Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance VILLAGE KENDA PARA BUMAN PARA PASCHIM BARDHAMAN 714233 WEST BENGAL INDIA | KENDA | PASCHIM BARDHAMAN | WEST BENGAL | 714233 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.8 L
EMD Value
₹6,000
Closing Date
15 May 2026, 4:00 pmClosed
Area Engineer Civil Kenda Area
Office of the General Manager Kenda Area, P.O. Haripur, Dist - Burdwan, West Bengal-713378
Re-construction of rest room and open shed at Quarry no.-1 near old chandimandir of New Kenda OCP under Kenda Area.
2026_ECL_359022_1
ECL/GM/Knd/AE(C)/ e-tender/26-27/02 date 04.05.2026
Open Tender
Civil Works - Buildings
Percentage
60 days
New Kenda
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
16 May 2026
4 May 2026
16 May 2026
4 May 2026
15 May 2026
5 May 2026
4 May 2026 - 8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | - | cum | 128.35 | - |
| 1.02 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | - | cum | 1,061.6 | - |
| 1.03 | Single Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling | - | sqm | 323 | - |
| 1.04 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 6,007.2 | - |
| 1.05 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) | - | cum | 5,960.2 | - |
| 1.06 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | 6,973.6 | - |
| 1.07 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | - | cum | 121.05 | - |
| 1.08 | Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to foor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | 8,420.4 | - |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | sqm | 494.05 | - |
| 1.1 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | - | sqm | 617 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.82 MB
Tendernotice_2.pdf
PDF • 1.22 MB
BOQ_371892.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .