Loading…
Loading…
Tender Value
Refer Docs
Closing Date
2 Jul 2026, 11:30 am4d left
Similar tender results from the same govt authority in the past 3 years.
SET OF WELDED PARTITION FRAME FOR NON AC
05261420
05261420
Limited - Indigenous
Unknown (Unspecified Location)
₹0
Exempted
22 Jun 2026
22 Jun 2026
Description :SET OF WELDED PARTITION FRAME FOR NON AC BANGLADESH COACH. NOTE: MAKE/MA NUFACTURER OF RAW MATERIAL SHALL BE M/s JSL OR M/s SAIL., as per Drawing: MP25PARNABANG V ERSION 3, Packing Instruction: `PACKING CONDITION OF SET OF PARTITION FRAME AND PROCEDURE T O ACHIEVE BEST POSSIBLE PROTECTION DURING TRANSPORTATION: 1. SURFACE PREPARATION: - THO ROUGHLY CLEAN THE COMPONENTS TO REMOVE ANY DIRT, GREASE OR CONTAMINANTS - APPLY A PR OTECTIVE FILM, SUCH AS PVC OR LASER FILM OR BUBBLE SHEET, TO SHIELD SURFACES FROM SCRAT CHES AND ENVIRONMENTAL FACTOR. 2. PACKING MATERIALS: - WOODEN CRATES: CONSTRUCT STUR DY WOODEN CAGE TAILORED TO THE COMPONENT'S DIMENSIONS. - STEEL STRAPPING: UTILIZE RUST- PROOF STEEL STRAPS TO SECURELY BUNDLE COMPONENTS, PREVENTING MOVEMENT DURING TRANS IT. 3. MOISTURE BARRIER: - INCORPORATE MOISTURE-PROOF MATERIALS, SUCH AS PLASTIC FILM OR WATER PROOF ABILITY PAPER, TO GUARD AGAINST CORROSION. 4. COMPONENT ARRANGEMENT: - PL ACE COMPONENTS ON WOODEN PALLETS OR WITHIN CUSTOM-DESIGNED SUPPORTS TO DISTRIBUTE WEIGHT EVENLY AND PREVENT DEFORMATION. - ENSURE THAT NO PART OF THE COMPONENT EXTEN DS BEYOND THE PROTECTIVE PACKAGING TO AVOID EXPOSURE TO POTENTIAL DAMAGE. 5. SECURING THE COMPONENTS: - USE STEEL STRAPS OR ROPES TO FIMLY ANCHOR THE COMPONENTS WITHIN THE WOODEN CRATE, MINIMIZING INTERNAL MOVEMENT. - FOR ADDED STABILITY, EMPLOY BRACING OR C USHIONING MATERIALS, SUCH AS FOAM PADS OR CORRUGATED INSERTS, TO FILL VOIDS AND ABSORB SHOCKS. - HARDWARE ITEMS TO BE SUITABLY PACKED SEPARATELY INSIDE THE CRATE. 6. LABELING AND DOCUMENTATION: - CLEARLY LABEL EACH PACKAGE WITH ESSENTIAL INFORMATION, INCLUDING PL NO. SPECIFICATIONS, DETAILS OF EACH SET WITH QTY. AND ALSO KEEP ONE COPY INSIDE OT THE CRATE, WEIGHT, HANDLING INSTRUCTIONS AND FIRM'S & DESTINATION DETAILS. 7. LOADING ONTO T RAILER/LORRY/TRUCK/TRANSPORT: - STRATEGICALLY POSITION THE PACKAGED COMPONENTS WITHIN THE TRUCK/SUITABLE TO MAINTAIN BALANCE AND PREVENT SHIFTING DURING TRANSIT. - SECURE TH E PACKAGES TO THE CONTAINER'S STRUCTURE USING LASHING TIES OR ADDITIONAL BRACING AS NE EDED. 8. FINAL INSPECTION AND SEALING: - CONDUCT A THOROUGH INSPECTION TO VERIFY THAT ALL COMPONENTS ARE SECURELY PACKED AND THAT PACKAGING MATERIALS ARE INTACT. [ Warrant y Period: 30 Months after the date of delivery ] ] Consignee SHELL DEPOT, RCF Punjab 58.00 Set Inspection Stage Inspection Not Required Details STORES/TKJ/RCF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5811569.pdf
ATTACHMENT
Download all tender documents and submit your bid