Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89.4 LAdmitted-Finance | ₹89.4 L | L1 | Admitted-Finance |
| 2 | L2₹98.2 L+₹8.9 L (9.94%)Admitted-Finance | ₹98.2 L+₹8.9 L (9.94%) | L2 | Admitted-Finance |
| 3 | L3₹1.0 Cr+₹15.1 L (16.9%)Admitted-Finance | ₹1.0 Cr+₹15.1 L (16.9%) | L3 | Admitted-Finance |
| 4 | L4₹1.1 Cr+₹18.8 L (21.0%)Admitted-Finance | ₹1.1 Cr+₹18.8 L (21.0%) | L4 | Admitted-Finance |
| 5 | L5₹1.2 Cr+₹25.8 L (28.9%)Admitted-Finance | ₹1.2 Cr+₹25.8 L (28.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PADMABATI INFRAPROJECTS PVT. LTD. L10 | M/S.RAMESH CHANDRA MOHANTY L1 | Ms Bichitra Kumar Jena L8 | M/S BHAIRAB CHARAN SWAIN L9 | SAMARESH CHHOTARAY L7 | M/s. P N Construction L4 | SM ENTERPRISES L2 | M/s.SAI SHREYASI CONSTRUCTION L5 | LAXMIDHAR ROUT L6 | KARAN KUMAR PANDA L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting the shrubs, bushes, cleaning, removing & disposing the debrises away from the site by Private Vehicles with all leads and lifts including levelling, dressing the ground with supply of all labour, T&P, taxes excluding GST, hire and running charges of vehicles including fuel, consumables, tollage etc. complete as directed by the Engineer-In-Charge. (Excluding GST) | 1,350 | Each sqm | 10 ₹13,500 | 1 ₹1,350 Lowest | 1.42 ₹1,917 | 5 ₹6,750 | 3 ₹4,050 | 8 ₹10,800 | 10 ₹13,500 | 1.5 ₹2,025 | 40.95 ₹55,282.5 | 20 ₹27,000 |
| 2.00 | Earth work in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles as directed by the Engineer-in-charge. (Excluding GST) | 780 | Each cum | 20 ₹15,600 Lowest | 60 ₹46,800 | 150 ₹1,17,000 | 50 ₹39,000 | 100 ₹78,000 | 80 ₹62,400 | 30 ₹23,400 | 100 ₹78,000 | 216 ₹1,68,480 | 120 ₹93,600 |
| 3.00 | Making 50 mm x 50 mm furrows, 25mm/ 50mm deep, 450 to the center line of the road and at one metre interval in the existing thin bituminous wearing coarse including sweeping and disposal of excavated material within 1000 metres lead with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC | 5,740 | Each sqm | 30 ₹1,72,200 | 2 ₹11,480 Lowest | 3.83 ₹21,984.2 | 10 ₹57,400 | 10 ₹57,400 | 50 ₹2,87,000 | 10 ₹57,400 | 4 ₹22,960 | 540 ₹30,99,600 | 70 ₹4,01,800 |
| 4.00 | Providing & laying quarry dust of aprroved as sub-base in layers not exceeding 225mm thick each watering and compacting to the required density in O.M.C with Vibratory Roller with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC | 305 | Each cum | 1,700 ₹5,18,500 | 700 ₹2,13,500 | 1,246 ₹3,80,030 | 700 ₹2,13,500 | 1,400 ₹4,27,000 | 1,000 ₹3,05,000 | 650 ₹1,98,250 | 1,250 ₹3,81,250 | 630 ₹1,92,150 Lowest | 700 ₹2,13,500 |
| 5.00 | Providing, laying, spreading and compacting stone aggregates of IRC Gr-II(63 mm to 45 mm ) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fill up the interstices of coarse aggregate with Quarry dust , watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC | 726 | Each Cum | 2,300 ₹16,69,800 | 1,900 ₹13,79,400 | 2,500 ₹18,15,000 | 1,600 ₹11,61,600 | 1,900 ₹13,79,400 | 1,800 ₹13,06,800 | 1,250 ₹9,07,500 Lowest | 2,350 ₹17,06,100 | 1,260 ₹9,14,760 | 1,400 ₹10,16,400 |
| 6.00 | Providing, laying, spreading and compacting stone aggregates of IRC Gr-III(53 mm to 22.4 mm ) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fill up the interstices of coarse aggregate with Quarry dust , watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC | 1,331.5 | Each Cum | 2,300 ₹30,62,450 | 1,900 ₹25,29,850 | 2,600 ₹34,61,900 | 1,750 ₹23,30,125 | 2,000 ₹26,63,000 | 2,000 ₹26,63,000 | 1,650 ₹21,96,975 | 2,350 ₹31,29,025 | 1,350 ₹17,97,525 Lowest | 1,500 ₹19,97,250 |
| 7.00 | Providing & laying 37.5mm thick built up spray grouting in one layers 37.5mm thick using 0.45cum of 25mm to 40mm size hard granite metal and 12.00Kg penetration grade of bitumen for 10 Sqm & 0.12cum of 12mm size hard granite chips as key stone for 10 Sqm spreading over and laying including heating pouring and spreading bitumen metal and chips and rolling with PRR after scraping cleaning the road surface applying tack coat using 3.0Kg of bitumen for 10 Sqm including Supply of all material , labour , T&P, hire and running charge of Equipments , taxes ,tollage etc all complete but excluding GST. as ditrected by EIC. | 200 | Each sqm | 450 ₹90,000 | 150 ₹30,000 | 200 ₹40,000 | 300 ₹60,000 | 250 ₹50,000 | 300 ₹60,000 | 250 ₹50,000 | 250 ₹50,000 | 900 ₹1,80,000 | 50 ₹10,000 Lowest |
| 8.00 | Providing and applying primer coat by emulsion pressure distributer with bitumen emulsion on prepared surface of granular Base including brooming of road surface and cleaning the forigh materials by using air compressior before applying and spraying primer at the rate of 0.60 kg/sqm with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC. | 8,809.5 | Each Sqm | 50 ₹4,40,475 | 8 ₹70,476 Lowest | 12 ₹1,05,714 | 20 ₹1,76,190 | 12 ₹1,05,714 | 80 ₹7,04,760 | 85 ₹7,48,807.5 | 14 ₹1,23,333 | 306 ₹26,95,707 | 40 ₹3,52,380 |
| 9.00 | Providing and laying 75 mm thick bituminous macadam with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates 40 mm-25 mm @ 15%,25-10 mm @45%,10-5 mm @25%, 5mm @15% of total volume of chips adding premixed with bituminous binder of VG-30 bitumen of 3.1% of total volume, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled by VRR to achieve the desired compaction as per clauses 501.6 and 501.7 with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC (For New work) | 661 | Each Cum | 9,000 ₹59,49,000 | 4,600 ₹30,40,600 | 6,100 ₹40,32,100 | 9,000 ₹59,49,000 | 7,500 ₹49,57,500 | 5,500 ₹36,35,500 | 5,950 ₹39,32,950 | 5,900 ₹38,99,900 | 1,620 ₹10,70,820 Lowest | 6,800 ₹44,94,800 |
| 10.00 | Providing and laying 25 mm thickdense semi dense bituminous concrete with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates ,,10-5 mm @57%, 4.75 mm and below @41% and stone dust @2% of total volume of chips adding premixed with bituminous binder of VG-30 bitumen of 5% of total volume, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled by VRR to achieve the desired compaction as per clauses 501.6 and 501.7 with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC | 220.5 | Each cum | 9,000 ₹19,84,500 | 5,800 ₹12,78,900 | 8,000 ₹17,64,000 | 9,500 ₹20,94,750 | 8,500 ₹18,74,250 | 5,500 ₹12,12,750 | 6,000 ₹13,23,000 | 7,800 ₹17,19,900 | 1,404 ₹3,09,582 Lowest | 7,000 ₹15,43,500 |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
5 May 2025, 5:00 pmClosed
EE, PRD,PPA
Port Railway Division, Engineering Department, 1st Floor, Administrative Building, Paradip Port Authority. Mob-9437319398
Repairing of Bituminous Road from PPL Junction to Railway Station at Paradip.
2025_MoS_856683_1
CE/PRD/ACCTS-17/24/138
Open Tender
Civil Works
Works
paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
Yes
As per eTCN and TD
₹2.6 L
Yes
26 May 2025
15 Apr 2025
6 May 2025
15 Apr 2025
5 May 2025
15 Apr 2025
Amount
Cutting the shrubs, bushes, cleaning, removing & disposing the debrises away from the site by Private Vehicles with all leads and lifts including levelling, dressing the ground with supply of all labour, T&P, taxes excluding GST, hire and running charges of vehicles including fuel, consumables, tollage etc. complete as directed by the Engineer-In-Charge. (Excluding GST)
Earth work in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles as directed by the Engineer-in-charge. (Excluding GST)
Making 50 mm x 50 mm furrows, 25mm/ 50mm deep, 450 to the center line of the road and at one metre interval in the existing thin bituminous wearing coarse including sweeping and disposal of excavated material within 1000 metres lead with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC
Providing & laying quarry dust of aprroved as sub-base in layers not exceeding 225mm thick each watering and compacting to the required density in O.M.C with Vibratory Roller with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC
Providing, laying, spreading and compacting stone aggregates of IRC Gr-II(63 mm to 45 mm ) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fill up the interstices of coarse aggregate with Quarry dust , watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC
Providing, laying, spreading and compacting stone aggregates of IRC Gr-III(53 mm to 22.4 mm ) size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fill up the interstices of coarse aggregate with Quarry dust , watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC
Providing & laying 37.5mm thick built up spray grouting in one layers 37.5mm thick using 0.45cum of 25mm to 40mm size hard granite metal and 12.00Kg penetration grade of bitumen for 10 Sqm & 0.12cum of 12mm size hard granite chips as key stone for 10 Sqm spreading over and laying including heating pouring and spreading bitumen metal and chips and rolling with PRR after scraping cleaning the road surface applying tack coat using 3.0Kg of bitumen for 10 Sqm including Supply of all material , labour , T&P, hire and running charge of Equipments , taxes ,tollage etc all complete but excluding GST. as ditrected by EIC.
Providing and applying primer coat by emulsion pressure distributer with bitumen emulsion on prepared surface of granular Base including brooming of road surface and cleaning the forigh materials by using air compressior before applying and spraying primer at the rate of 0.60 kg/sqm with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC.
Providing and laying 75 mm thick bituminous macadam with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates 40 mm-25 mm @ 15%,25-10 mm @45%,10-5 mm @25%, 5mm @15% of total volume of chips adding premixed with bituminous binder of VG-30 bitumen of 3.1% of total volume, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled by VRR to achieve the desired compaction as per clauses 501.6 and 501.7 with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC (For New work)
Providing and laying 25 mm thickdense semi dense bituminous concrete with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates ,,10-5 mm @57%, 4.75 mm and below @41% and stone dust @2% of total volume of chips adding premixed with bituminous binder of VG-30 bitumen of 5% of total volume, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled by VRR to achieve the desired compaction as per clauses 501.6 and 501.7 with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC
Providing and laying the tack coat over the prepared granular or bituminous surface 0.20 Kg/Sqm with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC)
Blinding road surface with 6mm thick Quarry Dust over the final surface of bitumen with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC
Engagement of hydraulic excavator with supply of all operator, lubricants, T &P, etc all complete as directed by Engineer in charge excluding cost of GST.
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes supply of all materials, T&P, labour, Hire and running charges, of all machineries, safety measures, taxes excluding GST etc., all complete as directed by Engineer-In-Charge.
Supply of labour, machineries, T&P, single phase power supply unit etc. for core cutting in concrete works of following specifications including cutting in to size perfectly in uniform shape including Port entry fees, all taxes, hire and running charges of all machineries, equipments, Generator (DG Set) for single phase power supply, cost of fuel and consumables, operator expenses etc. all complete excluding GST and as per direction of Engineer in charge.
Supplying of 150mm dia GI Pipe medium quality conforming to IS-1239, part - 1 (2004) transporting, cutting, placing, proper fixing of GI with cost & expenses of all materials, tools and plants,labour charges, machineries, taxes, tollages, VAT, Port entry fees etc all complete as per direction of Engineer in charge (Excluding GST).
SM ENTERPRISES (BID ID -3210507)
KARAN KUMAR PANDA (BID ID -3210532)
M/s. P N Construction (BID ID -3210374)
M/s.SAI SHREYASI CONSTRUCTION (BID ID -3210530)
LAXMIDHAR ROUT (BID ID -3209012)
SAMARESH CHHOTARAY (BID ID -3210355)
Ms Bichitra Kumar Jena (BID ID -3209497)
M/S BHAIRAB CHARAN SWAIN (BID ID -3209641)
PADMABATI INFRAPROJECTS PVT. LTD. (BID ID -3208288)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_900661.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .