| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 quoted less than tender value |
| 2 | L2₹1.2 Cr+₹1.1 L (0.97%)Rejected-AOC ERODE 638 002 | ERODE | TAMIL NADU | 638002 | ₹1.2 Cr+₹1.1 L (0.97%) | L2 | Rejected-AOC L2 quoted greater than tender value |
| Sl No | Description | Qty | Unit | A SURESHKUMAR L1 | R SURESHMANI L2 |
|---|---|---|---|---|---|
| 1.00Vellore District Construction of Bus Parking Shelter at K.V.Kuppam Block Scheme Component of pooled assigned revenue 2024-25 Package No 01 | |||||
| 2.00 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification with Refilling. | 589.3 | cu.m | 245.52 ₹1,44,684.94 Lowest | 299.52 ₹1,76,507.14 |
| 3.00 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications. | 24.65 | cu.m | 1,681.02 ₹41,437.14 Lowest | 1,681.02 ₹41,437.14 Lowest |
| 4.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 24.65 | cu.m | 5,301.28 ₹1,30,676.55 Lowest | 5,401.28 ₹1,33,141.55 |
| 5.00 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 426.21 | cu.m | 41.85 ₹17,836.89 Lowest | 71.85 ₹30,623.19 |
| 6.00Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | |||||
| 7.00 | Footing, Plinth Beam, etc. | 148.81 | sq.m | 516.5 ₹76,860.37 Lowest | 536.5 ₹79,836.57 |
| 8.00 | Column upto Basement | 85.47 | sq.m | 515.5 ₹44,059.79 Lowest | 535.5 ₹45,769.19 |
| 9.00Design Mix Concrete | |||||
| 10.00Providing and laying in position, Standardised Concrete Mix M-25 Grade in accordance with IS:456-2000, using 20mm and down grade hard broken granite stone jelly for all RCC Items of works with minimum cement content of 350kg/m3 and maximum water cement ratio of 0.50, including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS:9130 to accelerate, rated setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m) 7730kg. of 20mm machine crushed stone jelly and with about (3.3cum) 5156 kg. of 10-12mm machine crused stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with Mechanical vibrators, finishing, curing, etc.,and providing fixtures like fan clamps in the RCC Floor / roof slabs wherever necessary without claiming extra, etc., Complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No Separate payment will be made by the Department for the excess usage of materials). | |||||
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
2 Dec 2024, 3:00 pmClosed
The Project Director
The Project Director,DRDA Vellore.
Vellore District Construction of Bus Parking Shelter at K.V.Kuppam Block of Scheme Component of pooled assigned revenue 2024-25 Package No 01
2024_RDTN_503857_1
A8/2065/2024
Open Tender
Civil Works
Item Wise
180 days
The Project Director, DRDA Vellore.
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.2 L
29 Sept 2025
22 Nov 2024
2 Dec 2024
22 Nov 2024
2 Dec 2024
22 Nov 2024
Amount
Vellore District Construction of Bus Parking Shelter at K.V.Kuppam Block Scheme Component of pooled assigned revenue 2024-25 Package No 01
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification with Refilling.
Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site.
Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid).
Footing, Plinth Beam, etc.
Column upto Basement
Design Mix Concrete
Providing and laying in position, Standardised Concrete Mix M-25 Grade in accordance with IS:456-2000, using 20mm and down grade hard broken granite stone jelly for all RCC Items of works with minimum cement content of 350kg/m3 and maximum water cement ratio of 0.50, including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS:9130 to accelerate, rated setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m) 7730kg. of 20mm machine crushed stone jelly and with about (3.3cum) 5156 kg. of 10-12mm machine crused stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with Mechanical vibrators, finishing, curing, etc.,and providing fixtures like fan clamps in the RCC Floor / roof slabs wherever necessary without claiming extra, etc., Complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No Separate payment will be made by the Department for the excess usage of materials).
Foundation & Basement
Steel - Fe 500 D
Supply, fabrication and placing of reinforcement steel of high yield strength ribbed bars of various diameters and grade conforming to IS 1786 for reinforced concrete work. The work includes recoiling, straightening, cutting, bending, fabricating, and placing in position, at all levels including lead and lift, according to drawings, specifications etc. complete and supply & use of 18G black annealed binding wire double fold to tie the bars in position and providing precast cement/ PVC cover blocks for main reinforcement to ensure specified cover and complete., including all labor charges etc as directed by departmental officers.
TRUSS WORKS B1
Steel Structure
Design, Fabrication and Erection of Pre Fabricated Steel Structures including fusion bonded epoxy coating not less then 175 microns to all steel structures as per specifications, dimensions and design by Engineer Incharge
Supplying and fixing Colour Galvalume Sheet 0.47mm thick For Commercial fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers.
Supply and Fixing of 0.47mm thick,AZ 150 and 550 Mpa,Colour Coated Galvalume,Eave Gutter, M- 0719
Supply and fixing in position best quality PVC IS 4985 - CLASS-II - 4 Kg/Sqcm -Rain water pipes of various size having ISI mark and providing leak proof joints with such as Bend, Tee Junction, door etc.,of approved qualityincluding fixing to the wall with special PVC /MS clamps, etc., and making connection to all sanitary fittings, wherever necessary and making chipping good to the original condition,complying with standard specification etc.,complete.
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
R SURESHMANI (BID ID -1198954)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .