Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.6 LAccepted-Finance A 4 SIDCO INDUSTRIAL ESTATE METTUR DAM 636402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹24.8 L+₹1.1 L (4.80%)Accepted-Finance 7 142 THOTILIL PATTY SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | 2 | Accepted-Finance Satisfied | |
| 3 | 3₹25.7 L+₹2.1 L (8.78%)Accepted-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 3 | Accepted-Finance Satisfied |
| Sl No | Description | Qty | Unit | THIAGARAJAN ENGINEERING CONTRACTOR L3 | DEVI FABRICATORS AND ENGINEERING CONTRACTORS L1 | SKSCONTRACTOR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test | 270 | Joints | 6,770 ₹18,27,900 | 6,240 ₹16,84,800 Lowest | 6,530 ₹17,63,100 |
| 2.00 | Charges for fin welding :Charges for fin welding by cleaning, surface preparation and welding. | 500 | Mtrs | 825 ₹4,12,500 | 760 ₹3,80,000 Lowest | 795 ₹3,97,500 |
| 3.00 | ARC FILLING : Grinding of Boiler tubes for Arc filling of size 150 x 25 mm area for 3 Layers | 40 | Nos. | 3,800 ₹1,52,000 | 3,505 ₹1,40,200 Lowest | 3,670 ₹1,46,800 |
| 4.00 | ARC FILLING : Charges IBR Welder for Arc filling of area 150 x 25 mm by 3 layer | 40 | Nos. | 1,635 ₹65,400 | 1,505 ₹60,200 Lowest | 1,575 ₹63,000 |
| 5.00 | Fin Plate 1000 x 12.7 x 6 mm. | 350 | Nos. | 77.5 ₹27,125 | 71.5 ₹25,025 Lowest | 75 ₹26,250 |
| 6.00 | Cutting gas Oxygen & Acetylene | 4 | Sets | 4,155 ₹16,620 | 3,830 ₹15,320 Lowest | 4,010 ₹16,040 |
| 7.00 | Argon gas for Tig welding | 4 | Sets | 3,355 ₹13,420 | 3,095 ₹12,380 Lowest | 3,240 ₹12,960 |
| 8.00 | Welding electrode Supratherm special 2.5mm with material/ manufacturer's test certificate | 1,890 | Nos. | 9.5 ₹17,955 | 7.7 ₹14,553 Lowest | 8.5 ₹16,065 |
| 9.00 | Welding electrode Supratherm special 3.15mm with material/ manufacturer's test certificate | 2,800 | Nos. | 13 ₹36,400 | 10.5 ₹29,400 Lowest | 12 ₹33,600 |
Tender Value
Refer Docs
EMD Value
₹20,900
Closing Date
9 Sept 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit III Boiler pressure parts AOH 2026 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at Boiler Ist II nd pass area
2026_EB_701459_1
CE / MTPS-I / SE / M-I / BM /OT. 64 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹20,900
Yes
11 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test | 270 | Joints | - | - |
| 2 | Charges for fin welding :Charges for fin welding by cleaning, surface preparation and welding. | 500 | Mtrs | - | - |
| 3 | ARC FILLING : Grinding of Boiler tubes for Arc filling of size 150 x 25 mm area for 3 Layers | 40 | Nos. | - | - |
| 4 | ARC FILLING : Charges IBR Welder for Arc filling of area 150 x 25 mm by 3 layer | 40 | Nos. | - | - |
| 5 | Fin Plate 1000 x 12.7 x 6 mm. | 350 | Nos. | - | - |
| 6 | Cutting gas Oxygen & Acetylene | 4 | Sets | - | - |
| 7 | Argon gas for Tig welding | 4 | Sets | - | - |
| 8 | Welding electrode Supratherm special 2.5mm with material/ manufacturer's test certificate | 1,890 | Nos. | - | - |
| 9 | Welding electrode Supratherm special 3.15mm with material/ manufacturer's test certificate | 2,800 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_843131.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .