 rectangular as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and as per IRC 67 2012 fixed over 4 mm thick aluminium Composite material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 without cost of definition plate firmly fixed to ground in foundation concrete M-25 of size 0.45x0.45x0.75m for vertical post complete as per clause 801 of MORTandH specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting and a certified copy of test reports from an independent test laboratory including three year outdoor weathering test report for sheeting tested in India condition conforming to clause 6.7 of IRC 67-2012 2. Using high intensity Microprisomatic grade retro reflective Sheeting Class B as per IRC 67 2012 [Through Rate]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
M/s Yug Constructions (BID ID -1198013)
Pulkit Aggarwal (BID ID -1198385)
M/s ACE Contractor (BID ID -1196059)
manoj kumar contractor (BID ID -1198267)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .