| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.3 LAccepted-AOC | ₹39.3 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹42.5 L+₹3.2 L (8.02%)Rejected-AOC S NO 279 1 1A PLOT NO 113 KUTWAL COLONY SASTHE WASTI LOHEGAON PUNE 411 047 | PUNE | MAHARASHTRA | 411047 | ₹42.5 L+₹3.2 L (8.02%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹42.8 L+₹3.5 L (8.86%)Rejected-AOC | ₹42.8 L+₹3.5 L (8.86%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹58.1 L+₹18.8 L (47.8%)Rejected-AOC | ₹58.1 L+₹18.8 L (47.8%) | L4 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Shree Ram Enterprises L2 | HIGH HILLS INFRA L1 | M/s Gayatri Contruction Co. L4 | M/s. ARK BUILDERS L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Civil Works
Surface excavation not exceeding 30 cm deep and averaging 15cm deep and getting out in soft/ disintegrated rock complete all as specified and as directed. | 280 | SQUARE METRE | 25 ₹7,000 Lowest | 30 ₹8,400 | 120 ₹33,600 | 66 ₹18,480 |
| 2.00 | Earth work in excavation in ordinary rock by mechanical means (Hydraulic excavator) in foundation trenches not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated material and disposal of surplus excavated material as directed within a lead of 50 m complete all specified and as directed. | 136 | CUBIC METRE | 600 ₹81,600 | 350 ₹47,600 Lowest | 1,800 ₹2,44,800 | 840 ₹1,14,240 |
| 3.00 | All as per Item No 02.00 described here-in-before but depth exceeding 1.50 m and not exceeding 3.00 m complete all specified and as directed. | 54 | CUBIC METRE | 750 ₹40,500 | 370 ₹19,980 Lowest | 2,000 ₹1,08,000 | 900 ₹48,600 |
| 4.00 | Earth work in excavation in ordinary rock by mechanical means (Hydraulic excavator) means over areas exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated material lead upto 50 m and lift upto 1.5m complete all specified and as directed. | 45.5 | CUBIC METRE | 650 ₹29,575 | 100 ₹4,550 Lowest | 1,750 ₹79,625 | 774 ₹35,217 |
| 5.00 | Removing excavated material exceeding 500 m but not exceeding 1.50 km and depositing where directed at a level not exceeding 1.5 m above the starting point all as specified and as directed. | 155.5 | CUBIC METRE | 150 ₹23,325 | 120 ₹18,660 Lowest | 240 ₹37,320 | 150 ₹23,325 |
| 6.00 | Returning filling in including spreading, levelling, watering and well ramming in layer not exceeding 25 cm thick for soft/ disintegrated rock complete all as specified and as directed. | 91.1 | CUBIC METRE | 100 ₹9,110 Lowest | 100 ₹9,110 Lowest | 180 ₹16,398 | 100 ₹9,110 Lowest |
| 7.00 | Material and labour for treating the top surface of filled earth at the rate of 5 litres of emulsion per square metre of surface complete all as specified and as directed. | 196.5 | SQUARE METRE | 250 ₹49,125 | 150 ₹29,475 | 340 ₹66,810 | 80 ₹15,720 Lowest |
| 8.00 | Material and labour for treating the soil under plinth protection at the rate of 5 litres of emulsion per square metre of surface area complete all as specified and as directed. | 44 | SQUARE METRE | 250 ₹11,000 | 150 ₹6,600 | 400 ₹17,600 | 80 ₹3,520 Lowest |
| 9.00 | Material and labour for treating the backfill in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical surface (Area of the sub structure in contact with backfill to be measured) complete all as specified and as directed. | 25 | SQUARE METRE | 300 ₹7,500 | 250 ₹6,250 | 190 ₹4,750 | 90 ₹2,250 Lowest |
| 10.00 | Material and labour for mooram / red bajri filling complete all as specified and as directed. | 10 | CUBIC METRE | 1,000 ₹10,000 | 1,000 ₹10,000 | 1,800 ₹18,000 | 380 ₹3,800 Lowest |
Tender Value
₹43.2 L
EMD Value
₹86,400
Closing Date
15 Jun 2026, 6:00 pmClosed
GE (I) (CG) GOA
Garrison Engineer (I) (CG) Goa HQ Coast Guard DHQ-11 Chicolna PO- Bogmalo Goa 403806
PROVISION OF DRYING AND IRONING ROOM FOR DHQ-11 UNDER GE (I) (CG) GOA
2026_MES_767581_1
8574/GOA/E8
Open Tender
Civil Works
Item Rate
270 days
GE (I) (CG) GOA
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE (I) (CG) GOA
₹86,400
23 Jul 2026
25 May 2026
22 Jun 2026
25 May 2026
15 Jun 2026
8 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil Works
Surface excavation not exceeding 30 cm deep and averaging 15cm deep and getting out in soft/ disintegrated rock complete all as specified and as directed. | 280 | SQUARE METRE | 1.25 | ₹350 |
| 2 | Earth work in excavation in ordinary rock by mechanical means (Hydraulic excavator) in foundation trenches not exceeding 1.5 m in width or 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated material and disposal of surplus excavated material as directed within a lead of 50 m complete all specified and as directed. | 136 | CUBIC METRE | - | - |
| 3 | All as per Item No 02.00 described here-in-before but depth exceeding 1.50 m and not exceeding 3.00 m complete all specified and as directed. | 54 | CUBIC METRE | 100 | ₹5,400 |
| 4 | Earth work in excavation in ordinary rock by mechanical means (Hydraulic excavator) means over areas exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated material lead upto 50 m and lift upto 1.5m complete all specified and as directed. | 45.5 | CUBIC METRE | 11 | ₹500.5 |
| 5 | Removing excavated material exceeding 500 m but not exceeding 1.50 km and depositing where directed at a level not exceeding 1.5 m above the starting point all as specified and as directed. | 155.5 | CUBIC METRE | 10 | ₹1,555 |
| 6 | Returning filling in including spreading, levelling, watering and well ramming in layer not exceeding 25 cm thick for soft/ disintegrated rock complete all as specified and as directed. | - | CUBIC METRE | 22 | - |
| 7 | Material and labour for treating the top surface of filled earth at the rate of 5 litres of emulsion per square metre of surface complete all as specified and as directed. | 196.5 | SQUARE METRE | - | - |
| 8 | Material and labour for treating the soil under plinth protection at the rate of 5 litres of emulsion per square metre of surface area complete all as specified and as directed. | 44 | SQUARE METRE | 1.25 | ₹55 |
| 9 | Material and labour for treating the backfill in contact with foundation at the rate of 7.5 litres of emulsion per square metre of vertical surface (Area of the sub structure in contact with backfill to be measured) complete all as specified and as directed. | 25 | SQUARE METRE | - | - |
| 10 | Material and labour for mooram / red bajri filling complete all as specified and as directed. | 10 | CUBIC METRE | 100 | ₹1,000 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
8574TENDERPAGES.pdf
Tender Documents • 0.95 MB
BOQ_859623.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .