| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹53.8 LAccepted-AOC | 1st | Accepted-AOC Accept | |
| 2 | 2nd₹62.5 L+₹8.7 L (16.2%)Rejected-AOC | 2nd | Rejected-AOC Reject | |
| 3 | 3rd₹69.1 L+₹15.4 L (28.6%)Rejected-AOC | 3rd | Rejected-AOC Reject |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
30 Sept 2020, 4:00 pmClosed
Executive Engineer SSD Khaltsi
Office of the Executive Engineer SSD Khaltsi
Construction of Link Road from Saspochay gonpa to Saspochay phoo by way of Earth work cutting,R/Wall,B/Wall from Rd 0-1600 mtr(in Link Road from Saspochay to saspochay Phoo)
2020_PWD_635_4
E-Tender- 05 of SSD Khaltsi 2020-21
Open Tender
Civil Works - Roads
Item Rate
60 days
Khaltsi
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer SSD Khaltsi
₹1.5 L
2 Dec 2020
24 Sept 2020
2 Oct 2020
25 Sept 2020
30 Sept 2020
25 Sept 2020
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: All kinds of soil
Ordinary Rock
Hard Rock (Required blasting)
Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches, drains, pipes and cables etc. (not exceeding 1.5mtr in width or 1 Osqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5mtr including getting out excavated soil and disposal of surplus soil as directed, within a lead of 50 mtr. All kinds of soil
Dry random rubble masonry with hard stone in foundation and plinth: Using quarry stone with bond stone.
Random rubble masonry with hard stone from quarry in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) (Labour Rate) Stone available at site
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift up to 1.5m
Dumping of stone excluding cost of stone on horizontal on level.complete job.
Providing and laying damp-proof course 50 rnm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand 4 graded stone aggregate 20mm nominal size .
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)(Crushed)
Carriage of Material by Mechanical Transport including loading unloading complete job Cement for an avg.lead of 40 km
Sand and Stone agg.for an avg.lead of 15 km
Stone for an avg.lead of 6 km
M/S LOBZANG ZOTPA
M/S KONCHOK STOBGAIL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .