| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.0 LAdmitted-Finance | -22.10% | ₹35.0 L | L1 | Admitted-Finance |
| 2 | L2₹35.5 L+₹50,284.21 (1.44%)Admitted-Finance H NO 1A NEAR TEEJA JI KA MANDIR MAIN SODALA JAIPUR RAJASTHAN 302019 | JAIPUR | RAJASTHAN | 302019 | -20.98% | ₹35.5 L+₹50,284.21 (1.44%) | L2 | Admitted-Finance |
| 3 | L3₹36.3 L+₹1.3 L (3.84%)Admitted-Finance MALVIYA NAGAR JAIPUR | JAIPUR | RAJASTHAN | 302001 | -19.11% | ₹36.3 L+₹1.3 L (3.84%) | L3 | Admitted-Finance |
| 4 | L4₹37.0 L+₹2.0 L (5.84%)Admitted-Finance | -17.55% | ₹37.0 L+₹2.0 L (5.84%) | L4 | Admitted-Finance |
| 5 | L5₹37.6 L+₹2.6 L (7.56%)Admitted-Finance | -16.21% | ₹37.6 L+₹2.6 L (7.56%) | L5 | Admitted-Finance |
Tender Value
₹44.9 L
EMD Value
₹89,800
Closing Date
8 Aug 2026, 6:00 pmClosed
EXECUTIVE ENIGNEER VIDHYADHAR NAGAR ZONE
JAIPUR NAGAR NIGAM PANDIT DEENDAYAL UPPADHYAY BHAWAN LALKOTHI TONK ROAD JAIPUR
CONSTRUCTION WORK OF NEW SEWER LINE AND C.C. ROAD IN TRIVENI DHAM COLONY IN WARD NO. 17 OF VIDYADHAR NAGAR ZONE.
2026_DLB_578517_1
15 EXECUTIVE ENIGNEER VIDHYADHAR NAGAR ZONE
Open Tender
Civil Works
Percentage
180 days
JAIPUR
As Per Bid Documents
3 documents required · 3 mandatory
₹590
ONLINE PAY IN JAIPURMC WEBSITE
₹89,800
Yes
12 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
8 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (17.1.1.1) Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 450 | CUM | 299 | ₹1,34,550 |
| 2 | (17.1.1.2) Add extra for over all depth of excavation above 1.5 m and upto 3.0 m over item no 1 | 450 | cum | 319.9 | ₹1,43,955 |
| 3 | (1.1.1) Carriage of materials by mechanical transport of earth Including loading, unloading and stacking::Earth upto 10 Km. | 1,411.5 | CUM | 356.36 | ₹5,03,002.14 |
| 4 | (17.3.1) Providing and fixing CLOSE timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered) for following depth below NGL. Depth upto 3.0 m | 2,000 | SQM | 142.5 | ₹2,85,000 |
| 5 | (17.19.2) Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP3 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately | 200 | metre | 597 | ₹1,19,400 |
| 6 | () Providing and laying plain cement concrete M15 grade (using mechanical concrete mixer) using 20mm graded hard crusher broken stone aggregate, laying in layers of not more than 15cm thick, for bedding having width = outer dia of pipe (Bc) + 200mm or 1.25Bc (whichever is higher), thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.25Bc, for all type of pipes of following sizes, including compaction, curing, form work, etc complete as per drawing and/ or as directed by Engineer. | 200 | metre | 335 | ₹67,000 |
| 7 | (17.60.1) Providing, fixing and constructing of pre- ast RCC M-40 grade circular manholes with internal dia 1.2m and up to pecified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.86m, height 0.20m), conical piece (top ID 0.56m, bottom ID 1.2m, vertical height 0.805m, wall thickness 125mm), and circular rings of required heights (ID 1.2m, height 150/ 300/ 600/ 900mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in all pieces of manhole @ not less than 80 kg per cum of concrete, including cast in-situ PCC M-10 grade (1:3:6) foundation of 1.825m dia and 150mm thickness, PCC M15 grade circular wall ID 1.125m, wall thickness 200mm, height equal to OD of sewer pipe +50mm, PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic ncapsulated CI/MS foot steps, including cost of shuttering, steel reinforcement, testing for water tightness etc complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately.
Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 1.005), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 1.125m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness o pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + increased height of wall (if any) + 50mm) | 20 | each | 17,800 | ₹3,56,000 |
| 8 | (17.60.2) Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.2m, wall thickness 125mm, height 150/225/300/600/900mm for constructing extra depth of manhole beyond depth mentioned in item no-17.60.1 as per drawing. | 37 | metre | 7,810 | ₹2,88,970 |
| 9 | (4.25) Providing Barricading for Trenches using 80 - 100 mm dia Wooden Ballies as vertical post, atleast 1.5m above ground level and atleast 30-45 cm below ground level at a spacing of 3 m. Two rows of PVC Tape (preferabley red in colour) strip barricading horizontal strip securely tied by the vertical members. Vertical members shall be painted in red and white colour. Rate is inclusive removal and cleaning of site complete in all respect. | 400 | mt | 113.5 | ₹45,400 |
| 10 | (17.69) Providing and making connection to the manhole/ road side chamber/ property chamber by cutting hole in wall, making good the same with brick work/ stone masonry work in cement mortar 1:4, plaster in cement mortar 1:3, encasement of pipe at manhole with 75mm thick M15 grade concrete etc complete as directed by Engineer. | 80 | each | 999 | ₹79,920 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1028297.xls
BOQ • 0.35 MB
EPROC15XENVDZ.pdf
Tender Documents • 5.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .