Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.5 LAccepted-AOC | ₹48.5 L Quoted ₹58.1 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical P226 SWAGATA APARTMENT GROUND FLOOR LAKETOWN BLOCK A KOLKATA 700089 | KOLKATA | KOLKATA | WEST BENGAL | 700089 | - | - | Rejected-Technical Technically not suitable |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically not suitable |
| Sl No | Description | Qty | Unit | NEW ENGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00Overhauling of ESP of 300MW Unit 7 DPL under AHPEM DPL | ||||
| 1.01 | Dry cleaning work: Dry cleaning of ESP starting from ESP inlet duct, all ESP hoppers, gas distribution screens, all emitting electrodes, collecting plates & other allied zones | 1 | LS | 1,50,000 ₹1,50,000 Lowest |
| 1.02 | LP Water Jet cleaning: Water jet washing of total ESP internal including all hoppers, collecting plates, emitting electrodes & other allied zones. At the time of water washing if any chokage is found in the hoppers, the same shall be cleared immediately. All arrangements including hose & LP pressurizing pumps for the job has to be arranged by the vendor | 1 | LS | 7,30,000 ₹7,30,000 Lowest |
| 1.03 | EERM system: checking & rectification of emitting rapping system of all the ESP fields thoroughly including housing bearing assembly (checking & replacement if needed); job includes replacement/repair & alignment of rapping shafts, bearings, pin wheels, hammer assembly of all rapping system if required after checking of all ESP fields.(Max. 20% of total qty) | 28 | Nos | 32,000 ₹8,96,000 Lowest |
| 1.04 | CERM system: : checking & rectification of collecting rapping system of all the ESP fields thoroughly; job includes replacement/repair & alignment of rapping shafts, bearings, pin wheels, hammer assembly of all rapping system if required after checking of all ESP fields. (Max. 20% of total qty) | 28 | Nos | 32,000 ₹8,96,000 Lowest |
| 1.05 | Support insulator system: Replacement/Repair (Max 20% of total qty) & cleaning of insulator & heater (100% of total qty) | 112 | Nos | 1,500 ₹1,68,000 Lowest |
| 1.06 | Hopper heater: Replacement/Repair (Max.20% of total qty) & cleaning of heater (100%) | 168 | Nos | 680 ₹1,14,240 Lowest |
| 1.07 | GD screen: Replacement (Max. 20% of total qty)/Repair & alignment of inlet GD screen (three stages) | 1 | LS | 3,50,000 ₹3,50,000 Lowest |
| 1.08 | Anvil pads: Replacement/Refitting of anvil pads of all collecting plates of ESP fields, if required after checking. | 1 | LS | 1,25,000 ₹1,25,000 Lowest |
| 1.09 | Shock bar system: Repair & alignment of shock bar | 28 | Nos | 4,500 ₹1,26,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹73,000
Closing Date
3 Mar 2026, 4:00 pmClosed
The GM Power and Project DPL
Office of the GM Power and Project DPL, DPPS
Overhauling of ESP of 300MW Unit 7 DPL under AHPEM DPPS DPL
2026_DPL_1006934_1
WBDPL/ PP/T/12011 (99)/10/2025-GM-POW(DPL) /AHP EM/E/ 356 DATED-14.02.2026
Open Tender
Miscellaneous Works
Item Rate
Office of the GM Power and Project DPL
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹73,000
Conference Room
11 Jul 2026
14 Feb 2026
7 Mar 2026
14 Feb 2026
3 Mar 2026
17 Feb 2026
16 Feb 2026
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_2470411.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].