Tender Value
₹9.1 L
EMD Value
₹18,200
Closing Date
25 May 2026, 10:30 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
45 days
Expenditure
Capital (Works)
Above/Below/Par
GENERAL
58 conditions · 8 needing a document upload
The successful bidder shall submit the Performance Guarantee (PG) in any of the following forms, amounting to 5% of the original contract value and Additional Performance Guarantee as per Clause 16(4)(h) of GCC-2022, in any of the following forms:- (i) A deposit of Cash; (ii) Irrevocable Bank Guarantee; (iii)Government Securities including State Loan Bonds at 5% below the market value; (iv) Pay Orders and Demand Drafts tendered by any Scheduled Commercial Bank of India; (v) Guarantee Bonds executed or Deposits Receipts tendered by any Scheduled Commercial Bank of India; (vi) Deposit in the Post Office Saving Bank; (vii) Deposit in the National Savings Certificates; (viii) Twelve years National Defence Certificates; (ix) Ten years Defence Deposits; (x) National Defence Bonds and (xi) Unit Trust Certificates at 5% below market value or at the face value whichever is less. Also, FDR in favour of FA&CAO (free from any encumbrance) may be accepted. New Para 16(4) (h) of Part-II of GCC'22: If a tender is accepted on the quoted rates of bidder which is below the advertised tender value, an additional performance security shall be submitted by the bidder as below: (i) If Bid quoted in % of advertised cost is Below 0 - 5% (inclusive), Additional Performance Guarantee (%) will be 'Nil'. (ii) If Bid quoted in % of advertised cost is Below 5%, Additional Performance Guarantee (%) will be '5%.
The Performance Guarantee shall be submitted by the successful bidder after the Letter of Acceptance (LOA) has been issued, but before signing of the contract agreement. This P.G. shall be initially valid upto the stipulated date of completion plus 60 days beyond that. In case, the time for completion of work gets extended, the Contractor shall get the validity of P.G. extended to cover such extended time for completion of work plus 60 days.
Performance Guarantee : The successful bidder shall have to submit a Performance Guarantee (PG) within 21 (Twenty one) days from the date of issue of Letter of Acceptance (LOA). Extension of time for submission of PG beyond 21 (Twenty one) days and upto 60 days from the date of issue of LOA may be given by the Authority who is competent to sign the contract agreement. However, a penal interest of 12% per annum shall be charged for the delay beyond 21(Twenty one) days, i.e. from 22ndday after the date of issue of LOA. Further, if the 60thday happens to be a declared holiday in the concerned office of the Railway, submission of PG can be accepted on the next working day. In all other cases, if the Contractor fails to submit the requisite PG even after 60 days from the date of issue of LOA, the contract is liable to be terminated. In case contract is terminated railway shall be entitled to forfeit Bid Security and other dues payable to the contractor against that particular contract, subject to maximum of PG amount. In case a tenderer has not submitted Bid Security on the strength of their registration as a Startup recognized by Department of Industrial Policy and Promotion (DIPP) under Ministry of Commerce and Industry, DIPP shall be informed to this effect. The failed Contractor shall be debarred from participating in re-tender for that work. However the clause may also applicable as amended time to time.
The value of PG to be submitted by the Contractor is based on original contract value and shall not change due to subsequent variation(s) in the original contract value.
The Performance Guarantee (PG) shall be released after physical completion of the work based on 'Completion Certificate' issued by the competent authority stating that the Contractor has completed the work in all respects satisfactorily. The Security Deposit shall, however, be released only after expiry of the maintenance period and after passing the final bill based on No Claim Certificate from the contractor.
The value of PG to be submitted by the Contractor is based on original contract value and shall not change due to subsequent variation(s) in the original contract value.
Whenever the contract is rescinded, the Security Deposit shall be forfeited and the Performance Guarantee shall be encashed. The balance work shall begot done independently without risk cost of the failed contractor. The failed contractor shall be debarred from participating in the tender for executing the balance work. If the failed contractor is a JV or a Partnership firm,then every member/partner of such a firm shall be debarred from participating in the tender for the balance work in his/her individual capacity or as a partner of any other JV/partnership firm.
SFMS (Structured Financial Messaging System) and shall invariably send the advice of this Bank Guarantee to the following bank details - IFSC CODE - SBIN000RAIL IFSC TYPE - BRANCH BANK NAME - STATE BANK OF INDIA BRANCH NAME - RAIL CITY NAME - NAVI MUMBAI ADDRESS - SECTOR-11, CBD BELAPUR, NAVI MUMBAI DISTRICT - NAVI MUMBAI STATE - MAHARASHTRA BG ENABLED - YES
"Bid Security: (1) (a) The tenderer shall be required to submit the Bid Security with the tender for the due performance with the stipulation to keep the offer open till such date as specified in the tender, under the conditions of tender. The Bid Security shall be as under: Value of the Work and Bid Security : For all works, 2% of the estimated cost of the work. Note: (i) The Bid Security shall be rounded off to the nearest 100. This Bid Security shall be applicable for all modes of tendering. (ii) Any firm recognized by Department of Industrial Policy and Promotion (DIPP) as 'Startups' shall be exempted from payment of Bid Security detailed above. (iii) Labour Cooperative Societies shall submit only 50% of above Bid Security detailed above. (b) It shall be understood that the tender documents have been issued to the tenderer and the tenderer is permitted to tender in consideration of stipulation on his part, that after submitting his tender he will not resile from his offer or modify the terms and conditions thereof in a manner not acceptable to the Engineer. Should the tenderer fail to observe or comply with the said stipulation, the aforesaid amount shall be liable to be forfeited to the Railway. (c) If his tender is accepted, this Bid Security mentioned in sub para (a) above will be retained as part security for the due and faithful fulfillment of the contract in terms of Clause 16 of the Standard General Conditions of Contract. The Bid Security of other Tenderers shall, save as herein before provided, be returned to them, but the Railway shall not be responsible for any loss or depreciation that may happen thereto while in their possession, nor be liable to pay interest thereon.
The Bid Security shall be deposited either in cash through epayment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90days beyond the bid validity period. In case, submission of Bid Security in the form of Bank Guarantee, following shall be ensured: i. A scanned copy of the Bank Guarantee shall be uploaded on e-Procurement Portal (IREPS) while applying to the tender. ii. The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (Le. excluding the last date of submission of bids) . iii. Non submission of scanned copy of Bank Guarantee with the bid on e-tendering portal (IREPS) and/or non submission of original Bank Guarantee within the specified period shall lead to summary rejection of bid. iv. The Tender Security shall remain valid for a period of 90 days beyond the validity period for the Tender. v. The details of the BG, physically submitted should match with the details available in the scanned copy and the data entered during bid submission time, failing which the bid will be rejected vi. The Bank Guarantee shall be placed in an envelope, which shall be sealed. The envelope shall clearly bear the identification "Bid for the ***** Project" and shall clearly indicate the name and address of the Bidder. In addition, the Bid Due Date should be indicated on the right hand top corner of the envelope. vii. The envelope shall be addressed to the officer and address as mentioned in the tender document. viii. If the envelope is not sealed and marked as instructed above, the Railway assumes no responsibility for the misplacement or premature opening of the contents of the Bid submitted and consequent losses, if any, suffered by the Bidder.
Mandate form should be uploaded as per attached format in document tab.
GST : Tenderer has to fulfill GST Compliance as per Govt. norms
Tenderer may upload GST registration number and certificate
PAN Card: Tenderers are required to upload their Permanent Account Number (PAN) card
Declaration of proprietorship/partnership firm and necessary document should be submitted along with tender
Contact details of tenderer: The Contractor shall submit their complete official address, e-mail address, telephone no., mobile no. and fax no. so that necessary communication can be made by the Railways as and when required
Employment/Partnership etc. of Retired Railway Employees: Detailed vide para 16 of Annexure-I of GCC 2022.
Employment/Partnership etc. of Retired Railway Employees: (a) Should a tenderer i) be a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, whether in the executive or administrative capacity or whether holding a pensionable post or not, in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, OR ii) being partnership firm / joint venture (JV) / registered society / registered trust etc have as one of its partners a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, OR iii) being an incorporated company have any such retired Engineer of the gazetted rank or any other gazetted officer working before his retirement as one of its directors AND in case where such Engineer or officer had not retired from government service at least 1 year prior to the date of submission of the tender THEN the tenderer will give full information as to the date of retirement of such Engineer or gazetted officer from the said service and as to whether permission for taking such contract, or if the Contractor be a partnership firm or an incorporated company, to become a partner or director as the case may be, has been obtained by the tenderer or the Engineer or officer, as the case may be from the President of India or any officer, duly authorized by him in this behalf, shall be clearly stated in writing at the time of submitting the tender. b) In case, upon successful award of contract, should a tenderer depute for execution of the works under or to deal matters related with this contract, any retired Engineer of gazette rank or retired gazetted officer working before his retirement in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, and now in his employment, then the tenderer will ensure that retired Engineer or retired gazetted officer had retired from government service at least 1 year prior to the date of his employment with tenderer and in case he had retired from service within a year then he possesses the requisite permission from the President of India or any officer, duly authorized by him in this behalf, to get associated with the tenderer . c) Should a tenderer or Contractor being an individual, have member(s) of his family or in the case of partnership firm/ company / joint venture (JV) / registered society / registered trust etc. one or more of partners(s)/shareholder(s) or member(s) of the family of partner(s)/ shareholder(s) having share of more than 1% in the tendering entity employed in gazetted capacity in the Engineering or any other department of the railway, then the tenderer at the time of submission of tender, will inform the authority inviting tenders the details of such persons. If information as required as per 16.a), b), c) above has not been furnished, contract is liable to be dealt in accordance with provision of clause 62 of Standard General Condition of contract. Format for declaration in this regard is attached with the tender document. ( Click here to download Format)
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
@ 18% GST has been included in schedule rate, GST will be paid to the firm's at the time of billing, subjected to firm's production of sufficient documentary evidences in support of same. NOTE: % of GST as applicable during the period of execution.
Inspection charges of RITES / Third Party Inspection (TPI) Agencies are to be borne by the contractor where necessary as per extent rule (where the value of purchase order exceeds Rs. 5 lakhs)
The work shall be treated as on work contract basis and the rates tendered shall be for complete items of work (except the materials, if any, stipulated for supply by the department) inclusive of all taxes (including works contract tax,if any duties, and levies etc and all charges for items contingent to the work, such as packing, forwarding, insurance, freight and delivery at site for the materials to the supplied by the contractor, watch and ward of all materials (including those if any supplied by the department) for the work at site etc.)
Unless and otherwise mentioned in the tender documents, the following works shall be done by the contractor, and therefore their cost shall be deemed to be included in their tendered cost- i)Foundations for equipments and components where required, including foundation bolts. ii)Cutting and making good all damages caused during installation and restoring the same to their original finish. iii)Sealing of all floor openings provided by him for pipes and cables, from fire safety point of view, after laying of the same. iv)Painting at site of all exposed metal surfaces of the installation other than pre-painted items like fittings , fans, switchgear/distribution gear items, cubicle switch board etc. Damages to finished surfaces of these items while handling and erection, shall however be rectified to the satisfaction of the Engineer-in-charge. v)Testing and commissioning of complete installation
Unless and otherwise specified, power supply and water supply will be arranged by the contractor at the site for installation purpose. However, for testing purpose, electricity supply will be available free of cost to the contractor. Contractor will take due care to ensure safety of electrical installation during execution of work
The contractor shall co-ordinate with all other agencies involved in the building work is not hampered due to delay in his work. Recessed conduit and other works, which directly affect the progress of building work, should be given priority.
Tools for Handling and Erection All tools and tackles required for handling of equipments and materials at site of work as well as for their assembly and erection and also necessary test instruments shall be the responsibility of the contractor
Care of Buildings: Care shall be taken by the contractor to avoid damage to the building during execution of his part of the work. He shall be responsible for repairing all damages and restoring the same to their original finish at his cost. He shall also remove at his cost all unwanted and waste materials arising out of his work from the site.
Structural Alterations to Buildings: (i) No structural member in the building shall be damaged/altered, without prior approval from the competent authority through the Engineer-in-charge. (ii) Structural provisions like openings, cutouts, if any, provided by the department for the work, shall be used. Where these require modifications, or where fresh provisions are required to be made, such contingent works shall be carried out by the contractor at his cost. (iii) All such openings in floors provided by the Department shall be closed by the contractor after installing the cables/ conduits/ rising mains etc. as the case may be, by any suitable means as approved by the Engineer-in-charge without any extra payment. (iv) All chases required in connection with the electrical works shall be provided and filled by the contractor at his own cost to the original architectural finish of the buildings
Addition to an Installation: Any addition temporary or permanent to the existing electrical installation shall not be made without a properly worked out scheme/ design by a qualified Electrical Engineer to ensure that such addition does not lead to overloading, safety violation of the existing system.
Work in Occupied Buildings: (i) When work is executed in occupied buildings, there would be minimum of inconvenience to the occupants. The work shall be programmed in consultation with the Engineer-in-charge and the occupying department. If so required, the work may have to be done even before and after office hours. (ii) The contractor shall be responsible to abide by the regulations or restrictions set in regard to entry into, and movement within the premises. (iii) The contractor shall not tamper with any of the existing installations including their switching operations or connections thereto without specific approval from the Engineer-in-charge.
Conformity to IE Act, IE Rules, and Standards: All Electrical works shall be carried out in accordance with the provisions of Indian Electricity Act, 2003 and Indian Electricity Rules, 1956 amended up to date and As per RDSO specification
Quality of Materials: All materials and equipments supplied by the contractor shall be new. They shall be of such design, size and materials as to satisfactorily function under the rated conditions of operation and to withstand the environmental conditions at site
Inspection of Materials and Equipments: Materials and equipments to be used in the work shall be inspected by the Departmental officers. Such inspection will be of following categories: (i) Inspection of materials/ equipments to be witnessed at the manufacturer's premises in accordance with relevant BIS/ Agreement Inspection Procedure. (ii) To receive materials at site with Manufacturer's Test Certificate(s). (iii) To inspect materials at the Authorized Dealer's Godowns to ensure delivery of genuine materials at site. (iv) To receive materials after physical inspection at site. The Departmental officers will take adequate care to ensure that only tested and genuine materials of proper quality are used in work. Similarly, for fabricated equipments, the contractor will first submit dimensional detailed drawings for approval before fabrication is taken up in the factory. Suitable stage inspection at factory also will be made to ensure proper use of materials, workmanship and quality control. The tender specifications will stipulate the inspection requirements or their waiver for various materials/ equipments including norms of inspection in specific cases
Ratings of Components: All components in a wiring installation shall be of appropriate ratings of voltage, current, and frequency, as required at the respective sections of the electrical installation in which they are used. All conductors, switches and accessories shall be of such size as to be capable of carrying the maximum current, which will normally flow through them, without their respective ratings being exceeded
Conformity to Standards: All components shall conform to relevant Indian Standard Specifications, wherever existing. Materials with ISI certification mark shall be preferred. A broad list of relevant Indian Standards is given in Appendix D. These Indian Standards, including amendments or revisions thereof upto the date of tender acceptance, shall be applicable in the respective contracts
Only quality materials of reputed make as specified in the tender will be used in work.
Testing: All tests, to be done before, during and after installation, shall be carried out, and the test results shall be submitted to the Engineer-in-charge in prescribed Performa, forming part of the Completion Certificate
Commissioning on Completion: After the work is completed, it shall be ensured that the installation is tested and commissioned
Shramikkalyan portal:- (i) Contractor is to abide by the provisions of various labour laws in terms of above clause 54,55, 55-A and 55-B of Indian Railways Standard General Conditions of Contract. In order to ensure the same, an application has been developed and hosted on website 'www.shramikkalyan.indianrailways.gov.in'. Contractor shall register his firm/company etc. and upload requisite details of labour and their payment inthis portal. These details shallbe available in public domain. The registration /updation in Portal shall be done as under: (a)Contractor shall apply for one time registration of his company/firm etc. in the Shramikkalyan portal with requisite details subsequent to issue of Letter of Acceptance. Engineer shall approve the contractor's registration in the portal within 7 days of receipt of such request. (b)Contractor once approved by any Engineer, can create password with login ID (PAN No.) for subsequent use of portal for all Letter of Acceptances (LoAs)issued in his favour. (c)The contractor once registered on the portal, shall provide details of his Letter of Acceptances (LoAs)/ Contract Agreements on shramikkalyan portal within 15 days of issue of any LoA for approval of concerned Engineer. Engineer shall update (if required) and approve the details of LoA filled by contractor within 7 days of receipt of such request. (d)After approval of LoA by Engineer, contractor shall fill the salient details of contract labours engaged in the contract and ensure updating ofeach wage payment to them on shramikkalyan portal on monthly basis. (e)It shall be mandatory upon the contractor to ensure correct and prompt uploading of all salient details of engaged contractual labour & payments made thereof after each wage period. (ii)While processing payment of any'On Account Bill' or 'Final Bill' or release of 'Advances' or 'Performance Guarantee / Security deposit', contractor shall submit a certificate to the Engineer or Engineer's representatives that "I have uploaded the correct details of contract labours engaged in connection with this contract and payments made to them during the wage period in Railway's Shramikkalyan portal at 'www.shramikkalyan.indianrailways.gov.in' till____Month,____Year.
Please read the Explanatory note for detail description of work, their make etc and all other attached documents before submission of Tender.
Any other reputed make/ brand other than as mentioned in the explanatory note may be included during the execution of the works on an urgent basis/as per direction when needed with approval of competent authority.
Electrical work for Fire Hydrant system at newly constructed stores Godown under AMM/Coaching/Santragachi
Elect-Chg-25-26-AMMPUMP
Elect-Chg-25-26-AMMPUMP
Open
Works - General
12 Months
Howrah, West Bengal
₹0
₹18,200
25 May 2026
28 Apr 2026
11 May 2026
81 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 9,11,102.82 | ||
| — | 2.00 | — | — | ||
| "Supply of LED 45 watt or higher wattage street light The Luminaires casing/housing (single piece housing) shall be pressure die casted aluminium alloy with higher thermal conductivity, The luminaire body must be corrosion resistant powder coated Heat sink should be diecast aluminium along with sufficient heat sink with high power LED with lens and driver including wiring of light from loop box.. IP65/IP66. | — | — | — | 3,110 | |
| — | 2.00 | — | — | ||
| Fixing and commissioning of LED 45 watt or higher wattage street light including wiring of light from loop box. | — | — | — | 522.7 | |
| — | 10.00 | — | — | ||
| "Supply of Industrial High bay Flood light 200 watt, 5500 lumens or more outputs, 5500 kelvin or more. , The luminaire body must be corrosion resistant powder coated Heat sink should be diecast aluminium along with sufficient heat sink with high power LED with lens and driver including wiring of light from loop box.. IP65/IP66 | — | — | — | 59,495 | |
| — | 10.00 | — | — | ||
| Fixing of Industrial High bay Flood light with all accessories. | — | — | — | 5,949.8 | |
| — | 10.00 | — | — | ||
| Supply of BLDC CEILLING FAN with regulator/Remote WITH 5 STAR and above RATING 1400 mm size , down rod etc., suitable for 230V, 50Hz, AC supply as per site requirement. | — | — | — | 32,000 | |
| — | 10.00 | — | — | ||
| Fixing and commissioning of Ceiling fan with regulator, 1400 mm down rod etc., suitable for 230V, 50Hz, AC supply confirming to Class:I of IS: 374/latest. Fixing of the fan shall be done with suitable clamp, hook, nut/bolts etc. and connection with flexible twin twisted multistrand Copper wire of 0.75 Sq.mm and removing of the existing old fan (if any) and handing over of the same to Railway Store with clear acknowledgement, as per site requirement. | — | — | — | 1,069.8 | |
| — | 2.00 | — | — | ||
| "Supply of concealed PC Board consisting with 03 nos switch socket unit 06 Amps capacity with indicator lamp and internal wiring.with 8M GI Box size 6X4 inch or as per site condition. | — | — | — | 432.68 | |
| — | 2.00 | — | — | ||
| Fixing and commissi- oning of concealed PC Board consisting with 03 nos switch socket unit 06 Amps capacity with indicator lamp and internal wiring.with 8M GI Box size 5X5 inch. | — | — | — | 51.02 | |
| — | 4.00 | — | — | ||
| "Supply of 3 modular plate and metal box with 6A/16A twin socket Shutter type and 16 or 20A switch. All item will be modular type and separate (as per PCEE specification no.CEE/P/56/301/MAINTENANCE, Dtd. 17/11/2022.) | — | — | — | 1,820 | |
| — | 4.00 | — | — | ||
| Fixing and commissioning of 3 modular plate and metal box with 6A/16A twin socket Shutter type and 16 or 20A switch. All item will be modular type and seperate. (Wiring will be covered under Shedule item No. as per site requirement). | — | — | — | 134.04 | |
| — | 2.00 | — | — | ||
| "Supply,Fixng and Commissioning of Analog Time Switches 3 module for Tower Light, Pump Installations & Street Light Circuits etc. Floor/Panel/Tower/Wall mounted ,Supply Voltage 240V AC,50/60HZ,with DP 25A power contractor with oveload protection - 1 Nos.and 20A,10kA DP MCB- 01no , timer switch,suitable for auto/manual operation with SS enclosure , indicator with protection for timer, with terminal stud connector 60-63A -2 Nos and proper wiring to complete job. | — | — | — | 24,600 | |
| — | 4.00 | — | — | ||
| " Supply, Installation Testing and commissioning of integrated Supply of 40 Wp Integrated Solar Street Light Model III, Battery capacity 160 Wh for Model III Light sourceWhite LED, 7 W (Max.) Height of pole 5 meters above the ground level Material of battery box for housing the battery Acid proof and corrosion resistant Metallic box conforming to IP65 and IK08 Protection, including Pole & accessories.Minimum Light output (when measured at the periphery of 4 meter diameter from a height of 4 meter) 16 LUX Colour temperature of white LED (in deg. K) 5500 to 6500 .Warranty period for lighting system (including the battery) from the date of supply (in Years) 5 Minimum warranty period for PV Modules (in Years) 25." | — | — | — | 1,40,000 | |
| — | 100.00 | — | — | ||
| Supply of L.T. Aluminium Armoured LT XLPE cable of size 4Core x 35 Sq mm 1100 Volts Grade. IS No. 7098-Part-1, 1988, with amendment No. 1 and 2 and 3 reaffirmed 2005. | — | — | — | 32,600 | |
| — | 60.00 | — | — | ||
| Laying of cable / cables in under ground along the road through cable trench etc . as per standard drawing including necessary termination , connection and testing.Trenching and laying of U/G cables in any kind of soil trench of size minimum 0.40 mtr wide and 1 mtr deep covered with necessary bricks for protection of the cables including filling of space between brick and cable/cables with sand and refilling the trench with excavated soil, leveling up, and restoring the surface duly rammed. | — | — | — | 7,837.8 | |
| — | 30.00 | — | — | ||
| Laying of cable / cables across the road, track, drain etc through RCC/GI pipe confirming to IS standard of size 100mm or 150mm (or any suitable size as per field requirement based on the actual size of the cable) as per relevant specification and as per standard drawing with necessary termination, connections and testing .Cost also includes collection of cable/cables from Railway store if required.GI pipe will be supplied by contractor. | — | — | — | 8,970.6 | |
| — | 10.00 | — | — | ||
| Laying of cable/ cables on wall / structure through PVC casing pipe of size 4inches or 3inches with accessories or as per site requirement with suitable clamp / saddle/ fixtures etc with necessary termination, connection and testing as per standard drawing.Cost also includes collection of cable/cables from Railway store if required. | — | — | — | 898.3 | |
| — | 2.00 | — | — | ||
| "Supply of Three Phase Energy Efficient Submersible pump & motor, Capacity: 9.30 KW , Motor Capacity: 12.5 HP, 3Ph,415V AC, Head-100Mtr or above Discharge capacity (LPH) 3.33 or above Speed:- 2880RPM or above Pump Conforms to IS:8034 or latest Motor Conforms to IS:9283 or latest with 3mtrs flat cable, suitable size of pump guard, non-returning valve, reducer and other material required for successfull installation of submersible pump. | — | — | — | 99,000 | |
| — | 2.00 | — | — | ||
| "Supply of 20 HP Starters Control Panel for Submersible Pump (FULLY AUTOMATIC STAR DELTA OIL IMMERSED SUBMERSIBLE CONTROL panel) in Sheet-Steel Enclosure with Contactor Rating Current(A) 40 A, single phase preventer relay and in-built auto Star-Delta Timer , Voltmeter & ammeter with rotary switch for 3 Ph. 415V Motor, as per IS standard. | — | — | — | 24,400 | |
| — | 600.00 | — | — | ||
| "Supply of Submersible flat cable of size 3core 6.00 Sq.mm PVC Insulated & PVC Sheathed Copper(EC grade) Conductor multistrand flexible Copper Conductor FOR Submersible Pumps (FOR MAXIMUM CONDUCTOR TEMPERATURE 70°C OR 85°C) duly ISI marked to IS:694 latest | — | — | — | 1,38,546 | |
| — | 30.00 | — | — | ||
| "Supply of 63 MM UPVC PRESSURE PIPE or as per site and size requirement for the above mentioned Submersible Pump,Class 3 (0.6MPa), Conforming to Indian standard IS 4985 or Latest with ISI MARK, Length (meter) :3/pipe .suitable for pump and motor etc. | — | — | — | 48,000 | |
| — | 2.00 | — | — | ||
| Supply of hand operated valve or Intek Valve made of Cast Iron of appropriate size as per site requirement for the above mentioned Submersible Pump 63mm), Conforming to IndianStandard IS 9890 or latest . | — | — | — | 3,930.42 | |
| — | 800.00 | — | — | ||
| Supply of nylon rope 25 mm dia or as per site and size requirement for the Submersible Pump, Conforming To Indian Standard IS 4572: 2014 (Latest). | — | — | — | 6,296 | |
| — | 2.00 | — | — | ||
| Lowering, complete installation and commissioning of item no. 1-6 for 02 nos Deep tube wells with suitable size of clamp set, nut bolt etc to complete job for 02 nos Deep tube wells with suplly ,fixing and commissioning of UPVC pipe clamp with bolt nut system of IS standard and any Indian make. | — | — | — | 20,683.48 | |
| — | 2.00 | — | — | ||
| Supply of belt type Strap Wrench for use for fixing and removing of PVC pipe. Strong, woven nylon strap gives tight grip. Make: Any IS approved. | — | — | — | 1,086 | |
| — | 1.00 | — | — | ||
| Supply of Panel consisting of Supply , testing of LT Panel consist of 1 No. 125 Amp 36 kA FP MCCB as a incoming, 02 Nos 63 Amp, FP MCCB as a outgoing and 32 A DP MCB -07 Nos as a outgoing with cable termination. | — | — | — | 53,100 | |
| — | 1.00 | — | — | ||
| Fixing and Commisioning of Panel consisting of 1 No. 125 Amp 36 kA FP MCCB as a incoming, 02 Nos 63 Amp, FP MCCB as a outgoing and 32 A DP MCB -07 Nos as a outgoing with cable termination. | — | — | — | 2,655 | |
| — | 1.00 | — | — | ||
| "Supply of VTPN 4-way moduler DB (Metal Door) consisting with FP 63A MCCB-1 no as incoming and DP 32 A,10kA MCB -6 nos, DP 16 A,10kA MCB -6 nos as outgoing with Cu.bus-bar, Neutral links and Earth bar etc.,all product will be moduler type. | — | — | — | 19,825 | |
| — | 1.00 | — | — | ||
| Fixing and Commisioning of VTPN 4-way moduler DB (Metal Door) consisting with FP 63A MCCB-1 no as incoming and DP 32 A,10kA MCB -6 nos, DP 16 A,10kA MCB -6 nos as outgoing with Cu.bus-bar, Neutral links and Earth bar etc.,all product will be moduler type. | — | — | — | 643.91 | |
| — | 1.00 | — | — | ||
| "Supply of FP 100 Amps,25kA MCCB ( Microprossesor based) with sheet steel powder painted enclosure. | — | — | — | 14,097 | |
| — | 1.00 | — | — | ||
| Fixing and commissioning of FP 100 Amps,25kA MCCB ( Microprossesor based) with sheet steel powder painted enclosure with cable and necessary item as per site requirement to complete job. | — | — | — | 686.47 | |
| — | 5.00 | — | — | ||
| "Supply of Cable Junction Boxes of size (Box Dimensions LXBXH in mm) 450x375x200 mm or higher IP 65 with metric knockouts for cable entry with 3-Phase in- coming and out going connection consists of 3-Phase and neutral terminal and 15 Amps K-fuse as per relevant ISS, with suitable bridge arrange- ment with 4nos copper bus bar of 63A capacity and all necessary accessories. | — | — | — | 13,865 | |
| — | 5.00 | — | — | ||
| Fixing and commissioning of of Cable Junction Boxes of size (Box Dimensions LXBXH in mm) 450x375x200 mm or higher IP 65 with metric knockouts for cable entry with 3-Phase in- coming and out going connection consists of 3-Phase and neutral terminal and 15 Amps K-fuse as per relevant ISS, with suitable bridge arrange- ment with 4nos copper bus bar of 63A capacity and all necessary accessories as per site requirement, cables are to be terminated with proper socketing arrangement to complete job. | — | — | — | 358.4 | |
| — | 2.00 | — | — | ||
| Supply, testing of Self Priming Centrifugal Monoblock Pump-Motor set with mounting base cage, steel impeller, Capacity - 5 HP/3.7 KW, Suitable for 3 phase, 415V, 10 Mtr Head, Discharge-1680 LPM, Suction x Delivery size 100 x 100 mm. and Starter, suitable for 5 HP three phase pump set. | — | — | — | 1,01,008 | |
| — | 2.00 | — | — | ||
| Erection and installation of Self Priming Centrifugal Monoblock Pump-Motor set with mounting base cage, steel impeller, Capacity - 5 HP/3.7 KW, Suitable for 3 phase, 415V, 10 Mtr Head, Discharge-1680 LPM, Suction x Delivery size 100 x 100 mm. and Starter, suitable for 5 HP three phase pump set. | — | — | — | 10,100.8 | |
| — | 20.00 | — | — | ||
| "Point Wiring by PVC conduit /PVC Casing & Capping : -- Internal wiring for light, fan , plug points and night lamp points by 1.5 sq.mm Cu. cable, 660 Volt grade, Make of Cable: Havells/KEI/ Polycab /RR Kabel/VGuard through PVC conduit pipe of (25 mm dia and 1.5 mm thickness/PVC Casing & Capping of thickness 1.2 mm), Make of PVC Condit Pipe: Polycab/AKG/Presto plast/ Precision and piano type switches, batton holder, ceiling rose, sockets to be provided as and where required as per direction of consignee on phenolic covered switch board of suitable size with continuous earthing by 14 SWG tinned Cu. wire / by 1 Sq.mm PVC Cu wire (Provision of fan regulator should be kept on switch board) *Each switch board should contain flash type fuse of 5A capacity. *All switches, batton holder, ceiling rose, 5A socket etc. will be make of L&T/Havells/Polycab/HPL conforming to IS approved reputed brand.( Two 5-ampere socket point treated as one point),Two blank space is required in each modular switch board. | — | — | — | 7,796 | |
| — | 80.00 | — | — | ||
| "Circuit/Sub-circuit wiring by PVC conduit/PVC casing capping wiring by 2.5 sq.mm Cu.cable, 660 Volt grade Make of Cable: Havells/KEI/ Polycab /RR Kabel/VGuard through PVC conduit (25 mm dia and 1.5 mm thickness/PVC Casing & Capping of thickness 1.2 mm) Make of PVC Condit Pipe: Polycab/AKG/Presto plast/ Precision and continuous earthing by 14 SWG tinned Cu. wire/1 Sq. mm PVC Cu. wire to be provided as and where required as per direction of consignee. *Quantity per meter means-one meter conduit with 2 (two) meters Cu. cable & 1mtr of 14 SWG tinned Cu. wire/1.5Sq.mm PVC Cu. as earthing with Supply of PVC Circular Box and Ceiling rose with connection 1.5 Sq.mm PVC wire from running circuit ( 2.5 Sq.mm PVC wire) as per direction of Consignee. | — | — | — | 4,648 | |
| — | 40.00 | — | — | ||
| Circuit/Sub-circuit wiring by PVC conduit/PVC casing capping wiring by 4 sq.mm Cu.cable, 660 Volt grade make-Polycab /Finolex / Havells/KEI through PVC conduit (25 mm dia and 1.5 mm thickness/PVC Casing & Capping of thickness 1.2 mm) make-Kalinga/Presto plus/Precission and continuous earthing by 14 SWG tinned Cu. wire/2.5 Sq. mm PVC Cu. wire to be provided as and where required as per direction of consignee . *Quantity per meter means-one meter conduit with 2 (two) meters Cu. cable & 1mtr of 14 SWG tinned Cu. wire. | — | — | — | 2,622.8 | |
| — | 40.00 | — | — | ||
| "Circuit/Sub-circuit wiring by PVC conduit/PVC casing capping wiring by 6 sq.mm Cu.cable, 660 Volt grade make-Polycab /Finolex / Havells/KEI through PVC conduit (20 mm dia and 1.5 mm thickness/PVC Casing & Capping of thickness 1.2 mm) make-Kalinga/Presto plast/Precission and continuous earthing by 14 SWG tinned Cu. wire/2.5 Sq. mm PVC Cu. wire to be provided as and where required as per direction of consignee. *Quantity per meter means-one meter conduit with 2 (two) meters Cu. cable & 1mtr of 14 SWG tinned Cu. wire. | — | — | — | 4,282.32 | |
| — | 6.00 | — | — | ||
| "Supply of Earthing arrangement with supply of earth cone and all other requisite materials as per CEE/GRC's Drg. No.CEE/G/A-3/P-150 including sump box with salt and charcoal,metalic cover etc.Cost also includes supply and connection of 35X3 SWG GI strip between earth pole and main switch/DB/Rail pole etc. as per site supervisor's instruction. Cost also includes earth clamp of size 50X6mm GI and testing of earth resistance. Make of GI pipe of Medium (B Class) | — | — | — | 9,249.96 | |
| — | 6.00 | — | — | ||
| Erection of Earthing arrangement with commissioning of earth cone and all other requisite materials as per CEE/GRC's Drg. No.CEE/G/A-3/P-150 including sump box with salt and charcoal,metalic cover etc.Cost also includes connection of 35X3 SWG GI strip between earth pole and main switch/DB/Rail pole etc. as per site supervisor's instruction. Cost also includes connection of earth clamp of size 50X6mm GI and testing of earth resistance. | — | — | — | 4,730.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
cablespec.pdf
ATTACHMENT
GeneralConditions.pdf
ATTACHMENT
GCC 2022
ATTACHMENT
GCC-2022Correctionslip1.pdf
ATTACHMENT
AdvanceCorrectionSlipNo.2.pdf
ATTACHMENT
MANDATEFORM.pdf
ATTACHMENT
CerInfregEmp.Par.ofRet.RailwayEmployees.pdf RAILWAY EMPLOYMENT CERTIFICATE
ATTACHMENT
ANNEXURE-V.pdf
ATTACHMENT
JPOfordiggnigwork.pdf
ATTACHMENT
ExplanatorynotestoreSRC.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27_04_22.pdf
ATTACHMENT
CerInfregEmp.Par.ofRet.RailwayEmployees.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .