| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance | -8.87% | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.3 CrAdmitted-Finance | -6.78% | ₹3.3 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.4 CrAdmitted-Finance | -4.00% | ₹3.4 Cr | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.6 Cr
EMD Value
₹7.2 L
Closing Date
27 Apr 2026, 6:00 pmClosed
GM RSRDC LTD JAIPUR
GM RSRDC LTD SETU BHAWAN, JHALANA DOONGARI, JAIPUR
Construction of Regional Office and Laboratory Building for Pollution Control Board at Jhunjhunu (Excluding cost of Cement and Electrical Works)
2026_RSRDC_550097_1
RSRDCC NIT 005/2026-27 Dated 02.04.2026
Open Tender
Civil Works - Buildings
365 days
PCB at Jhunjhunu
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹2,360
PD RSRDC UNIT JHUNJHUNU THROUGH NEFT/RTGS/IMPS
₹7.2 L
PD RSRDC UNIT JHUNJHUNU
6 May 2026
6 Apr 2026
28 Apr 2026
6 Apr 2026
27 Apr 2026
16 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | - | Sqm | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | - | Cum | - | - |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating each deposited layer by ramming and watering including lead up to 50 meter and with all lift. | - | Cum | - | - |
| 4 | Diluting and injection Chloropyrifos Emulsifiable concentrate 20% with 1% concentration for PRE-CONSTRUCTIONAL Anti termite treatment as per IS 6313 part III as amended from time to time and creating a continuous chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor along the external perimeter of building expansion joints, over the top surface of consolidated earth of which aproch is to be laid surrounding of pipes and conduits etc. complete as per specification (Plinth floor area only shall be measured for payment and excluding the cost of chemical emulsion) . | - | Sqm | - | - |
| 5 | Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/Lindane emulsifiable concentrate of 20% | - | Ltr | - | - |
| 6 | Earth, sand, gravel, u/s kankar, lime, flyash, morrum, manure or sludge. For 5 km | - | Cum | - | - |
| 7 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | - | Cum | - | - |
| 8 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | - | Sqm | - | - |
| 9 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | - | Sqm | - | - |
| 10 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for : Columns, pillars, posts and struts etc. | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
pdbankdetails.pdf
Tender Documents • 0.45 MB
SBDPollutionControlBoardjjn.pdf
Tender Documents • 0.71 MB
BOQ_980638.xls
BOQ • 0.45 MB
Various_Act_Circulars_Orders_Notification.pdf
Tender Documents • 1.27 MB
Download all tender documents and submit your bid