RequiredExperience with Government
RequiredAnnual Turnover
RequiredOEM Authorization Certificate
RequiredOEM Annual Turnover Bid to RA enabled No Atomic Absorption Spectrophotometer Aas ( 1 pieces ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) TYPE Type of Atomic Absorption Spectrometer (AAS) Double beam Double beam Monochromator type Holographic grating Holographic grating Detector Type Photodiode Photo Multiplier Tube (PMT)
RequiredPhotodiode
Required1/6 CMOS
RequiredDiode array SPECTRAL Source Wavelength - Minimum 190 185.0
Required190.0 Source Wavelength - Maximum 850 850.0 Accuracy (+/-) 0.01 0.01 Repeatability 0.05 0.05 Diffraction grating (lines/mm) 1800 1800 Wavelength setting and scanning Automatic Automatic Slit width Adjustment Automatic Automatic Slit width range(nm) 0.1 - 2.0 * Resolution (nm/mm) 0.1 * Bandwidth (nm) 0.1 - 3.0 0.1 - 3.0 Focal length (mm) 300 and above 300 and above LIGHT SOURCE Light Source Hollow Cathode Lamp (HCL) * Type of HCL Both Single and Mulitiple Element Both Single and Mulitiple Element Number of Single element HCLs supplied (inclusive in the scope of supply) N/A * Number of multiple element (alloy) HCLs supplied (inclusive in the scope of supply) N/A 1
Required2
Required3
Required4
Required5
RequiredN/A Measuring modes (K factor and standards) Absorbance Transmittance
RequiredAbsorbance
RequiredConcentration (Wavelength
Requiredtime)
RequiredEmission Detectable Elements using single element HCL N/A * Detectable Elements using multi element HCL Na-K * Measurement level ppm level * Lifespan of Single element lamp (mA- Hr) 8000 500
Required1000
Required2000
Required3000
Required4000
Required5000
Required6000
Required7000
Required8000
RequiredN/A Lifespan of multi- element/Alloys lamp 8000 500
Required1000
Required2000
Required3000
Required4000
Required5000
Required6000
Required2/6 (mA-Hr) 7000
Required8000
RequiredN/A Number of sockets on Turret 8 1
Required2
Required4
Required6
Required8 ATOMIZER Type of atomizer Integrated Flame Burner & GF Flame Burner
RequiredElectro thermal (Graphite furnace)
RequiredIntegrated Flame Burner & GF Nebulizer Fritted disk Pneumatic nebulizer concentric tube
RequiredPneumatic nebulizer cross flow
RequiredFritted disk
RequiredBabington
RequiredUltrasonic
RequiredElectro thermal vaporizer
RequiredPt/Ir nebulizer Background Correction Hi-speed reversal method D2 Lamp method
RequiredZeeman background correction
RequiredHi-speed reversal method Flame and furnace change over switch Automatic * Burner diameter (mm) 50 50
Required100
RequiredN/A Coolant Liquid type * Sample volume 99.99 * Corrosion resistant Chamber Yes * Adjustable aerosol based nebulizer flow No * Furnace heating range (Degree celcius) N/A (For burner type) * Time for analysis (sample) 1190 10 - 1200 GENERIC Display inbuilt display inbuilt display
Requiredthrough PC Display type LCD touchscreen LCD with Backlight
RequiredLED
RequiredLCD touchscreen
RequiredTFT
RequiredNA Test result printing Through external printer Through inbuilt Printer
RequiredThrough external printer If inbuilt printer
RequiredType of printer Color laser Thermal printer
RequiredDot matrix
RequiredLaser b/w
RequiredInkjet b/w
RequiredColor laser
RequiredColor inkjet
RequiredN/A Connectivity USB * Safety sensors Power failure protection Pressure sensor
RequiredFlame Sensor
RequiredFlame Ignition 3/6 Sensor
RequiredBurner interlock
RequiredN/A
RequiredPower failure protection
RequiredNebulizer Sensor
RequiredAuto ignition Burner movement (lateral
Requiredhorizontal & height) Automatic Automatic
RequiredMannual
RequiredN/A POWER SOURCE Power Supply 230 V A.C ± 10%
Required50 Hz * OPERATING CONDITIONS Minimum Operating Temperature -5 -5
Required-10
Required0
Required5
Required10
Required15 Maximum Operating Temperature 60 35
Required45
Required50
Required55
Required60 Operating Humidity (RH) (%) at 40 degree c 90 80
Required85
Required90
Required95 ACCESSORIES Type of gas cylinders N/A Acetylene
RequiredNitrous oxide
RequiredN/A Type of Regulators supplied NA With Heater
RequiredWithout Heater
RequiredNA Number of Regulators Supplied (inclusive in the scope of supply) 0 0
Required1
Required2
Required3
Required4 Number of Acetylene Cylinders supplied (inclusive in the scope of supply) 0 0
Required1
Required2
Required3
Required4 Capacity of each Acetylene cylinder (Litres) N/A 5
Required10
Required20
Required40
Required47
Required50
RequiredN/A Number of Nitrous oxide Cylinders supplied (inclusive in the scope of supply) 0 0
Required1
Required2
Required3
Required4 Capacity of each Nitrous oxide cylinder (Litres) N/A 5
Required10
Required20
Required40
Required47
Required50
RequiredN/A Gas cylinders confirming to N/A * Gas cylinders having PESO certificate N/A Yes
RequiredN/A Other accessories (inclusive in the scope of supply) Schematic diagram and instruction manual Gas flow control box
RequiredOil Moisture Filters
RequiredSS Exhaust fume hood with blower
RequiredSchematic diagram and instruction manual
RequiredHydride generator
Required4/6 Auto sampler
RequiredN/A Suitable software for connecting PC & Printer (inclusive in the scope of supply) Yes Yes
RequiredN/A Any other features/accesories covered in scope of supply - * WARRANTY AVAILABILITY OF SPARES warranty (Year) 1 1
Required2
Required3
Required4
Required5 Spares and Consumables inclusive in the scope of supply No Yes
RequiredNo List of Items and Quantity of each item included in the offer - * CERTIFICATION Availability of UL/CE Certification as per EN 61010-1:2010 Safety requirements for electrical equipment for measurement
Requiredcontrol
Requiredand laboratory use General requirements Yes Yes
RequiredNo Conformance to EMC/EMI as per EN 61326-1:2013 Electrical equipment for measurement
Requiredcontrol and laboratory use Yes Yes
RequiredNo Availability of Test Reports from Central Govt/NABL approved/ILAC accredited Lab to prove conformity to the specification No Yes
RequiredNo If yes test report to furnished
Requiredto the buyer on demand N/A * * Bold specifications are the golden parameters. * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer.