Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.4 LAdmitted-Finance | -8.55% | ₹19.4 L | L1 | Admitted-Finance |
| 2 | L2₹20.9 L+₹1.5 L (7.70%)Admitted-Finance 00 BALIHAWAN DEH MAFI BALIHAWAN DEH MAFI KAUSHAMBI KAUSHAMBI UTTAR PRADESH 212202 | KAUSHAMBI | UTTAR PRADESH | 212202 | -1.51% | ₹20.9 L+₹1.5 L (7.70%) | L2 | Admitted-Finance |
| 3 | L3₹21.1 L+₹1.7 L (8.80%)Admitted-Finance | -0.50% | ₹21.1 L+₹1.7 L (8.80%) | L3 | Admitted-Finance |
| 4 | L4₹21.2 L+₹1.8 L (9.35%)Admitted-Finance | +0.00% | ₹21.2 L+₹1.8 L (9.35%) | L4 | Admitted-Finance |
Tender Value
₹21.2 L
EMD Value
₹2.1 L
Closing Date
23 Jul 2026, 3:00 pmClosed
EO
NAGAR PALIKA PARISHAD MUZAFFARNAGAR
Ward No. 17 Kukra sthit composit vidhalaya me marammat adi ka karya
2026_DOLBU_1166102_10
643/E-TENDER/PWD/NPP/2026-27 DT 03-07-2026
Open Tender
Civil Works
Percentage
60 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,357
EO
₹2.1 L
20 Aug 2026
4 Jul 2026
23 Jul 2026
4 Jul 2026
23 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation in Ordinary Soil.(SI. No. 251) | 2.03 | cum | 90 | ₹182.7 |
| 2 | Laying base concrete in 1:6:12 c/fs/bb mortar. [SI.No.273] | 57.17 | cum | 2,985 | ₹1,70,652.45 |
| 3 | RCC work in 1:1.5:3 c/cs/sg for foundation and footing all complete. [SI.No.287a] | 1.54 | cum | 6,310 | ₹9,717.4 |
| 4 | RCC work in 1:1.5:3 c/cs/sg for plinth beam and top beam all complete. [SI.No.285] | 3.42 | cum | 7,200 | ₹24,624 |
| 5 | RCC work in 1:1.5:3 c/cs/sg for column and wall all complete. [SI.No.289] | 4 | cum | 7,800 | ₹31,200 |
| 6 | MS or Iron work such as reinforcement. | 11 | qtl | 7,851 | ₹86,361 |
| 7 | MS or Iron work such as heavy size iron work. [SI.No. 503] | 6 | qtl | 6,150 | ₹36,900 |
| 8 | Supply and Fixing of Vitrefied tiles 600x600mm size all complete. [SI. No.632 new item 4] | 58 | sqm | 1,400 | ₹81,200 |
| 9 | M-150 Brick work in 1:4 c/cs mortar in super structure. [SI. No.305a] For RCC bench | 14 | cum | 4,900 | ₹68,600 |
| 10 | 12mm thich Plaster in 1:4 c/cs mortar. [SI.No.584a] | 595 | sqm | 160 | ₹95,200 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_2187239.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .