Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-Finance 2 90 SREE COLONY KOLKATA 700092 | KOLKATA | KOLKATA | WEST BENGAL | 700092 | L1 | Accepted-Finance L1 | |
| 2 | L2₹12.0 L+₹47,547.25 (4.13%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹12.0 L+₹52,724.32 (4.58%)Rejected-Finance 59 1 H 1 DR SURESH CHANDRA BANERJEE ROAD KOLKATA 700010 | KOLKATA | KOLKATA | WEST BENGAL | 700010 | L3 | Rejected-Finance L3 | |
| 4 | L4₹13.1 L+₹1.6 L (14.3%)Rejected-Finance 10 A 1 JAHURA BAZAR LANE KASBA KOLKATA 700042 | KOLKATA | KOLKATA | WEST BENGAL | 700042 | L4 | Rejected-Finance L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically not Qualified |
Tender Value
₹13.6 L
EMD Value
₹27,248
Closing Date
8 Jun 2026, 11:30 amClosed
Executive Engineer kolkata Division Social Sector
76_Dr_Sundari_Mohan_Avenue_4th_Floor_Kolkata_700014
Construction of internal road and pathway including renovation of Gate in the compound ITI Gariahat
2026_WBPWD_5014158_1
WBPWD/EE/KDSS/NIT-1/2026-27
Open Tender
CIVIL WORKS
Percentage
90 days
Gariahat
Please refer Tender documents.
6 documents required · 6 mandatory
₹27,248
Yes
22 Jun 2026
18 May 2026
10 Jun 2026
18 May 2026
8 Jun 2026
25 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out heavy iron grated door or window (jail pattern or existing) with locking arrangement after cutting out from walls and refixing the same including mending all damages.[Mending charges to be paid separately] | 7.43 | Sqm. | 227 | ₹1,686.61 |
| 2 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. | 3.42 | Cum. | 447 | ₹1,528.74 |
| 3 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. Thick | 22.81 | Cum. | 939 | ₹21,418.59 |
| 4 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 44.06 | Sqm. | 19 | ₹837.14 |
| 5 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m.
(Mode of measurement: pre works and post works). (i) In ordinary soil | 186.41 | Cum. | 79.9 | ₹14,894.16 |
| 6 | Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity). | 62.68 | %Cum | 1,31,714 | ₹82,55,833.52 |
| 7 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 17.28 | %Cum | 11,927 | ₹2,06,098.56 |
| 7.01 | (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. | 5.13 | %Cum | 19,238 | ₹98,690.94 |
| 8 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 10.25 | Sq.M. | 24 | ₹246 |
| 9 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 4.48 | %Cum | 7,754 | ₹34,737.92 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
WBF2911.pdf
Tender Documents • 1.58 MB
BOQ_5082114.xls
BOQ • 0.30 MB
OID.pdf
Other Document • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .