Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 19 M G WORKS S BLOCK NEAR PONDY ENGINEERS PONDICHERRY | PONDICHERRY | PUDUCHERRY | 605001 | Admitted-Finance |
| 2 | Admitted-Finance 36 151 E 25 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 02 | SALEM | TAMIL NADU | 621011 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹12,670
Closing Date
16 May 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/ES/MTPS2
O/o SE/ES/MTPS2
Reconditioning of wornout diffuser casing, taper casing, discharge casing, inducer casing, bell mouth casing of CEP
2022_EB_230845_1
OT15
Open Tender
Miscellaneous Works
Works
25 days
SE/ES/MTPS2
Refer tender document
4 documents required · 4 mandatory
₹0
₹12,670
Yes
2 Jun 2022
2 May 2022
17 May 2022
2 May 2022
16 May 2022
2 May 2022
120 days
Amount
Reconditioning of Condensate Extraction Pump –‘C’ Diffuser casing: Charges for Cleaning the inner portion of the Pump Diffuser casing, Removal of the fatigue material in the worn out portion by grinding/ machining, Welding with required L&T-EWAC make cast iron welding electrode (Terra CI 94) having optimum nickel content to be built up by considering the criticality of the base material composition and machining. Welding should be carried out with unique welding procedure combined with required preheating, maintaining inter pass temperature and heat insulation to avoid cracks during welding, Final machining of the flange seating face and circumferential machining for two casings of the pump & Final drilling of flange holes as per two casings including the charges for cast iron welding electrodes.
Reconditioning of Condensate Extraction Pump –‘C’ Tapper casing: Charges for Cleaning the inner portion of the Pump Taper casing, Removal of the fatigue material in the worn out portion by grinding/ machining, Welding with required L&T-EWAC make cast iron welding electrode (Terra CI 94) having optimum nickel content to be built up by considering the criticality of the base material composition and machining. Welding should be carried out with unique welding procedure combined with required preheating, maintaining inter pass temperature and heat insulation to avoid cracks during welding, Final machining of the flange seating Surface and circumferential machining for two casings of the pump & Final drilling of flange holes as per two casings including the charges for cast iron welding electrodes.
Reconditioning of Condensate Extraction Pump –‘C’ Discharge casing: Charges for Cleaning the inner portion of the Pump Discharge casing, Removal of the fatigue material in the worn out portion by grinding/ machining, Welding with required L&T-EWAC make cast iron welding electrode (Terra CI 94) having optimum nickel content to be built up by considering the criticality of the base material composition and machining. Welding should be carried out with unique welding procedure combined with required preheating, maintaining inter pass temperature and heat insulation to avoid cracks during welding, Final machining of the flange seating Surface and circumferential machining for two casings of the pump & Final drilling of flange holes as per two casings including the charges for cast iron welding electrodes.
Reconditioning of Condensate Extraction Pump –‘C’ Inducer casing, Bell Mouth casing: Charges for cleaning the inner portion of the Inducer Casing & Bell mouth casing, Removal of the fatigue material in the worn out portion by grinding/ machining, Welding with required L&T-EWAC make cast iron welding electrode (Terra CI 94) having optimum nickel content to be built up by considering the criticality of the base material composition and machining. Welding should be carried out with unique welding procedure combined with required preheating, maintaining inter pass temperature and heat insulation to avoid cracks during welding, Final machining of the flange seating Surface and circumferential machining for two casings of the pump & Final drilling of flange holes as per two casings including the charges for cast iron welding electrodes and Cost of complete set (1 set= 8 pcs) of Gasket
Transportation charges: To and fro transportation of the Condensate Extraction pump casings from MTPS-II site to work shop and work shop to MTPS-II site in safer condition
TAM AND CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .