Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.1 LAccepted-AOC | L1 | Accepted-AOC L1Bidder | |
| 2 | L2₹42.5 L+₹94,653 (2.28%)Rejected-AOC | L2 | Rejected-AOC L2Bidder | |
| 3 | L3₹42.6 L+₹97,908 (2.35%)Rejected-AOC | L3 | Rejected-AOC L3Bidder |
Tender Value
₹34.1 L
EMD Value
₹68,000
Closing Date
17 Mar 2023, 6:00 pmClosed
Superintending Engineer, OMC-I, 2X500MW
Office of Superintending Engineer, OMC-I, 2X500MW, DTPP, Anpara
Routine and Breakdown Maintenance work of C.W. pumps, C.W. Make-up Pumps, HVAC Pumps, Raw Water Pumps (PT and AHP), Misc. Pump Misc. tank and Fuel oil system with its accessorie of 2X500MW DTPS Anpara.
2023_RVUNL_776708_1
11/DTPS/OMC-I/CAD/2023-24.
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
Office of Superintending Engineer, OMC-I, 2X500MW
AS Per PQC9o
3 documents required · 3 mandatory
₹1,180
Dy. C.A.O, C.F.A. B.O., DTPS
₹68,000
6 Jan 2024
21 Feb 2023
20 Mar 2023
21 Feb 2023
17 Mar 2023
21 Feb 2023
Daily/Shift-wise maintenance of 08 No’s CW Pumps, 08 Nos Hydraulic Power Pack System and its auxiliaries installed at CW Pump House, DTPS, Anpara, system round the clock (As per scope of work job no.1.01)
General Upkeep & Routine Maintenance of misc pump and its accessries of 2X500 MW, DTPS, Anpara, Sonebhadra. (As per scope of work job no.1.02).
Round the ckock routine maintenance and operational assistance of 02 No’s Raw Water Pumps (PT), 02 Nos Raw Water Pumps (AHP) and its auxiliaries installed at Auxiliary Pump House, Anpara. (As per scope of work job no.1.03.)
General Shift maintenance of fuel oil pressurizing pumps (HFO & LDO), Drain oil pumps, sump pumps and its accessories installed FOPH and tank area of DTPS, 2X500 MW DTPS, Anpara, Sonebhadra. (As per scope of workjob no.1.04).
General maintenance and upkeeping of fuel oil transfer pumps (HFO & LDO), Drain oil pumps, sump pumps and its accessories installed Fuel oil transfer pump house (near Fuel Oil Pump House ‘A’TPS) of 2X500 MW DTPS, Anpara, Sonebhadra. (As per scope of workjob no.1.05).
Breakdown/overhauling of CW pumps (In case of Failure of pump due to any reason as per scope of work)
Replacement of Spherical Roller Bearing/ Maintenance work / any type of breakdown maintenance work in which dismantling of CW Pump up to discharge elbow is required.
Breakdown/ overhauling of hydraulic power pack.
Replacement of expansion below/ butterfly valves of CW pump discharge line as per scope of work.
Breakdown/overhauling of CW- make pumps.
Breakdown/overhauling of HVAC make-up Pumps
Replacement of damaged gasket of different size of flanges from 50 mm to 600 mm.
Overhauling of valves in water pipe line at different location from 50 mm to 1800 mm.
Servicing of Air vents and vents valves of CW system.
Decoupling Alignment & coupling of pumps with its motor as per requirment or on request of Electrical Maintenance Division.(As per Scope of Work.)
Complete overhauling/ servicing of the Raw Water pumps(AHP)
Complete overhauling/ servicing of the Raw Water pumps(PT)
Complete overhauling/ servicing of the DM- Make pumps
Complete overhauling/ servicing of the Boiler fill Pumps
Complete overhauling/ servicing of the Service Water Pumps
Complete overhauling/ servicing of the APH Wash Water Pump
Complete overhauling/ servicing of the Lubricating Water Pump for Raw Water Pump (PT & AHP)
Complete overhauling/ servicing of the Condensate Transfer Pump
Complete overhauling/ servicing of the DM Transfer Pumps
Cleaning of jungle including uprooting of grass, wild vegetation bushes, small trees around and in between the gap of pipeline of raw water and around CW Pump house.
Overhauling of Discharge Valve & NRV of Raw Water pumps(AHP)( fitted with butterfly discharge valve)
Overhauling of Discharge Valve & NRV of Raw Water pumps(PT)( fitted with butterfly discharge valve)
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Raw Water pumps(AHP)
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Raw Water pumps(PT)
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of DM- Make pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Boiler fill Pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Service Water Pumps
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of APH Wash Water Pump
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of Condensate Transfer Pump
Checking, attending of pump bearing (both end) and replacement, if required and alignment followed by trial run of DM Transfer Pumps
Attending the breakdown of the pump for any part or sub assembly in the set of Raw Water pumps(AHP)
Attending the breakdown of the pump for any part or sub assembly in the set of Raw Water pumps(PT) (in case complete pump set is required to be opened)
Attending the breakdown of the pump for any part or sub assembly in the set of DM- Make pumps. (in case complete pump set is required to be opened)
Attending the breakdown of the pump for any part or sub assembly in the set of Boiler fill Pumps. (in case complete pump set is required to be opened)
Attending the breakdown of the pump for any part or sub assembly in the set of Service Water Pumps. (in case complete pump set is required to be opened)
Attending the breakdown of the pump for any part or sub assembly in the set of APH Wash Water Pump. (in case complete pump set is required to be opened)
Attending the breakdown of the pump for any part or sub assembly in the set of Condensate Transfer Pump. (in case complete pump set is required to be opened)
Attending the breakdown of the pump for any part or sub assembly in the set of DM Transfer Pumps. (in case complete pump set is required to be opened)
Complete Servicing & Overhauling Of pressurizing Fuel oil pumps along with replacement of all worn out damaged components.
Complete Servicing & Overhauling Of Transfer Fuel oil pumps along with replacement of all worn out damaged components.
Complete Servicing & Overhauling Of Drain oil pumps along with replacement of all worn out damaged components.
Complete Servicing & Overhauling Of Oil water separator pumps along with replacement of all worn out damaged components.
Complete Servicing & Overhauling Of oil sump pumps along with replacement of all worn out damaged components.
Complete Servicing & Cleaning Of Fuel Oil suction Strainer.
Complete Servicing & Overhauling Of Valves , size:450 Nb
Complete Servicing & Overhauling Of Valves , size:300 Nb
Complete Servicing & Overhauling Of Valves , size:250 Nb
Complete Servicing & Overhauling Of Valves , size:200Nb
Complete Servicing & Overhauling Of Valves , size:150Nb
Complete Servicing & Overhauling Of Valves , size:100 Nb
Complete Servicing & Overhauling Of Valves , size:80 Nb
Complete Servicing & Overhauling Of Valves , size:50 Nb
Complete Servicing & Overhauling Of NRV`s , size:450 Nb
Complete Servicing & Overhauling Of NRV`s , size:250Nb
Complete Servicing & Overhauling Of NRV`s , size:150 Nb
Complete Servicing & Overhauling Of NRV`s , size:100Nb
Complete Servicing & Overhauling Of NRV`s , size:80 Nb
M/S NISHA ENTERPRISES
TECHCON ENGINEERS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .