Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.1 LAdmitted-Finance | ₹58.1 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical P226 SWAGATA APARTMENT GROUND FLOOR LAKETOWN BLOCK A KOLKATA 700089 | KOLKATA | KOLKATA | WEST BENGAL | 700089 | - | - | Rejected-Technical Technically not suitable |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically not suitable |
| Sl No | Description | Qty | Unit | NEW ENGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00Overhauling of ESP of 300MW Unit 7 DPL under AHPEM DPL | ||||
| 1.01 | Dry cleaning work: Dry cleaning of ESP starting from ESP inlet duct, all ESP hoppers, gas distribution screens, all emitting electrodes, collecting plates & other allied zones | 1 | LS | 1,50,000 ₹1.5 L |
| 1.02 | LP Water Jet cleaning: Water jet washing of total ESP internal including all hoppers, collecting plates, emitting electrodes & other allied zones. At the time of water washing if any chokage is found in the hoppers, the same shall be cleared immediately. All arrangements including hose & LP pressurizing pumps for the job has to be arranged by the vendor | 1 | LS | 7,30,000 ₹7.3 L |
| 1.03 | EERM system: checking & rectification of emitting rapping system of all the ESP fields thoroughly including housing bearing assembly (checking & replacement if needed); job includes replacement/repair & alignment of rapping shafts, bearings, pin wheels, hammer assembly of all rapping system if required after checking of all ESP fields.(Max. 20% of total qty) | 28 | Nos | 32,000 ₹9.0 L |
| 1.04 | CERM system: : checking & rectification of collecting rapping system of all the ESP fields thoroughly; job includes replacement/repair & alignment of rapping shafts, bearings, pin wheels, hammer assembly of all rapping system if required after checking of all ESP fields. (Max. 20% of total qty) | 28 | Nos | 32,000 ₹9.0 L |
| 1.05 | Support insulator system: Replacement/Repair (Max 20% of total qty) & cleaning of insulator & heater (100% of total qty) | 112 | Nos | 1,500 ₹1.7 L |
| 1.06 | Hopper heater: Replacement/Repair (Max.20% of total qty) & cleaning of heater (100%) | 168 | Nos | 680 ₹1.1 L |
| 1.07 | GD screen: Replacement (Max. 20% of total qty)/Repair & alignment of inlet GD screen (three stages) | 1 | LS | 3,50,000 ₹3.5 L |
| 1.08 | Anvil pads: Replacement/Refitting of anvil pads of all collecting plates of ESP fields, if required after checking. | 1 | LS | 1,25,000 ₹1.3 L |
| 1.09 | Shock bar system: Repair & alignment of shock bar | 28 | Nos | 4,500 ₹1.3 L |
Tender Value
Refer Docs
EMD Value
₹73,000
Closing Date
3 Mar 2026, 4:00 pmClosed
The GM Power and Project DPL
Office of the GM Power and Project DPL, DPPS
Overhauling of ESP of 300MW Unit 7 DPL under AHPEM DPPS DPL
2026_DPL_1006934_1
WBDPL/ PP/T/12011 (99)/10/2025-GM-POW(DPL) /AHP EM/E/ 356 DATED-14.02.2026
Open Tender
Miscellaneous Works
Office of the GM Power and Project DPL
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹73,000
Conference Room
2 Apr 2026
14 Feb 2026
7 Mar 2026
14 Feb 2026
3 Mar 2026
17 Feb 2026
16 Feb 2026
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_2470411.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid