Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-AOC PLOT NO 17 18 EWS COLONY NEAR LIG COLONY SINGRAULI SINGRAULI SIDHI MADHYA PRADESH 486889 UDYAM MP 11 0000525 | SINGRAULI | MADHYA PRADESH | 486889 | ₹2.9 L | L1 | Accepted-AOC L1 eligible bidder |
| 2 | Rejected-Technical ALAKHRAJ BHAWAN NEAR MAMTA MOTORS BHUSA MORE WARD NO 7 SINGRAULI M P 486889 | SINGRAULI | MADHYA PRADESH | 486889 | - | - | Rejected-Technical L2 bidder |
| 3 | Rejected-Technical MAIN ROAD BEALUNJI P O WAIDHAN DISTT SINGRAULI M P | SINGRAULI | MADHYA PRADESH | - | - | Rejected-Technical L3 bidder |
| Sl No | Description | Qty | Unit | M/S SARCO ENGINEERING WORKS L1 | M/S. ATUL ENTERPRISES L1 | M/S. SHIV SHANKAR ELECTRICAL CIVIL ENGINEERING L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cleaning of transformer switch yard i.e. cleaning of dirt, dust and dry leaves, washing of stone chips, uprooting of grass and again spreading of stone chips in proper way before and after monsoon or as per instruction of EIC, Trimming of tree branches and bushes around and under overhead line (33KV, 6.6KV, 3.3KV, 440V, 220V) and dispose throw it up at suitable place pre and during monsoon period at Block-B mines by engaging 450 unskilled man days (05 unskilled persons per days as per requirement and direction of EIC) during monsoon period. | 90 | Days | 2,700 ₹2.4 L | 2,700 ₹2.4 L | 2,700.5 ₹2.4 L |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Updated dates
Tender Value
₹3.2 L
EMD Value
₹4,000
Closing Date
13 Mar 2026, 10:00 amClosed
GM(EnM), Block-B Area
Office of GM(EnM), Block-B Area
Cleaning of sub-station yard, Trimming of tree branches and bushes around and under overhead line (33KV, 6.6KV, 3.3KV, 440V, 220V) and dispose throw it up at suitable place pre and during monsoon period at Block-B mines
2026_NCL_354242_1
NCL/BB/EnM/Tender/25-26/28 dt. 23.02.2026
Open Tender
Miscellaneous Works
180 days
Block-B Project
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,000
14 Apr 2026
25 Feb 2026
14 Mar 2026
25 Feb 2026
13 Mar 2026
26 Feb 2026
25 Feb 2026 - 4 Mar 2026
Cleaning of transformer switch yard i.e. cleaning of dirt, dust and dry leaves, washing of stone chips, uprooting of grass and again spreading of stone chips in proper way before and after monsoon or as per instruction of EIC, Trimming of tree branches and bushes around and under overhead line (33KV, 6.6KV, 3.3KV, 440V, 220V) and dispose throw it up at suitable place pre and during monsoon period at Block-B mines by engaging 450 unskilled man days (05 unskilled persons per days as per requirement and direction of EIC) during monsoon period.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.28 MB
BOQ_367065.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid