| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.2 LAccepted-AOC COLABA MUMBAI | L1 | Accepted-AOC AOC | |
| 2 | L2₹96.2 L+₹2.3 L (2.46%)Rejected-Finance COLABA MUMBAI | L2 | Rejected-Finance Being other than lowest | |
| 3 | L3₹99.2 L+₹5.3 L (5.69%)Rejected-Finance | L3 | Rejected-Finance Being other than lowest | |
| 4 | L4₹1.0 Cr+₹6.1 L (6.54%)Rejected-Finance COLABA MUMBAI | YAVATMAL | MAHARASHTRA | 445001 | L4 | Rejected-Finance Being other than lowest |
Tender Value
₹88.5 L
EMD Value
₹1.6 L
Closing Date
20 May 2020, 6:00 pmClosed
JVR PRASAD IDSE SE CWE (NW) MUMBAI
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
CARRYING OUT REPAIRS ROUTINE MAINTENANCE INCLUDING MANNING AND OPERATION OF LIFTS IN MEENA KANYA SWATI CHITRA ANURADHA WNC O MESS MAIN OLD ANNEX NEW ANNEX 42 SOQ P E Q E Q W WNC O MESS AND OLD ANNEX AT NOFRA UNDER GE NW NOFRA
2020_MES_334105_1
8620/CWE(NW)Mumbai
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE NW NOFRA
Class C and category C (ii) and d (v)
8 documents required · 8 mandatory
₹1,000
Yes
GE (NW) Nofra
₹1.6 L
Yes
28 May 2020
14 Mar 2020
22 May 2020
14 Mar 2020
20 May 2020
4 Apr 2020
14 Mar 2020 - 3 Apr 2020
Amount
Manual operation of electrically operated lift (08 to 13 PS /1000Kg Goods) of any Make and model to serve up to G+6 upper floor(old annex building at WNC (O) mess, G+7 upper floor WNC (O) mess main, building G+13 upper floor (Meena,Kanya and Swati) and G+14 upper floor (Chitra, Anuradha), G+06 upper floors (New Annex building old annex ,42 SOQ building at WNC (O) mess main daily 16hrs) daily 16 hrs (including sundays and holidays) in two shift from 0600 hrs to 1400 hrs and 1400 hrs to 2200 hrs, including taking care of from any pilfrerage/ theft or damage etc, complete all as directed by Engineer-in-Charge.( total-09 buildings) Note :- (i) One lift operator to be employed in each bldg per shift. (ii) Passes will be processed alongwith (after verification of antecedence of deployed employees and verified experience certificate only. Pass shall not be granted without submission of proof of well qualified lift operators & experience certificate. In case of OEM, the qualification mentioned in note is not applicable which shall be verified by Engineer-in-Charge before issue of pass)
(iii) Contractor shall submit ID proof, Residential proof, Bank A/C details to department and obtain approval of Engineer-in-Charge before employing a person as Operator (iv) Payment to employees shall be done by crossed cheque through Aadhaar linked bank account only and it shall not be less than minimum fair wages as per act in vogue. The contractor shall submit proof to Engineer-in-Charge before claiming any payment. (v) Rescue Operators shall be trained for rescue passangers of lift by an enlisted OEM / Lift maintenance contractor / Lift maintenance having approval lift licence issued by lift inspector of PWD and certificate for the same be submitted with proposal for passes. (vi) Lift operator shall be available with lift cell as per the shift timings specified in the tender and he will report to JE E/M in-Charge or Lift Cell in-Charge. In case of emergency he will function according to their direction. If he is found absent or move without intimating to in-Charge of Lift Cell or JE E/M he will be treated as absent for the said shift and recovery to this effect for Rs 1500/- per shift shall be affected. (vii) Payment as per quoted rate shall also be deducted in addition to the penalty as specified above. (viii) In case of malfunctioning if any noticed, lift operator shall intimate to the lift cell. (ix) In case of any necessity for rescue operation or accident, Rescue Operator shall be capable of rescue the passenger and reacting to the situation (accident etc) (x) Contractor shall submit the labour licenece VAT as applicable according to latest labour laws /act & Copy of GST Regn registered number issued by concerned authority. (xi) Insurance coverage, compensation if any applicable or necessitated due to mis operation of lift shall be the responsibility of contractor. The quantum of compensation shall be assessed based on the BOO composing of Lift Inspector of Maharashtra State, representatives of both agencies carrying out M&O works and routine maintenance work of lift and members from department. (xii) Contractor has to submit proof of payment of EPF subscription made by him as applicable as per latest labour laws and act alongwith RAR failing which RAR will not be progressed for payment. (xiii) The rates quoted by the contractor shall be deemed to be included provision of all latest labour laws / regulations including all relevant taxes as applicable.
Repair and routine maintenance of lifts including carrying out daily check and periodical services of fully automatic electrical lifts 08 PS (544Kg) capacity of ECE Make with power operated doors simplex collective control system to serve G+13 upper floors including repair and replacement of unserviceable/defective minor parts such as bearings, bushes, all types of shoes, headers, hangers, door rope, door cards, door locks, control cards, and its contacts, control connector/ links, hall push buttons and its spares,rewinding of motors, welding of cracks/ broken any MS items/ parts, repair/ replacement of minor parts and door safety edge working at any principle and any type of sensor or mechanical safety lock, magnetic lock or contact,shaft limit switches, COP buttons,car position indicator, Fire alaram toggal switchs,intercoms; VVVF drive ,car door sills and landing door sills, cabin fan, cabin light etc, for safe operation of lift, repairs of complete to ensure safety and smooth/jerkfree operation of lift as specified and directed by Engineer-in-Charge in buildings : Meena, Kanya (G+13 upper floor) 02 Nos lift
All as per item No 2 above here in before but 06PS (408 Kgs) in WNC (O) mess main building (G+7 upper floor) 02 Nos lift at Nofra
All as per item No 2 above here in before 08PS (544 Kgs) in building in WNC (O) Mess old Annex-2 (G+6 upper floor) 02 Nos lift
All as per item No 2 above here in before but 13PS (884 Kgs) in building in Meena, Kanya (G+13 upper floor) 02 Nos lift
All as per item No 2 above here in before but 1000kg goods lift in building in Swati & Meena, (G+13 upper floor) 02 Nos lift
All as per item No 2 above here in before but 6 PS (408 Kgs) in building in WNC (O) Mess VIP (G+7 upper floor) 01 No lift
All as per item No 2 above here in before but 13PS ECE make lift (884 Kgs) in building : Chitra & Anuradha (G+14 upper floor) 02 Nos lift (i) Cost of spare parts / material required for above mentioned maintenance is deemed to be included in the quoted rate. No additional cost of spares is admissible for the above maintenance. (ii) One Rescue operator / lift mechanic shall be available round the clock at lift complaint cell to the safe & smooth functioning of the lift to carry - out rescue operation. (iii) The rates quoted by the contractor shall deemeed to be included repair/maintenance of hall push buttons, COP buttons, cabin lights, fan etc
Disconnecting and taking out unserviceable Governor steel wire rope after disconnecting from car cabin supply and fix in steel wire rope 08 mm dia ungalvanised 08/19 construction in and including necessary connection with machine room and shaft pit complete with clamp nuts bolts and washers complete all as specified and directed by Engr-in-charge
Dismantling and taking out unserviceable travelling cable from hoistway & supply and fixing new travelling cable PVC insulated 12 Core flate round type with standared copper conductor, 1100 volts grade of size 0.75 sqmm conforming to relavent IS in and including thimbles, suspended type freely move with car cabin up and down movement between ground and upper floors including necessary proper connection with mid way junction and other connection require in circuit complete all as specified and directed by engr-in-charge
Disconnecting and taking out unserviceable Main steel wire rope after disconnecting from car cabin supply and fixing main steel wire rope 13 mm dia ungalvanised 08/19 construction in and including necessary connection with machine room and shaft pit complete with clamp nut bolt and washers complete all as directed by Engr-in –charge
Disconnecting &taking out defective COP assembly, supply & fix new COP assembly suitable for 06 Ps lifts (G+9) floor complete illuminated push button for floor position indicator, alarm, non stop, door close, door open, cabin light, stop attendant out key etc including direction indicator of 7 segment display with CPI card on stainless steel face plate duly connected with existing control and electric system etc, all as specified & directed by Engr-in-Charge Location : Gemini, Revati, Kartikeya, Rohini
Dismantling and taking out u/s old control panel and control wiring and S & F new control panel in hinged MS powder coated cabinet, with control wiring comprising with multiple micro controlled programmed chip based, controlled by pulse modulation, complete with all safeties such as thermal over load protection , over current protection, auto phase reverse link to each other in net work, and compitable to 7.5 KW / 10.0 HP capacity VVVF drive including proper connection with proper lugs, terminal connectors screws and motor connection with galvanished sheet trucking 24 SWG including wiring of main motor with suitable size of standard copper cable etc lifts complete all as specified and as directed by Engr-in-Charge . Location :- Kartikeya, Gemini
Dismantling and taking out u/s old control panel and control wiring and S & F new control panel in hinged MS powder coated cabinet, with control wiring comprising with multiple micro controlled programmed chip based, controlled by pulse modulation, complete with all safeties such as thermal over load protection , over current protection, auto phase reverse link to each other in net work, and compitable to 11 KW / 15.0 HP capacity VVVF drive including proper connection with proper lugs, terminal connectors screws and motor connection with galvanished sheet trucking 24 SWG including wiring of main motor with suitable size of standard copper cable etc lifts complete all as specified and as directed by Engr-in-Charge . Location :- Anuradha, Chitra
S & F in repairs breaking resistor choke for 15 HP VFD and necessary wiring including MS box enclosures for 08 PS lifts complete all as specified and as directed
Disconnecting & Taking out defective unserviceable main drive (any type) from existing control panel and supply and fixing new main drive VVVF drive upto 11.0 KW/15.0 HP in 13 Paseenger lift G+14 storey building complete with all electric connection of following capacities Charge Make :- Yasakava / FUJI
Dismantling and taking out all defective batteries from existing ARD and supply and fixing new maintenance free batteries suitable for ARD including necessary connection like battery terminals of brass and copper lead heavy duty to connect the battery terminal of 12 VDC, 18 AH (one set-04 nos batteries for each) ARD. (Make : Exide)
Supply & Fix the toe guard, beneath the car made of sheet 1.2 mm thick, with angle support, having size of 750 mm height and length equivalent to cabin door opening width
Suitable for 08 Ps Lift (Swati, Sravana, Old Annexue, WNC Mess, WNC VIP)
Suitable for 13 Ps Lift (Swati, Sravana, Chitra, Anuradha)
Suitable for Goods Lift (Archana)
Supply & fix the barricade on car top, made of 2 mm thick 40 X 40 mm slotted angle all around three sides & total height of 800 mm
Suitable for 08 Ps Lift (Swati, Sravana, Old Annexue, WNC Mess, WNC VIP)
Suitable for 13 Ps Lift (Swati, Sravana, Chitra, Anuradha)
Suitable for Goods Lift (Archana)
The facia plate made of 1.2 mm thick CRCA sheet, duly painted black between the door sill and land header LOP edge, the width shall be 200 mm more than clear door opening
Suitable for 08 Ps Lift (Swati, Sravana, Old Annexue, WNC Mess, WNC VIP)
Suitable for 13 Ps Lift (Swati, Sravana, Chitra, Anuradha)
Suitable for Goods Lift (Archana)
Dismantling and taking out ARD control system and commissioning and testing of new ARD system including PC cards/diodes suitable for upto 15 HP motor including wiring with connected item in existing building all as specified and directed by the Engineer-in-Charge. Location : Anuradha
Taking down unserviceable cabin fan from car cabin and supply and fixing new new car cabin fan non oscilatting type axist flow single speed 300mm sweep, 240 volts ISI mark with grill complete all as specified & directed by Engr-in-Charge. Make :- EMCOVBMCINI.
Dismantling and taking out all defective automatic door drive unit and S & F New door drive unit with 1.0 HP motor, VVVF Drive car top drive as specified and directed by Engineer-in-charge.
Dismantling and taking out all defective existing old defective sensor wand supply and fix INFRA RED safety edge with power unit on car door to safe guard passenger entering and leaving the lift suitable for Passsenger lift and 800/900 mm x 2000 mm door opening
Veer High Tech Solution
Shree Elevator Engineering Co.
Escon Elevators Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .