Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | -41.20% | ₹2.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.5 L+₹7,760.11 (3.23%)Admitted-Fee/PreQual/Technical/Finance | -39.30% | ₹2.5 L+₹7,760.11 (3.23%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.5 L+₹8,985.39 (3.74%)Admitted-Fee/PreQual/Technical/Finance | -39.00% | ₹2.5 L+₹8,985.39 (3.74%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.5 L+₹10,251.51 (4.27%)Admitted-Fee/PreQual/Technical/Finance | -38.69% | ₹2.5 L+₹10,251.51 (4.27%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹2.9 L+₹45,743.83 (19.0%)Admitted-Fee/PreQual/Technical/Finance DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | -30.00% | ₹2.9 L+₹45,743.83 (19.0%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.1 L
EMD Value
₹8,160
Closing Date
18 Sept 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
boq
2026_RDPR_324431_11
e-NIT No. 179 REW UDHAMPUR of 2026-27 Dated 12-09-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
nit
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹8,160
21 Sept 2026
12 Sept 2026
19 Sept 2026
12 Sept 2026
18 Sept 2026
12 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Add cost of sign board | 1 | No. | 3,000 | ₹3,000 |
| 2 | Earh Work in Bulk Excavation in all kind of soils disposal lead 50m and lift upto 1.5 m By manual means | 13.23 | cum | 592.9 | ₹7,844.07 |
| 3 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 12.03 | cum | 479.3 | ₹5,765.98 |
| 4 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 6.28 | cum | 4,826.5 | ₹30,310.42 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size | 40.9 | Cum | 5,733.6 | ₹2,34,504.24 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size | 10.27 | Cum | 937.9 | ₹9,632.23 |
| 7 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone | 10 | Cum | 2,793.8 | ₹27,938 |
| 8 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Foundation, footing | 90.78 | Sqm | 286.35 | ₹25,994.85 |
| 9 | Filling of stones | 7.43 | Cum | 937.9 | ₹6,968.6 |
| 10 | Filling of earth | 7.43 | Cum | 218.2 | ₹1,621.23 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1094334.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .