| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.0 CrAdmitted-Finance | -32.70% | ₹4.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.5 Cr+₹51.7 L (12.9%)Admitted-Finance | -24.01% | ₹4.5 Cr+₹51.7 L (12.9%) | L2 | Admitted-Finance |
| 3 | L3₹4.5 Cr+₹54.6 L (13.7%)Admitted-Finance | -23.51% | ₹4.5 Cr+₹54.6 L (13.7%) | L3 | Admitted-Finance |
| 4 | L4₹4.8 Cr+₹82.6 L (20.6%)Admitted-Finance | -18.81% | ₹4.8 Cr+₹82.6 L (20.6%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical as per enclosed |
Tender Value
₹5.9 Cr
EMD Value
₹11.9 L
Closing Date
23 Apr 2025, 6:00 pmClosed
SE W.R Circle Jodhpur
Office Of The SE W.R Circle Jodhpur
Construction of Micro Storage Tank Telwara, Tehsil-Siwana, Dist-Balotra
2025_WRDAS_455690_1
03/2024-25
Open Tender
Civil Works
Percentage
Village Telwara, TEhsil-Siwana, Dist-Balotra
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
EE WRD Jalore
₹11.9 L
Yes
CE WRD Zone JODHPUR
13 Jun 2025
2 Apr 2025
24 Apr 2025
2 Apr 2025
23 Apr 2025
9 Apr 2025
9 Apr 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and clearance of jungle, bushes, shrubs, Ankra/Ipomoea, Julieflora typna etc., on canals and bunds in dry/moist/slushy conditions including disposal as per instruction of the Engineer incharge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. thick jungle | 9,405 | Sqm | 2.5 | ₹23,512.5 |
| 2 | Dag belling (b) over 7.5 cm. To 10 cm. Deep | 1,650 | Rm | 1.2 | ₹1,980 |
| 3 | Benching the base and depositing the excavated material including dressing etc. complete within initial lead upto 50 m. and lift upto 1.5 m. | 1,781.13 | Cum | 97 | ₹1,72,769.61 |
| 4 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect. With lead upto 1250m | 17,517.6 | Cum | 146.25 | ₹25,61,949 |
| 5 | Watering of earth including cost of carriage of water when source of water is (b) Beyond 250 m but up to 3 Km | 17,517.6 | Cum | 22.6 | ₹3,95,897.76 |
| 6 | Compaction of earth or highly weathered strata By mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of at least 98% of Standard Proctor's density | 17,517.6 | Cum | 42 | ₹7,35,739.2 |
| 7 | Supply and laying quarry spalls properly graded but not more than 10 cm. in size with spreading in required profile including all lead and lifts. | 967.1 | Cum | 753 | ₹7,28,226.3 |
| 8 | Supply and laying quarry spalls properly graded but not more than 10 cm. in size with spreading in required profile including all lead and lifts. | 4,420.24 | Cum | 92 | ₹4,06,662.08 |
| 9 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50 m. and lift upto 1.5 m. including dressing of excavated area dewatering wherever required complete in all respect. (b) Hard/dense soil | 2,315.59 | Cum | 95 | ₹2,19,981.05 |
| 10 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50 m. and lift upto 1.5 m. including dressing of excavated area dewatering wherever required complete in all respect. (c) Hard soil mixed with kankar/boulders, morrum | 1,644.03 | Cum | 118 | ₹1,93,995.54 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_818046.xls
BOQ • 0.31 MB
TechnicalBidTelwara.pdf
Tender Documents • 0.91 MB
FinancialBid.pdf
Tender Documents • 4.68 MB
BOQ.xls
BOQ • 0.31 MB
Tenderdocument.pdf
Tender Documents • 0.91 MB
Tenderdocument_2.pdf
Tender Documents • 4.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .