| 1 | L1₹16.5 LAccepted-AOC 2 NEW ANAJ MANDI ANAND VIHAR KARNAL | KARNAL | KARNAL | HARYANA | L1 | Accepted-AOC ok | |
| 2 | L2₹19.6 L+₹3.1 L (19.0%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹20.9 L+₹4.4 L (26.7%)Rejected-Finance WARD NO 20 GURUDEV NAGAR 7 B KHOTHI NO 101 THANESAR DISTT KURUKSHETRA | THANESAR | KURUKSHETRA | HARYANA | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | The Singla Co Operative Labour and Construction Society Ltd Kurukshetra L3 | THE SHRI MEHANDIPUR BALAJI COOP L&C SOCIETY LTD. KARNAL L1 | THE VISHAVKARMA BARWALA COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00 | Providing and laying of cold bitumen bags of 50Kg. capacity for repair the metal roads, complete in all respect | 25 | Each | 280 ₹7,000 Lowest | 775 ₹19,375 | 850 ₹21,250 |
| 2.00 | Providing and laying 9`` dia PVC pipe ISI mark, complete in all respect. | 134.11 | Rmt. | 200 ₹26,822 Lowest | 790 ₹1,05,946.9 | 450 ₹60,349.5 |
| 3.00 | Repair of sewer connection at the site, including required material and labour charges, complete in all respects | 15 | Each | 5,000 ₹75,000 | 500 ₹7,500 Lowest | 1,000 ₹15,000 |
| 4.00 | Repair of water connection at the site, including required material and labour charges, complete in all respects | 21 | Each | 5,000 ₹1,05,000 | 100 ₹2,100 Lowest | 1,000 ₹21,000 |
| 5.00 | Cleaning of PVC pipe 230mm dia pipeline manually, including all tools and labours and safeting of garbage upto 2km from the site, etc., complete in all respects. | 175 | Rmt. | 215.3 ₹37,677.5 | 99 ₹17,325 Lowest | 800 ₹1,40,000 |
Tender Value
₹20.4 L
EMD Value
₹40,880
Closing Date
29 Jan 2026, 5:00 pmClosed
Om Prakash Kardam
Municipal Corporation Karnal
Repair of various damaged streets, drains, nallah, frames, potholes and patches in Ward No.18, M.C. Karnal.(Only for L/C Societies)
2026_HRY_498809_1
20261089AA7A 9A3D 49E5 83F2 8B958DF21A83747ULB
Open Tender
Civil Works
Works
120 days
Karnal
2 documents required · 2 mandatory
₹1,000
₹40,880
Yes
10 Mar 2026
22 Jan 2026
30 Jan 2026
22 Jan 2026
29 Jan 2026
22 Jan 2026
Providing and laying of cold bitumen bags of 50Kg. capacity for repair the metal roads, complete in all respect
Providing and laying 9`` dia PVC pipe ISI mark, complete in all respect.
Repair of sewer connection at the site, including required material and labour charges, complete in all respects
Repair of water connection at the site, including required material and labour charges, complete in all respects
Cleaning of PVC pipe 230mm dia pipeline manually, including all tools and labours and safeting of garbage upto 2km from the site, etc., complete in all respects.
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
[11.5.4]12 mm cement plaster of mix : 4. 1:6 (1 cement: 6 fine sand) [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Labour Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
[17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate]
[17.71]Relaying of available (removed and stacked) Interlocking Paver Block Pavement having thickness 100mm/80 mm/ 60 mm (average = 80mm) as per drawings and Technical Specification Clause 1504 [Through Rate]
[21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.34.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate]
[7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
[7.22.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_577374.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .